16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
(3)
-
• existing CHP on site
(2)
21.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 17.315 MW installed capacity Battery Storage facility
(2)
-
• 17.615 MW installed capacity Battery Storage facility
(2)
-
• 19.791 MW installed capacity Battery Storage facility
5.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
(3)
-
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
-
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 6.000MW of storage located at Westoning
(4)
-
• 6.000MW of battery storage located at Westoning.
1.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 4 more)
S11
(10 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
S71
(10 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
SL1
(10 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
-
• 1.26MW Battery Storage located at Abellio Walworth depot
(2)
-
• Bus depot site
(2)
-
• Battery Storage and demand reduction located at Abellio Walworth bus depot
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 3 more)
B93
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
EV charging at residential premises
Active -
2027-28 (T-4)
BH24
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
BN6
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
BS24
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
BS30
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
BS37
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
CM8
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
CW11
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
CW5
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
DE11
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
DN36
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
GU15
(9 components)
-
• Domestic EV charger
-
• Domestic demand turn down
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
GU21
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
GU35
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
HP9
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
HU14
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
EV charging at residential premises
Active -
2027-28 (T-4)
LS19
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
LS25
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
LS29
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
ME3
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
NN7
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
PH1
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
PL9
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
PO14
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
PO7
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
EV charging at residential premises
Active -
2027-28 (T-4)
RG22
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
SA4
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-1)
EV charging at residential premises
Active -
2027-28 (T-4)
Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering …
(5)
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
EV charging at residential premises
Active -
2027-28 (T-4)
WA16
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
WA6
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
WA9
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
WF3
(9 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
WF8
(9 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)
BL1
(8 components)
-
• Domestic demand turn down
(2)
-
• Domestic EV charger
Active -
2027-28 (T-4),
2024-25 (T-4),
2024-25 (T-1)
BN2
(8 components)
-
• Domestic EV charger
(2)
-
• Domestic demand turn down
(2)
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 1 more)