Home List View Map View Technologies Companies Support Us Help Login Register
Theme

CHP and autogeneration

41 unique locations 93 components 0 companies Page 1 of 1
Map View
Power Station Road Isle of Grain Rochester ME3 0AR (55 components)
  • • Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
  • • Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
  • • Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
  • • ... and 2 more unique descriptions
UNIPER UK LIMITED CHP and autogeneration Combined Heat and Power (CHP) Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Diesel)
4000.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Saltend Power Station Saltend Hull HU12 8GA (33 components)
  • • Unit 1 at Saltend Power Station (2)
  • • Unit 2 at Saltend Power Station (2)
  • • Unit 3 at Saltend Power Station
SALTEND COGENERATION COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
3107.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Bo'ness Road Grangemouth Stirlingshire FK3 9XQ (12 components)

CHP Plant connected to Private Wire System (operated by INEOS Infrastructure (Grangemouth) Limited) with Connection to NETS (5)

GRANGEMOUTH CHP LIMITED CHP and autogeneration Combined Heat and Power (CHP)
259.8 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
RRRL-EfW Facility Norman Road North Belvedere Kent DA17 6JY (13 components)

Energy from Waste Recovery Facility (12)

RIVERSIDE RESOURCE RECOVERY LIMITED Energy from Waste CHP and autogeneration
206.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Sembcorp UK Headquarters, Wilton International, Middlesbrough, TS90 8WS (21 components)
  • • (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). Unit is a OCGT … (4)
  • • (Please note: CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G01 is a OCGT …
Sembcorp Utilities (UK) Limited CHP and autogeneration Combined Heat and Power (CHP)
184.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Bury St Edmunds Sugar Factory British Sugar plc Hollow Road Bury St Edmunds IP32 7BB (12 components)

The CMU is a gas fired CCGT CHP (5)

BRITISH SUGAR PLC CHP and autogeneration Combined Heat and Power (CHP)
166.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Wissington Sugar Factory British Sugar plc College Road Wissington King's Lynn PE33 9QG (16 components)

The CMU is a gas fired CCGT CHP (5)

BRITISH SUGAR PLC CHP and autogeneration Combined Heat and Power (CHP)
126.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Winnington CHP Winnington Lane Winnington Northwich Cheshire CW8 4GX (31 components)
  • • Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor. (3)
  • • Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
  • • Continuously operating, variable output Man Diesel Turbo single pass-out back pressure turbine driving a 19.300 MVA TD Power Systems generator …
WINNINGTON CHP LIMITED CHP and autogeneration Combined Heat and Power (CHP) Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas)
119.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (12 components)
  • • CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP … (3)
  • • CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S24G02 is a OCGT in CHP … (2)
Sembcorp Utilities (UK) Limited CHP and autogeneration Combined Heat and Power (CHP)
116.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Cargill PLC, Trafford Park, Manchester, M17 1PA (48 components)
  • • Siemens SGT200 based CHP (13)
  • • Solar T70 Based CHP System (13)
  • • Solar T70 based CHP system (13)
CARGILL PLC CHP and autogeneration Combined Heat and Power (CHP)
61.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 11 more)
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (19 components)

The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used. (5)

P3P BREHON LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
41.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Newton Aycliffe CO Durham DL5 6EA (30 components)
  • • This is an existing CHP (4)
  • • This is a long standing existing CHP unit located on land within a manufacturing site.
INOVYN CHLORVINYLS LIMITED CHP and autogeneration Combined Heat and Power (CHP)
21.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
47-53 Charterhouse Street, London, EC1M 6PB (17 components)

A site with two gas engine CHPs, providing hot water to a local district heating network as well as chilled water from an absorption chiller to a district chill network. (5)

CITIGEN (LONDON) LIMITED CHP and autogeneration Combined Heat and Power (CHP)
21.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Cargill PLC, Trafford Park, M17 1PA (16 components)

Siemens SGT200 Based CHP (5)

CARGILL PLC CHP and autogeneration Combined Heat and Power (CHP)
19.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components)

The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year. (5)

SPARK STEAM LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
18.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
100 Montifichet Road, Westfield, Stratford E20 1GR (36 components)

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 … (5)

