Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (2)
• An existing battery energy storage system.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.46 MW
Welkin Road, Bredbury, SK6 2BH (6 components)
• Battery Energy Storage System (2)
• A gas fuelled generating station.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
16.07 MW
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
• Existing 25 MW storage site using Lithium Ion Batteries (2)
• 25 MW storage site using Lithium Ion Batteries
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.29 MW
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (2)
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.55 MW
Land adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (10 components)

battery storage unit (3)

Active • 2028-29 (T-4), 2025-26 (T-1) ...
3.22 MW
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS (11 components)
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution … (2)
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
Active • 2026-27 (T-4), 2024-25 (T-4) ...
1.46 MW
Land North of Clayhill Farm, Westoning, MK45 5JD (7 components)

6.000MW of storage located at Westoning (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1.11 MW
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land North of Heatherywood Road, Kirkcaldy, Fife, KY1 3NW (5 components)

New build storage facility (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (8 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Maidenhead Road, Windsor, SL4 5GD (8 components)
• Battery storage (2)
• Battery strorage unit
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Back Lane, Chesterfield, S44 5XQ (8 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
• A Battery Energy Storage System. (2)
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (5 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 … (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales. (2)
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
Active • 2024-25 (T-4), 2023-24 (T-4) ...