Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
• New build gas reciprocating multi-engine generating plant (4)
• Battery storage unit
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3416.01 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2549.84 MW
Netherton Farm, Keith AB55 5PE (12 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's (2)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
124.49 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.20 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• ... and 2 more unique descriptions
Active • 2027-28 (T-4), 2025-26 (T-4) ...
93.41 MW
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System. (2)

Active • 2028-29 (T-4), 2025-26 (T-4)
79.30 MW
Land at Somerford Farm, SN16 9RN (4 components)
• A Battery Energy Storage System (3)
• A Battery Energy Storage System.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
58.18 MW
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (4 components)

A Battery Energy Storage System. (4)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
46.96 MW
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
• BESS to be installed within a Greener Grid Park
Active • 2028-29 (T-4), 2026-27 (T-4) ...
39.02 MW
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (3 components)

A Battery Energy Storage System (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
38.94 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
• BESS project to be installed within a future Greener Grid Park. (3)
• 50MW of BESS to be installed within a future Greener Grid Park. (2)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
37.96 MW
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)
• A Battery Energy Storage System. (3)
• A New Build Gas fuelled power plant.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
35.65 MW
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
34.03 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed … (3)
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield … (2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.13 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.15 MW
Ipswich Road, Cardiff, CF23 9AQ (10 components)
• New build two-hour duration battery storage (2)
• New build one-hour duration storage
Active • 2028-29 (T-4), 2026-27 (T-4) ...
25.98 MW
Land at Mill Hill Substation, Partingdale Road, Barnet, NW7 1NT (3 components)

A Battery Energy Storage System. (3)

Active • 2027-28 (T-4), 2026-27 (T-4) ...
22.24 MW
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
• New Build 2 Hour Battery Storage Plant.
• ... and 1 more unique description
Active • 2026-27 (T-4), 2025-26 (T-4) ...
22.03 MW
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
20.27 MW
20.22 MW
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX (4 components)
• A Battery Energy Storage System (3)
• A Battery Energy Storage System.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
19.47 MW