Energy from Waste Recovery Facility
(3)
206.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing energy from waste generation unit in operation from February 2015. Site is located on Barlow Way Runcorn and electricity is exported to Inovyn ChlorVinyls manufacturing operations.
(3)
121.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington …
(3)
98.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Energy From Waste plant located in Colnbrook.
(2)
-
• Energy From Waste plant located in Colnbrook, capable of generating 41MW and exporting over 36 MW to the distribution network.
96.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste located in Glass Avenue, Cardiff.
(2)
-
• Twin stream Energy Recovery Facility (ERF) or Energy from Waste which can generate up to 37.5MW of power and export …
95.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Municipal waste incineration plant located in Tyseley Birmingham. It is based on boilers supplying steam to a turbine-generator.
(3)
72.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
This CMU identifier is the replacement for BUCK01, BUCK02, FCCB01, due to the change in Connection Capacity as per rule 3.5.2 and change from "New build CMU" to "Existing CMU" …
(3)
72.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Municipal waste incineration plant located in Staffordshire. It is based on boilers supplying steam to a turbine-generator.
(3)
70.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing Energy from Waste Plant
(3)
64.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing Energy from Waste Plant
(3)
61.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Energy from Waste facility.
(2)
-
• Energy from Waste facility
52.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2024-25 (T-4)
(and 1 more)
This new CMU identifier is the replacement for the MER001, MERC01 and MERC02 as the CMU is operational since April 2017. The CMU capacity is 19.619 MW, reduced from 25 …
(3)
51.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
An energy from waste facility located in North Wales and designed to generate electricity
(3)
46.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic …
(2)
-
• New CMU identifier due to updated grid connection agreement and change of method to calculate the connection capacity to "Historic …
46.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Steam turbine at energy from waste facility located in Newhaven East Sussex
(3)
44.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator.
(3)
40.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included …
(3)
38.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Municipal waste incineration plant located in Portsmouth Hampshire. It is based on boilers supplying steam to a turbine-generator.
(3)
38.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• On-Site Generating CMU.
(2)
-
• On-Site Generating Steam Turbine, utilising heat recovery waste as a 'fuel input' and generating electricity w/o fossil fuel emissions.
38.0 MW
Active -
2025-26 (T-1),
2024-25 (T-4),
2024-25 (T-1)
Existing Energy from Waste Plant
(3)
28.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing Energy from Waste Plant
(3)
27.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Municipal waste incineration plant located in Chineham Hampshire. It is based on one boiler supplying steam to a turbine-generator.
(3)
19.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing Energy from Waste Plant
(3)
18.9 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Inclined grate residual Waste-to-Energy facility comprising 5-boilers and 4-turbines.
(3)
17.6 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
-
• Energy from Waste Facility located in Grace Road, Exeter.
(2)
-
• Energy from Waste Facility which exports at between 3 MW and 4 MW subject to calorific value of waste and …
10.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Energy from Waste plant fuelled by biomass
(3)
8.4 MW
Inactive -
2028-29 (T-4),
2024-25 (T-4),
2023-24 (T-1)
Energy pellet generating unit to be installed on the designated land at Uskmouth Power station, West Nash Road Nash. Newport. NP18 2BZ
Active -
2024-25 (T-4)
Energy from Waste facility
Active -
2024-25 (T-4)
Energy from Waste facility
Active -
2024-25 (T-4)
Twin boiler, single steam turbine energy from waste plant exporting at 132kV
Active -
2024-25 (T-4)
Energy from Waste facility
Active -
2024-25 (T-4)
Single stream energy from waste plant exporting at 66kV.
Active -
2024-25 (T-4)
Twin boiler, single steam turbine energy from waste plant exporting at 33kV
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4)
An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass burn technology which is the most proven Energy from Waste technology currently available. The process will …
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4)
Energy Recovery Facility burning waste
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
Energy from Waste facility
Active -
2024-25 (T-4)
VIT301 - 18MW Steam Turbine at Drakelow Energy Generation Facility, Walton Road, Burton upon Trent, DE15 9UA
(2)
Active -
2025-26 (T-4),
2024-25 (T-4)