Storage (Duration 1h)

299 unique locations (1308 components) - Page 12 of 12

Potman's Lane, Battle, TN33 9BL (5 components)
• A Battery Energy Storage System (3)
• A Battery Energy Storage System, which has already PQ'd as POTM25
Active • 2025-26 (T-4), 2024-25 (T-4) ...
The Manorway, Stanford-leHope, SS17 9LL (5 components)
• A gas fuelled generating station (2)
• A Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1)
Land North East Of Newton Wood Farm Newtonwood Lane Newton, NEAREST DE55 5SG (4 components)

New build battery storage 50.000MW/50.000MWh one hour duration asset (4)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET NEAREST (4 components)

Battery storage 40.000MW/40.000MWh one duration battery new build (4)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land West Of Mossbank Cottages, Drumcross, Bathgate, EH48 1JX (4 components)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery … (2)
Active • 2025-26 (T-4), 2022-23 (T-4) ...
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
• 0.500MW Battery Energy Storage System (2)
• 0.5MW of demand reduction (2)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
60-70 Reach Road Burwell CB25 0AH (3 components)
• 10MW of onshore wind generation
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
• 49.900MW storage installation
Active • 2024-25 (T-4)
Baglan Energy Park, Briton Ferry, Port Talbot, SA11 2GA (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration Battery Storage Plant.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Ferrymuir Farm, Cupar, KY15 5RW (3 components)

49.900MW one-hour duration battery energy storage facility. (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)

49.99MW Lithium-ion Energy Storage System (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Gipsy Lane, A664, Rochdale, OL11 3HA (3 components)

A Battery Energy Storage System (3)

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Active • 2024-25 (T-4), 2022-23 (T-4) ...
High Flatworth, North Shields, Tyne and Wear, NE29 7SW (3 components)
• New build one-hour duration storage to replace diesel plant (2)
• One-hour duration battery storage project.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land East of Maldon Hall Farm, Maldon, Essex CM9 6HD (3 components)

40 MW/40MWh BESS (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (3 components)

A new battery storage plant, with associated civil works, switchgear and electrical connection. (2)

Active • 2024-25 (T-4), 2021-22 (T-1)
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Belvedere Lane, Milton Keynes, MK17 9JH (2 components)
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated …
Active • 2025-26 (T-4)
Bulls Head Farm Eakley Lanes Goldington Newport Pagnell Buckinghamshire MK16 8LP (2 components)

0.800MW Battery Energy Storage System (2)

Active • 2025-26 (T-4), 2024-25 (T-4)
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)

New Battery Storage Site comprising brand new batteries & inverters

Active • 2025-26 (T-4)
Goosehall Farm, Factory Road, Burwell, CB25 0BN (2 components)

A 5MW/5MWh Storage: minimum 1.0 hour duration battery facility sharing an existing connection with an existing solar farm but electrically separate with its own independent Import and Export metering system … (2)

Active • 2025-26 (T-4), 2022-23 (T-1)