Component has yet to be procured.
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 5 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
-
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to …
(2)
-
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to …
(2)
-
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to …
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-4)
(and 7 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(10)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 10 more)
-
• Office site with behind the meter generation
(3)
-
• Office site with behind the meter back up generation
-
• Office site with behind the meter generation.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(11)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 11 more)
Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(11)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 11 more)
Aggregated Generation - Diesel
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
-
• Load Response - Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(3)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(2)
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 7 more)
Furnaces
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2023-24 (T-1)
(and 7 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Generators on hospital site
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2023-24 (T-1)
(and 7 more)
Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(5)
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 6 more)
Generators at hospital site
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2023-24 (T-1)
(and 7 more)
Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …
(5)
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
CMU INO200 represents demand assets on the Inovyn ChlorVinyls Ltd site in Runcorn, Cheshire. The asset uses electricity for Chemical manufacture. Site load can easily be altered to suit demand …
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
The CMU Component reduces import demand by turning off equipment and other non-essential loads.
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 4 more)
Hanson 2 - DSR Turn Down/ Load Reduction
(5)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2022-23 (T-4)
(and 6 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
Industrial Gases production site. DSR provided through process interruption.
(5)
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Industrial Gases production processes. DSR delivered through process interruption
(4)
-
• Industrial Gases production site. DSR provided through process interruption.
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
(and 5 more)
-
• Battery located behind-the-meter within football stadium, able to reduce imported electricity and/or export to local network
(3)
-
• Battery system installed at Emirates Stadium
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1),
2020-21 (T-1)
(and 1 more)
-
• 3.600MW of demand reduction
(4)
-
• 3.6MW of demand reduction
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 5 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.2 MW of demand reduction
-
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.200 MW of demand reduction
-
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• 0.250MW Battery Energy Storage System
(3)
-
• 0.25MW of Demand Reduction
-
• 5MW of demand reduction
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 2 more)
Hanson site - Is Load Reduction/ Turn Down
(4)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Site is Load Reduction / DSR Turn Down
(4)
Inactive -
2024-25 (T-1),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• 0.500MW Battery Energy Storage System
(2)
-
• 0.5MW of demand reduction
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 1 more)