EAST LONDON ENERGY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
16.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
High Street, Waterham, nr Faversham, Kent ME13 9EJ (10 components)
  • • 6 CHP engines horticultural environment with no auxiliiary load (4)
  • • Two of six CHP engines horticultural environment with no auxiliiary load
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
13.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 6 more)
Southampton General Hospital Tremona Road, Southampton, SO16 6YD (9 components)
  • • 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW (2)
  • • 2X gas reciprocating engines with a total gross power capacity of 3.973 MW (2)
  • • 2*2 gas reciprocating engines with a total gross power capacity of 3.973 MW and a net power capacity of 3.953 …
VEOLIA UK LIMITED CHP and autogeneration Combined Heat and Power (CHP)
10.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 6 more)
Wood End, Stocks Lane, Over Peover, Knutsford WA16 9EZ (16 components)
  • • 2MW gas CHP engine in a horticultural environment (2)
  • • One 2MW gas CHP engine in a horticultural environment (2)
  • • One 1.5 MW gas CHP engine in a horticultural environment
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
10.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Nr 125 Park Lane Cottingham East Yorkshire HU16 5RX (17 components)
  • • CHP at a horticultural environment. (2)
  • • Gas CHP engines in commercial horticultural environment with no auxilliary load (2)
  • • CHP at horticultural site
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
9.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (12 components)
  • • The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used. (3)
  • • The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be … (2)
P3P ENERGY MANAGEMENT AE LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
9.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Fielding & Johnson Building University Of Leicester University Road LEICESTER Leicestershire LE1 7RH (28 components)
  • • Combined Heat and Power Plant, University of Leicester, capacity of generator 1.600MW (3)
  • • Combined Heat and Power Plant, University of Leicester, generator's capacity 1.600MW (2)
LEICESTER DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
8.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
QMC Campus, Nottingham University Hospitals, Queens Medical Centre, Derby Road, Nottingham, NG7 2UH (10 components)

A site with one gas turbine CHP, providing steam and electricity to Queens Medical Centre in Nottingham (5)

E.ON UK PLC CHP and autogeneration Combined Heat and Power (CHP)
8.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (30 components)
  • • 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (3)
  • • 2MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and … (2)
BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Kings Yard Energy Centre, Carpenters Lane, Stratford, London E15 2DU (18 components)

Combined Heat and Power Plant Olympic Park London (12)

EAST LONDON ENERGY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 12 more)
Smurfit Kappa SSK, Mount Street, Nechells, Birmingham B7 5RE (11 components)
  • • 8.300MW Gas Turbine installation (3)
  • • 8.3MW Gas Turbine installation (2)
LIMEJUMP LTD CHP and autogeneration Combined Heat and Power (CHP)
7.6 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA (25 components)
  • • 1.2 MW Combined Heat and Power Engine. (6)
  • • 1.6 MW Combined Heat and Power Engine (6)
  • • 1.6MW Combined Heat and Power Engine (4)
  • • ... and 1 more unique descriptions
EXCEL DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
7.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 8 more)
School Road, Aberdeen AB24 1TU (14 components)

District heating implementation with one asset 1.943MW exporting excess to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
5.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Great Western Rd, Gloucestershire, Gloucester GL1 3NN (9 components)

CHP installation in the Energy Centre of an NHS Hospital. The CHP will be sub metered. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 6 more)
46 Station Road Stokesley Middlesbrough TS9 7AA (10 components)
  • • Gas CHP engines in commercial horticultural usage with no auxilliary load (4)
  • • 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
FLEXITRICITY LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
4.2 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF (14 components)

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the … (5)

LEICESTER DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
International Conference Centre, Birmingham, B1 2EA (15 components)

1.6MW Combined Heat and Power at International Conference Centre (5)

BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
4.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Lansdale Nursery, Jacksmere Lane, Scarisbrick, Ormskirk, Lancs L40 9RT (13 components)

One asset 2.0MW CHP engine in a horticultural environment with no auxiliary load. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
3.6 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
9 Handyside St, Kings Cross, London N1C 4BH (11 components)

Energy Centre with gas CHP engines providing district heating and power to local community. All generation unit capacities are nominal and allow for site-specific variations. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
3.5 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 7 more)
Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW (12 components)

One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
2.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Ashgrove Road West, Aberdeen AB16 5UL (14 components)

District heating implementation with one asset 1.013MW exporting excess capacity to distribution network. Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
2.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Montgomery Road, Aberdeen AB24 2YA (14 components)
  • • District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation … (10)
  • • District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas (2)
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
2.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 10 more)
Sandylands Nurseries, The Cross, Offenham, Evesham Worcestershire WR11 8RB (10 components)

One asset 1.13MW CHP engine in a horticultural environment with no auxiliary load. (5)

FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
2.1 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 7 more)
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (15 components)
  • • Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602 (3)
  • • Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171 (2)
BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
1.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 7 more)
Thearne Lane Woodmansey Beverley HU17 0SA (7 components)
  • • Two gas CHP engines in commercial horticultural environment with no auxilliary load (4)
  • • Gas CHP engines in commercial horticultural environment with no auxilliary load
FLEXITRICITY LIMITED CHP and autogeneration Combined Heat and Power (CHP)
1.0 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 4 more)
Showing locations 1 - 41 of 41