The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
9.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
-
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
(2)
-
• A power plant, with associated civil works, switchgear and electrical connection.
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-1)
(and 2 more)
4 x reciprocating engines
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
-
• Aux. load separately metered
-
• GT5
-
• GT8
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
Gas peaking reciprocating engine
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• A new 299MW Open Cycle Gas Turbine peaking plant
(2)
-
• A new Open Cycle Gas Turbine peaking plant
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• Aberthaw 7 OCGT fuel type distillate
-
• Aberthaw 8 Coal fired
-
• Aberthaw 8 OCGT fuel is distillate
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
4 x reciprocating engines
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
-
• Existing CCGT Baglan Unit 1
(2)
-
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Multiple gas engines capable of exporting electricity.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• The CMU Component is made up of brand new gas-fired engines.
(2)
-
• The CMU Component is made up of reciprocating diesel engines.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
(2)
-
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas Peaking Reciprocating Engine
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• Generating Unit 1
-
• Generating Unit 2
-
• Generating Unit 3
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
A generating station consisting of multiple reciprocating engines and alternators located on a single site.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
A generating station consisting of multiple reciprocating engines and alternators located on a single site
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas reciprocating engines
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• The CMU Component is made of brand new gas-fired engines.
(2)
-
• The CMU Component is made up of gas-fired engines.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Gas fired reciprocating engines
(2)
-
• Gas reciprocating engines
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Gas fired reciprocating engines
(2)
-
• Gas reciprocating engines
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• 17.5MW of containerised, gas-fired generating capacity together with transformers, switchgear and associated control gear
(2)
-
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas reciprocating engines
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution …
(2)
-
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
10 gas reciprocating engines used for power generation, with associated infrastructure.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Gas generating unit(s)
(2)
-
• Gas fired generating sets.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
Gas reciprocating engines
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• A 20MW New Build gas fuelled generating station.
-
• A 8MW New Build gas fuelled generating station.
-
• a new build gas generating station
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
-
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
(2)
-
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
NEW BUILD GAS GENERATION STATION
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
-
• Battery Storage Plant
-
• Gas peaking reciprocating engine
-
• Gas peaking reciprocating engines
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• 5 MW of demand reduction
(2)
-
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
10 gas reciprocating engines used for power generation, with associated infrastructure.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Gas Fired Generating Station
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
A Prospective New Build Gas reciprocating energy reserve facility
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
New build power station comprised of multiple reciprocating engines.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and …
(2)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Gas fired generating sets
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
Two gas turbines (CX501-KB7) rated at 5.3MW each.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
Gas reciprocating engines
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
New reciprocating genset in acoustic enclosure
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• A 8MW New Build gas fuelled generating station.
(2)
-
• A 20MW New Build gas fuelled generating station.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)