Elsecar Road, Brampton Bierlow, West Melton, Rotherham, S63 6LS (3 components)

New Build Battery Storage Facility (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.41 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• New build battery storage CMU with CMU ID 24AUC1
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.54 MW
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)

A new build 49.5MW battery energy storage system (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (5 components)
• 49.5MW Battery Energy Storage facility (2)
• 49.9MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (3 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Active • 2024-25 (T-1), 2023-24 (T-1)
18.33 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (8 components)
• 49.5MW Battery Energy Storage facility (2)
• Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)

49.5 MW Battery Energy Storage facility (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Clay Tye Road, Upminister, RM14 3PL (7 components)

49.5MW Battery Energy Storage facility connected to 132kv network (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Lowfields Way, Lowfields Business Park, HX5 9DA (5 components)
• BATTERY STORAGE PLANT
• New build battery storage
• New build generating storage unit
Active • 2028-29 (T-4), 2025-26 (T-4) ...
15.71 MW
Rusholme Grange, Drax, YO8 8PW (4 components)
• New build 35MW Battery Energy Storage System (2)
• Lithium-ion Battery Energy Storage System
Active • 2025-26 (T-4), 2024-25 (T-1) ...
12.96 MW
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
• A new build 32MW battery energy storage system
• A new build 34MW battery energy storage system
• A new build 34MW battery energy storage system commissioned in July 2021
Active • 2024-25 (T-4), 2023-24 (T-1) ...
12.59 MW
Land east of A981, Fraserburgh, Aberdeenshire (2 components)

12 x 3.800MW / 7.491MWh storage units installed on land adjacent to A981, Fraserburgh (2)

Active • 2026-27 (T-4), 2023-24 (T-1)
10.63 MW
Bristol Avenue, Blackpool, FY2 0JF (5 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
9.61 MW
Blandford Road, Poole, BH16 6AB (4 components)
• A 25 MW Battery Storage Site
• A 25MW Battery Storage Site
• A 25MW New Build Battery Storage Site
Active • 2026-27 (T-4), 2025-26 (T-1) ...
9.53 MW
Barton Hill Way, Torquay, TQ2 8JG (6 components)
• New Build CMU comprising of battery storage and associated plant (2)
• Existing CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
8.72 MW
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (7 components)

Battery Storage Plant (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
8.56 MW
UK Power Reserve, Traston Road, Newport, South Wales, NP19 4RQ (4 components)
• CMU ID 22NEW4, a new build battery storage CMU
• CMU ID 23NEW1, a new build battery storage CMU
• CMU ID 24NEW1, a new build battery storage CMU
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.47 MW
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point) (5 components)
• The CMU is a 8MW/16MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV plant, and … (2)
• The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, …
Active • 2027-28 (T-4), 2026-27 (T-4) ...
8.28 MW
Farnham Battery Storage, Wrecclesham Hill, Farnham, GU10 4JU (2 components)

A new build 20MW battery energy storage system

Inactive • 2023-24 (T-1)
7.40 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (7 components)
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises … (2)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works …
Active • 2024-25 (T-4), 2024-25 (T-1) ...
7.40 MW
Loading map...