Home List View Map View Technologies Companies Support Us Help Login Register
Theme

DSR

107 unique locations 493 components 0 companies Page 1 of 3
Map View
Eurac - Dorset, 16 Mannings Heath Road Poole Dorset BH12 (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

GRIDBEYOND LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 2 more)
Yearsley - Holmewood - C, Holmewood Field Industrial Park, Park Rd, Holmewood Industrial Park, Holmewood, Chesterfield, Derbyshire S42 5BX (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

GRIDBEYOND LIMITED DSR
Inactive - 2024-25 (T-4), 2021-22 (T-1)
BOC Motherwell, Chapelknowle Road, Carfin, ML1 5LF (8 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

BOC LIMITED DSR
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1) (and 2 more)
BW020, Dryhill, Queens Avenue, Portishead, Bs20, BS20 6NG (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
BWW028, Sperrings Green, Chewton Mendip, Chewton Mendip, BA3 4LN (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
BWW030, Stowey, Stowey Pstn & Twks, Gold Cross, Pensford, BS39 4DL (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
Long Ln, Moulton, Spalding PE12 6PP, United Kingdom (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

GRIDBEYOND LIMITED DSR
Inactive - 2024-25 (T-4), 2021-22 (T-1)
BWW002, Alderly Pumping, Pumping Station, Alderly, Wotton Under Edge, GL12 7PQ (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

ENEL X UK LIMITED DSR
Inactive - 2021-22 (T-1), 2020-21 (T-4), 2020-21 (T-1)
FORD STREET NORTH - BUS DEPOT 2 FORD STREET COVENTRY CV1 5WT (5 components)
  • • bus depot site (2)
  • • 1.500MW Demand reduction at Coventry Bus Depot
LIMEJUMP LTD DSR
Inactive - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
Blackburn - Haslingdon Road, Haslingden Road, Blackburn, Lancashire, BB1 2PX (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Massmould Ltd - Eaton Socon, Little End Road, Eaton Socon, St Neots, PE19 8JH (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
195 Aylesone Rd, Leicester LE2 7QJ (18 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus (3)

GB GAS HOLDINGS LIMITED DSR
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 2 more)
TH Clements, W End Road, Benington, Boston, PE22 0EJ (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

GRIDBEYOND LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 2 more)
Newark Industrial Estate, NEWARK, Nottinghamshire, NG24 2ER, United Kingdom (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

GRIDBEYOND LIMITED DSR
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 1 more)
W Marsh Rd, Spalding, PE11 2BB, United Kingdom (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

GRIDBEYOND LIMITED DSR
Inactive - 2024-25 (T-4), 2021-22 (T-1)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
  • • 0.250MW Battery Energy Storage System (2)
  • • 0.25MW of Demand Reduction
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
BPI. Recycled Products - Dumfries, College Road, Dumfries, DG2 0BU (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
THE STRINDS, OLD RADNOR, PRESTEIGNE, POWYS, LD8 2RN (1 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

ENEL X UK LIMITED DSR
Inactive - 2021-22 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
  • • 1.200MW Battery Energy Storage System (2)
  • • 1.200 MW of demand reduction
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
BWW024, Leigh On Mendip, Hollybush Lane, Leigh On Mendip, BA4 5UQ (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (2)

ENEL X UK LIMITED DSR
Inactive - 2021-22 (T-1), 2020-21 (T-4), 2020-21 (T-1)
Norbord Morayhill Dalcross Inverness IV2 7JQ (6 components)
  • • 4MW of demand reduction (2)
  • • 4.000MW of demand reduction
LIMEJUMP LTD DSR
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
  • • 1.200MW Battery Energy Storage System (2)
  • • 1.2 MW of demand reduction
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
2 Ford St, Coventry CV1 5WT (4 components)

1.2MW Battery Storage located at National Express Coventry (3)

ZENOBE ENERGY LIMITED DSR
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-1) (and 1 more)
BWW036, Littleton, Littleton On Severn, Thornbury, Bristol, BS35 1NT (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
CORNELLY QUARRY, HEOL Y SPLOT, SOUTH CORNELLY, BRIDGEND, MID GLAMORGAN, CF33 4RD (1 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

ENEL X UK LIMITED DSR
Inactive - 2021-22 (T-1)
Stephenson Street, West Ham, London E16 4SA (7 components)

Standby generation. (3)

