-
• Gas fired CHP unit
(4)
-
• CHP plant
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
-
• CHP Unit
(3)
-
• Gas fired CHP unit
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
-
• Centrax gas turbine CHP
(3)
-
• Centrax gas turbine which will have bespoke metering in installed to capture the generation output.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
Gas fired CHP unit
(2)
Inactive -
2022-23 (T-1),
2021-22 (T-1)
CHP engines to be installed at existing site at LADYSMITH ROAD, GRIMSBY, DN32 9EE
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
-
• One of six CHP units at University of Warwick, Coventry, CV4 7AL
(3)
-
• One of six CHP units at University of Warwick, Coventry, CV4 7AL.
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 4 more)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GB
(3)
-
• One of three CHP units at Energy Center, Ashton Street, Liverpool, L69 3GBNY 25354 48843
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
gas-fired CHP unit
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
-
• 2.8MWe back pressure steam turbine
(3)
-
• 6.46 MWe Ruston Tornado Gas Turbine (Siemens SG200)
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-4)
(and 7 more)
CHP engines to be installed at HUMBERSTONE ROAD, GRIMSBY, DN32 8HW
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
CHP engines to be installed at: HALEWOOD PLANT, SPEKE BOULEVARD, LIVERPOOL, L24 9LE
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
New CHP engine to be installed at 4 FULLARTON DRIVE, GLASGOW EAST INVESTMENT PARK, GLASGOW, G32 8FA
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-1)
CHP unit
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to 6.MW (other generators are on site are defunct) so the …
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
CHP unit
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CHP unit
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CHP
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
-
• Gas Turbine CHP unit
(4)
-
• Steam turbine
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2022-23 (T-1)
(and 1 more)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(8)
-
• Gas fired CHP unit
(4)
-
• CHP Unit
-
• ... and 1 more unique descriptions
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
(3)
-
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(3)
-
• Combined Heat and Power Plant Grimsby made up of 5 generators totalling 30MW however the export capacity is limited to …
(2)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
-
• Gas fired CHP unit
(4)
-
• CHP unit
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 5 more)
CHP at a water treatment works in Glasgow.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2022-23 (T-1)
Gas fired CHP unit
(4)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CHPs at Queen Elizabeth Hospital
(4)
Inactive -
2024-25 (T-1),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
The CMU component will have a connection capacity of 6MW. Gas-fired reciprocating engine will be the technology used
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 2 more)
-
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV …
(5)
-
• A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV …
(3)
0.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
E1000 CHP unit
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
E1000 CHP
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
EnerG 1000 CHP
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
MTU - 8V400064 1.013MW
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2022-23 (T-1)
(and 2 more)
EnerG 1000 CHP
(5)
0.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
1280 KWe Combined Heat and Power unit.
(5)
1.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
1.280MW CHP
(5)
1.2 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 2 more)
-
• Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific …
(6)
-
• Gas CHP engines 1.37MW and 1.50MW. Primary fuel type = Natural Gas
(2)
1.3 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 8 more)
Cummins HSK78 2,000 kW Gas Engine located at UK WINDOWS & DOORS GROUP LIMITED, 6400 Severn Drive, Tewkesbury, GL20 8SF.
(2)
1.6 MW
Inactive -
2023-24 (T-1),
2022-23 (T-1)
Gas fired CHP unit
(4)
1.7 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CHP unit - 1 x 2,000kw
(3)
1.7 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CHP unit
(3)
1.8 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CHP unit
(4)
1.8 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
2026 kW CHP unit
(5)
1.8 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
Gas engine
(3)
2.3 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
Existing Generation on existing site - CHP
(5)
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 2 more)
A 3.36MW gas fired reciprocating engine CHP.
(4)
3.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• VIT303 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
(3)
-
• VIT503 - CHP unit at Energy Facilities Building, Walsgrave Hospital, Clifford Bridge Road, Coventry, CV2 2DX
3.0 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
Nantwich Existing Site CHP
(8)
3.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Warrington Existing Site CHP
(5)
3.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A gas engine CHP site providing electricity & heat to the associated development
(5)
3.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP
(5)
3.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)