-
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
(2)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
2549.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Unit 1 fuelled by Biomass at Drax Power Station
-
• Unit 2 fuelled by Biomass at Drax Power Station
-
• Unit 3 fuelled by Biomass at Drax Power Station
2238.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
(2)
-
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
472.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Lynemouth Power Station Unit 1
-
• Lynemouth Power Station Unit 2
-
• Lynemouth Power Station Unit 3
352.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
-
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
-
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
268.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations.
(3)
121.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington …
(3)
98.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
(2)
-
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export …
95.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …
(3)
72.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Thermal incineration of biomass to supply steam turbine.
(2)
68.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
Existing Energy from Waste Plant
(3)
64.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing Energy from Waste Plant
(3)
61.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Steam turbine supplied by boiler burning biomass.
(2)
58.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 …
(3)
51.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic …
(2)
-
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic …
46.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator.
(3)
40.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included …
(3)
38.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator.
(3)
38.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing Energy from Waste Plant
(3)
28.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing Energy from Waste Plant
(3)
27.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Incineration of biomass to generate steam which drives a turbine.
(2)
24.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
Incineration of biomass to generate steam to drive steam turbine.
(2)
21.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.
(3)
19.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing Energy from Waste Plant
(3)
18.9 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.
(3)
17.6 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
Incineration of biomass to generate steam which drives a turbine.
(2)
14.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• Energy from Waste Facility located in Grace Road, Exeter.
(2)
-
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and …
10.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Energy from Waste facility located in Bedfordshire. The Facility will utilise conventional mass-burn technology, which is the most well proven Energy from Waste technology currently available. The process will consist …
Inactive -
2021-22 (T-4)
-
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW
(2)
-
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change …
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
An energy from waste facility located in North Wales and designed to generate electricity
Inactive -
2021-22 (T-4)
Aberthaw 7 Coal fired unit
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Energy from Waste plant
Inactive -
2021-22 (T-4)
Waste and biomass being combusted to raise steam to bar through a steam turbine
Inactive -
2021-22 (T-4)
-
• Cottam Power Station CMU 1 CT1-17 = 100% (T_COTPS-1) + 25% (T_COTPS-S)
-
• Cottam Power Station CMU 2 CT2-17 = 100% ( T_COTPS-2) + 25% (T_COTPS-S)
-
• Cottam Power Station CMU 3 CT3-17 = 100% (T_COTPS-3) + 25% (T_COTPS-S)
Inactive -
2021-22 (T-4)
-
• Aux. load separately metered
-
• GT5
-
• GT8
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
Municipal Waste Incineration Plant located in Hoddesdon, Hertfordshire. It is based on two boilers supplying steam to a turbine-generator.
Inactive -
2021-22 (T-4)
-
• West Burton A Power Station CMU 1 WA1-17 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
-
• West Burton A Power Station CMU 2 WA2-17 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
-
• West Burton A Power Station CMU 3 WA3-17 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
(3)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• 2 stream Municipal waste incinerator: Total installed capacity 7.3MW, DNC 6.2MW
(2)
-
• 2 stream Municipal waste incinerator: Total installed capacity 7.4MW, DNC 6.3MW. We have added covering letters on the following, change …
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• Aberthaw 7 OCGT fuel type distillate
-
• Aberthaw 8 Coal fired
-
• Aberthaw 8 OCGT fuel is distillate
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• New Build Energy from Waste Plant
(2)
-
• Existing Energy from Waste Plant
Inactive -
2018-19 (T-1),
2017-18 (T-1),
2016-17 (TR)
-
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being …
(2)
-
• 2 stream municipal waste incinerator
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Generating Unit 1
-
• Generating Unit 2
-
• Generating Unit 3
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
The facility will be an Energy from Waste plant burning 360,000t of Refuse Derived Fuel per annum to produce electricity
Inactive -
2021-22 (T-4)
Energy from waste Facility
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Energy from Waste facility
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2021-22 (T-4)
Energy From Waste facility
(2)
Inactive -
2023-24 (T-4),
2021-22 (T-4)
-
• New Build Energy from Waste Plant
(2)
-
• Existing Energy from Waste Plant
Inactive -
2018-19 (T-1),
2017-18 (T-1),
2016-17 (TR)
FM1 is a twin boiler, single steam turbine energy from waste plant exporting at 132kV to the NPG area network.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Energy from Waste Facility
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 2 more)