-
• existing on site CHP
(2)
-
• existing onsite CHP
46.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 2 more)
Gas Engine
(3)
39.6 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
-
• existing CHP on site.
(2)
-
• existing on site CHP
28.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 2 more)
-
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA
(2)
-
• One of three CHP units at 1 Thane Road West, Nottingham, NG2 3AA.
17.3 MW
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 2 more)
Gas Turbine Cogeneration Unit GT3
(3)
14.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
-
• No2 Steam turbine - Allen Steam Turbines/NG Model MB510 - 2009 - Nominal power rating 14500kWe
(2)
-
• No5 Gas Turbine - European Gas Turbines SGT200 'Tornado' - S765/01 1997 - Nominal power output 6000kWe
13.2 MW
Inactive -
2023-24 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 2 more)
-
• A 4.5MW gas fired reciprocating engine CHP (Engine 1).
(2)
-
• A 4.5MW gas fired reciprocating engine CHP (Engine 2).
12.2 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
CHP unit
(3)
8.4 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
Turbomach M50 Natural Gas fired CHP unit
(3)
7.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 2 more)
Gas-fired CHP unit
(3)
7.3 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 2 more)
CHP Engine 3.360MW
(3)
6.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
VIT305 - CHP unit at John Radcliffe Hospital, Headley Way, Headington, Oxford, OX3 9DU.
(3)
4.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
Turbomach M50 Natural Gas fired CHP unit
(3)
4.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 2 more)
-
• VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
(2)
-
• VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
3.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
A 3.36MW gas fired reciprocating engine CHP.
(3)
3.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
Existing Generation on existing site - CHP
(3)
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 2 more)
Gas engine
(3)
2.3 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
2026 kW CHP unit
(3)
1.8 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
CHP unit
(3)
1.8 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CHP unit
(3)
1.8 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CHP unit - 1 x 2,000kw
(3)
1.7 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
Gas fired CHP unit
(3)
1.7 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
Cummins HSK78 2,000 kW Gas Engine located at UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF.
(2)
1.6 MW
Inactive -
2023-24 (T-1),
2022-23 (T-1)
1.280MW CHP
(3)
1.2 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
1280 KWe Combined Heat and Power unit.
(3)
1.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
EnerG 1000 CHP
(3)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
MTU - 8V400064 1.013MW
(3)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2022-23 (T-1)
(and 2 more)
EnerG 1000 CHP
(3)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
E1000 CHP
(3)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
E1000 CHP unit
(3)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
CHP unit
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
gas-fired CHP unit
(3)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 2 more)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
(2)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Gas Turbine CHP unit
(3)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2022-23 (T-1)
(and 1 more)
-
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
(2)
-
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Gas fired CHP unit
(3)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
Gas fired CHP unit
(3)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 2 more)
CHP
(3)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 2 more)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(2)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 2 more)
CHPs at Queen Elizabeth Hospital
(3)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• 2.8MWe back pressure steam turbine
(2)
-
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 2 more)
CHP unit
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
Gas fired CHP unit
(3)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 2 more)
-
• Centrax gas turbine CHP
(2)
-
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 2 more)
Gas fired CHP unit
(3)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 2 more)
Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …
(3)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 2 more)
CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
CHP unit
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)