Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2h)

509 unique locations (1516 components) - Page 1 of 21

Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
• New build gas reciprocating multi-engine generating plant (4)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
• Battery Storage plant
• Gas reciprocating engines
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
• ... and 1 more unique description
Active • 2027-28 (T-4), 2026-27 (T-4) ...
817.08 MW
Eccles Birgham Farm TD12 4LU (9 components)
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
• 50MW battery storage located near to the SPT Eccles substation
• 50MW battery storage located near to the SPT Eccles substation.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.82 MW
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (3 components)
• New Build Battery Storage (2)
• New build battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
197.67 MW
Land off Hogshaw Road, Granborough, Buckingham, MK18 3NL (2 components)

Battery Storage Plant (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
181.63 MW
Todrig Farm Coldstream TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
148.15 MW
Netherton Farm, Keith AB55 5PE (12 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's (2)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
124.49 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries. (2)

Active • 2027-28 (T-4), 2026-27 (T-4)
107.63 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
89.14 MW
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (2 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

Active • 2027-28 (T-4)
86.18 MW
Land south of the Rayleigh Main Substation, SS11 8TZ (1 component)

New build generating battery storage unit

Active • 2028-29 (T-4)
83.76 MW
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System. (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
79.30 MW
75.38 MW
Braehead Farm Riccarton Kilmarnock KA1 5LN (4 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land, approximately 250 Metres north of Kilmarnock Substation. …

Active • 2028-29 (T-4)
71.20 MW
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (2 components)

2H duration Lithium Ion Battery Storage New Build CMU. (2)

Active • 2028-29 (T-4), 2027-28 (T-4)
70.27 MW
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
Active • 2028-29 (T-4), 2027-28 (T-4) ...
67.74 MW
63.81 MW
Land at Devilla Forest, Near Culross, Fife, KY12 8EW (2 components)
• New Build Battery Storage
• New build battery storage
Active • 2028-29 (T-4), 2027-28 (T-4)
61.83 MW
Loading map...
Showing 25 locations