-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
(3)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
1.000 MW CHP generation
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
-
• Eight gas CHP engines for commercial horticultural use with no auxilliary load
(3)
-
• Eight gas CHP; 5 x 1.5MW and 3 x 2.5MW engines. Primary fuel type = Natural Gas
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
-
• Steam Driven Turbo Alternator 8G1 6,8 MWe
(2)
-
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
-
• Steam Driven Turbo Alternator 8G4 7MWe (derated to 4 MWe for mechanical reasons)
-
• ... and 1 more unique descriptions
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 7 more)
A gas turbine installed at Aberdeen Royal Infirmary
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 2 more)
One CHP, generating for site load which exceeds generating capacity. No aux load.
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity to be used on site.
(3)
-
• GE Jenbacher JMS612 containerised gas engine generating set rated at 2.004MW, providing heat and electricity.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
-
• 1.800 MW CHP generation
(3)
-
• 1.8 MW CHP generation
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
-
• CHP Unit
(3)
-
• Gas fired CHP unit
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
CHP
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 2 more)
4.5MWe combined heat and power (CHP) natural gas fired reciprocating engine.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-1)
(and 2 more)
A gas turbine CHP, providing steam and electricity to Hammersmith Hospital
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-1)
(and 2 more)
Two CHP, generating for site load which exceeds generating capacity. No aux load.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 1 more)
-
• Centrax gas turbine CHP
(3)
-
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
CHP
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 2 more)
-
• One of four SURF (Aggreko) model CHP units rated at 1375kVA
(3)
-
• One of four SURF (Aggreko) model CHP units rated at 1375KVA
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 3 more)
One of four SURF (Aggreko) model CHP units rated at 1375kVA
(5)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 3 more)
Fellside CHP is located in Seascale- Cumbria- UK and consists of three GE Frame 6581B gas turbines which are able to run on natural gas or distillate. The primary purpose …
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
-
• The CMU component JENBA1 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
(2)
-
• The CMU component JENBA2 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
(2)
-
• The CMU component JENBA3 is a gas fired CHP engine rated at 1.845MW (1.942MW design output but derated at 95% …
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 2 more)
-
• Gas fired CHP Unit
(4)
-
• Steam Turbine driven by gas fired CHP (component ID KPEG13)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
(and 2 more)
CHP on a hospital site
(4)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2020-21 (T-1)
(and 2 more)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(3)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(2)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
(and 2 more)
-
• CHP unit
(4)
-
• Gas fired CHP unit
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-1)
(and 4 more)
gas-fired CHP unit
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• 2.8MWe back pressure steam turbine
(3)
-
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(8)
-
• Gas fired CHP unit
(4)
-
• CHP Unit
-
• ... and 1 more unique descriptions
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
(3)
-
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(3)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
-
• Gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites which trades at Flavourfresh …
(2)
-
• The component consists of gas CHP (2679kW and 2004kW) servicing the electricity and heat requirements for Aldergrove Nursery, one of …
(2)
-
• The component consists of gas CHP servicing the electricity and heat requirements for Aldergrove Nursery, one of the horticultural sites …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
Gas fired CHP
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
The component consists of gas CHP 3355kW servicing the electricity and heat requirements for Melrow Nursery, one of the horticultural sites which trades at Flavourfresh Salads. The generation unit capacity …
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
0.725MW Combined Heat and Power Plant Royal South Hants Hospital
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
Two gas CHP in a horticultural environment with no aux load
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 6 more)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
-
• Gas fired CHP unit
(4)
-
• CHP plant
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
On-site existing CHP generating unit
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 4 more)
CHP and autogeneration
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 5 more)
-
• A Packaged 3.976MW, 11kV natural gas fired reciprocating engine CHP
(4)
-
• A Packaged 3.976MW, 11kV CHP
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 4 more)
A gas engine CHP site providing steam and electricity to an industrial unit
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 4 more)
CHP
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
1.6MW Combined Heat and Power Plant at Birmingham Children Hospital
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2020-21 (T-4)
(and 1 more)
-
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switchgear and associated controls with a total connection …
(3)
-
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
-
• Gas-fired reciprocating engines fitted with heat and CO2 recovery equipment, plus transformers, switch gear and associated controls with a total …
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2020-21 (T-4)
-
• 1 x 2MW CHP generator; natural gas reciprocating engine; primary fuel type = natural gas
(2)
-
• CHP in a district heating environment, providing heat & electricity to local area and exporting excess.
(2)
-
• 1x2MW CHP generator: natural gas reciprocating engine. Primary fuel type = natural gas
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
(and 1 more)