Theme

Storage (Duration 2h)

86 unique locations (481 components) - Page 1 of 4

Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
• New build gas reciprocating multi-engine generating plant (4)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Netherton Farm, Keith AB55 5PE (12 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's (2)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
124.49 MW
59.53 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• BESS project to be installed within a future Greener Grid Park. (3)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
37.96 MW
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
34.03 MW
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
24.36 MW
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.99 MW
Land at Harrow Lane, Bulphan, Thurrock, Essex RM14 3RE (3 components)

Lithium-based battery energy storage system. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.46 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV. (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
22.04 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 Hour Battery Storage Plant.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR (3 components)
• A Lithium Ion Energy Storage System (2)
• A 49.9 Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.70 MW
Titchfield Lane, Wickham, Fareham PO15 6DY (3 components)

CMU component consisting of a battery cell for electricity storage connected at Titchfiled Lane. New building BESS(Battery Energy Storage System) (3)

Active • 2027-28 (T-4), 2025-26 (T-1) ...
21.23 MW
Auchteraw Farm, Fort Augustus, PH32 4BT (4 components)
• New build battery storage CMU with CMU ID 22AUC1
• New build battery storage CMU with CMU ID 22AUC4
• New build battery storage CMU with CMU ID 23AUC1
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.54 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
• A New Build battery energy storage system. (3)
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
Active • 2026-27 (T-4), 2025-26 (T-1) ...
20.46 MW
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
20.27 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (8 components)
• 49.5MW Battery Energy Storage facility (3)
• 48MW Battery Energy Storage facility
• Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)
• 49.5 MW Battery Energy Storage facility (3)
• 48 MW Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
18.33 MW
Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (3 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Active • 2024-25 (T-1), 2023-24 (T-1)
18.33 MW
LAND EAST OF TEBWORTH, LEIGHTON BUZZARD, CENTRAL BEDFORDSHIRE, LU7 9QD. (3 components)

Lithium-based battery energy storage system (3)

Active • 2026-27 (T-4), 2025-26 (T-1) ...
17.92 MW
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
• A new build 49.5MW battery energy storage system (4)
• A new build battery energy storage system
Active • 2026-27 (T-4), 2025-26 (T-4) ...
17.59 MW
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 hour battery storage system.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
16.17 MW
Lowfields Way, Lowfields Business Park, HX5 9DA (5 components)
• New build battery storage (3)
• BATTERY STORAGE PLANT
• New build generating storage unit
Active • 2028-29 (T-4), 2025-26 (T-4) ...
15.71 MW
Loading map...
Showing 25 locations