Home List View Map View Technologies Companies Support Us Help Login Register
Theme

DSR

3712 unique locations 13115 components 0 companies Page 1 of 75
Map View
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (9 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

KIWI POWER LTD DSR Reciprocating engines
44.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (10 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

KIWI POWER LTD DSR Reciprocating engines
44.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
British Steel Limited, Administration Building, Brigg Road, Scunthorpe, North Lincolnshire, DN16 1XA (21 components)
  • • Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms. (3)
  • • existing CHP on site (2)
GRIDBEYOND LIMITED DSR Combined Heat and Power (CHP)
21.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
  • • 17.315 MW installed capacity Battery Storage facility (2)
  • • 17.615 MW installed capacity Battery Storage facility (2)
  • • 19.791 MW installed capacity Battery Storage facility
SUSI EELPOWER ROCK FARM LIMITED DSR Storage (Duration 1h)
5.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
  • • 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
  • • 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
  • • 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
SUSI EELPOWER WINCHESTER LIMITED DSR Storage (Duration 1h)
2.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land North of Clayhill Farm, Westoning, MK45 5JD (7 components)
  • • 6.000MW of storage located at Westoning (4)
  • • 6.000MW of battery storage located at Westoning.
CLAYHILL SOLAR LIMITED DSR Storage (Duration 1h)
1.1 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 4 more)
S11 (10 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
S71 (10 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
SL1 (10 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
301 Camberwell New Rd, Camberwell, London, SE5 0TF (9 components)
  • • 1.26MW Battery Storage located at Abellio Walworth depot (2)
  • • Bus depot site (2)
  • • Battery Storage and demand reduction located at Abellio Walworth bus depot
BESS Holdco 14 Limited DSR
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 3 more)
B93 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Eagle Road Lincoln Lincolnshire LN6 (1 components)

EV charging at residential premises

OCTOPUS ENERGY LIMITED DSR
Active - 2027-28 (T-4)
BH24 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
BN6 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
BS24 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
BS30 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
BS37 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
CM8 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
CW11 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
CW5 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
DE11 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
DN36 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
GU15 (9 components)
  • • Domestic EV charger
  • • Domestic demand turn down
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
GU21 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
GU35 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
HP9 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
HU14 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
East Avenue Lincoln Lincolnshire LN4 (1 components)

EV charging at residential premises

OCTOPUS ENERGY LIMITED DSR
Active - 2027-28 (T-4)
LS19 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
LS25 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
LS29 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
ME3 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
NN7 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
PH1 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
PL9 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
PO14 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
PO7 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
EASTGATE STREET WINCHESTER HAMPSHIRE SO23 (1 components)

EV charging at residential premises

OCTOPUS ENERGY LIMITED DSR
Active - 2027-28 (T-4)
RG22 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4)
SA4 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-1)
Fairmile Lane COBHAM SURREY KT11 (1 components)

EV charging at residential premises

OCTOPUS ENERGY LIMITED DSR
Active - 2027-28 (T-4)
Tilbury Freeport Tilbury Essex RM18 7HE (9 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering … (5)

OSSPV001 LIMITED DSR
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
EATON PLACE HARTFORD NORTHWICH CHESHIRE CW8 (1 components)

EV charging at residential premises

OCTOPUS ENERGY LIMITED DSR
Active - 2027-28 (T-4)
WA16 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
WA6 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
WA9 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
WF3 (9 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
WF8 (9 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
BL1 (8 components)
  • • Domestic demand turn down (2)
  • • Domestic EV charger
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2024-25 (T-4), 2024-25 (T-1)
BN2 (8 components)
  • • Domestic EV charger (2)
  • • Domestic demand turn down (2)
AXLE ENERGY LIMITED DSR
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 1 more)
Showing locations 1 - 50 of 3712