ENEL X UK LIMITED DSR
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1) (and 2 more)
Tedeco UK (KTE16K) 2nd Supply, Water Street, Margam, Port Talbot, West Glamorgan, SA13 2PG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Waterswallows Energy Limited DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
CROXDEN QUARRY, FREEHAY, CHEADLE, STOKE ON TRENT, STAFFORDSHIRE, ST10 1RH (1 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

ENEL X UK LIMITED DSR
Inactive - 2021-22 (T-1)
Hunslet Park Depot, Donisthorpe Street, Leeds, Yorkshire, LS10 1PL (4 components)

0.39MW Battery Storage located at Hunslet Park Depot, Leeds (3)

Veolia UK Limited DSR
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-1) (and 1 more)
Griffith House, 280 Old Marylebone Road, London NW1 5RJ (10 components)

Standby generation (3)

ENEL X UK LIMITED DSR
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1) (and 2 more)
Tedeco UK (KTE16K), RPC Group PLC, Kenfig Industrial Est, Water Street, Port Talbot, West Glamorgan, SA13 2PG (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

Waterswallows Energy Limited DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Highwood Lane Almondsbury, Almondsbury, Bristol, BS34 5SA (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
BOC Fawley, Cadland Road, Hythe, SO45 3NX (8 components)

Industrial Gases production processes. DSR delivered through process interruption (3)

BOC LIMITED DSR
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1) (and 2 more)
Mansell Street, London E1 8AA (7 components)

Standby generation (3)

ENEL X UK LIMITED DSR
Inactive - 2025-26 (T-1), 2024-25 (T-1), 2023-24 (T-1) (and 2 more)
WSC Mildenhall Hub - Sheldrick Way, Mildenhall, Bury Saint Edmunds IP28 7JX (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

GRIDBEYOND LIMITED DSR
Inactive - 2024-25 (T-4), 2021-22 (T-1)
BWW019, Coley, Coley Road, Coley, East Harptree, BA3 4PW (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
North Avenue, Marston Green, Birmingham, B40 1NT (12 components)
  • • CHP Unit 850kWe proposed to be installed in Hall 6-8 at NEC site
  • • Gas Generation units at 1013kWe
  • • Proposed CHP Unit 850kWe to be installed in Hall 6-8 at NEC site
CENTRICA BUSINESS SOLUTIONS (GENERATION) LIMITED DSR Reciprocating engines Combined Heat and Power (CHP)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 1 more)
North Avenue, Marston Green, Birmingham, B40 1NT. (6 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site. (3)

CENTRICA BUSINESS SOLUTIONS (GENERATION) LIMITED DSR Reciprocating engines
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 1 more)
BPI. Films - Bromborough, 40 Thursby Road, Croft Business Park, Bromborough, CH62 3PZ (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
East Quay, The Harbour, Peterhead, AB42 1JF, United Kingdom (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

GRIDBEYOND LIMITED DSR
Inactive - 2024-25 (T-4), 2021-22 (T-1)
BWW010, Axbridge, Cheddar Road, Cheddar, Axbridge, BS26 2DL (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
West Pennard, Glastonbury, BA6 8NN (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
Cross Hands Food Park, Llanelli, Carmarthenshire, SA14 6RF, Wales (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

GRIDBEYOND LIMITED DSR
Inactive - 2024-25 (T-4), 2021-22 (T-1)
Deeside, Engineer Park, Sandycraft, CH5 2QD (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
W End Rd, Benington, Boston PE22 0EJ, United Kingdom (2 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (2)

GRIDBEYOND LIMITED DSR
Inactive - 2024-25 (T-4), 2021-22 (T-1)
Massmould Ltd - Milton Keynes, Bradbourne House, Bradbourne Drive, Tilbrook, Milton Keynes, MK7 8AT (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
BWW033, Forum Pumping Station, Back Lane, Downside, Shepton Mallet, BA4 4JR (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
BWW014, Cheddar T.W, Lower New Road, Cheddar, Bs27, BS27 3DY (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads. (3)

ENEL X UK LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 2 more)
Emirates Stadium, Hornsey Rd, London, N7 7AJ (8 components)
  • • Battery located behind-the-meter within football stadium, able to reduce imported electricity and/or export to local network (2)
  • • Battery system installed at Emirates Stadium
OPEN ENERGI LIMITED DSR
Inactive - 2024-25 (T-4), 2021-22 (T-1), 2020-21 (T-1) (and 1 more)
Coldmove - Oswestry, Glovers Meadow Industrial Estate, Glovers Meadow, Oswestry SY10 8JN, UK (6 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)

GRIDBEYOND LIMITED DSR
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 2 more)
Showing locations 1 - 50 of 107