Onshore Wind

9 unique locations 36 components 0 companies Page 1 of 1
Map View
Aikengall IIa Wind Farm Innerwick EH42 1SG (5 components)

Existing Generation CMU - Onshore Wind. Connected at WesterDod 132kV substation. (5)

AIK2A SUSTAINABLE ENERGY LTD Onshore Wind
17.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 2 more)
Craigdarroch Farm, DG4 6LE, Sanquhar, Dumfries and Galloway, Scotland (6 components)

9-turbine wind farm located in Scotland with the installed capacity of 37.800MW (5)

TWENTYSHILLING LIMITED Onshore Wind
10.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
C35, DG7 3UF, Castle Douglas , Scotland (5 components)

12-turbine wind farm located in Scotland with the installed capacity of 43.200MW (4)

ENERSYST LIMITED Onshore Wind
9.4 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2024-25 (T-1) (and 1 more)
Cumberhead Wind Farm, Douglas, Lanark, ML11 0SY (4 components)
  • • Existing generation windfarm. (2)
  • • New build windfarm. (2)
CUMBERHEAD WIND ENERGY LIMITED Onshore Wind
7.2 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
West Benhar Windfarm off the B717 Benhar Road, Nr Shotts, ML7 5BJ (3 components)
  • • The CMU is an onshore windfarm connected to the distribution system at the Drumcross substation
  • • The CMU is an onshore windfarm connection to the distribution system at Drumcross substation
  • • West Benhar MPAN ID: 1800061208159 The CMU is a onshore windfarm connection to the distribution system at a Drumcross substation
WEST BENHAR WINDFARM PARTNERSHIP LLP Onshore Wind
4.2 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Harting Rig Wind Farm, Lambhill Road, Nr Strathaven, South Lanarkshire, ML106XF (3 components)

Wind Turbine Generators x 15 (3)

KYPE EXTENSION WIND FARM LIMITED Onshore Wind
4.1 MW
Inactive - 2026-27 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Dalquhandy Wind Farm, Dalquhandy Opencast Coal Site, Middlemuir Road, Coalburn, ML11 0NN (3 components)
  • • 10 turbine onshore wind farm with a gross installed capacity of 42 MW in Lanarkshire, Scotland (2)
  • • New build onshore wind farm.
DALQUHANDY WIND FARM LIMITED Onshore Wind
3.2 MW
Active - 2025-26 (T-1), 2024-25 (T-4), 2024-25 (T-1)
Greengairs Wind Farm, Greengairs, ML6 7TY (3 components)

Onshore Wind Farm at Greengairs (3)

KIWI POWER LTD Onshore Wind
2.5 MW
Inactive - 2027-28 (T-4), 2024-25 (T-1), 2023-24 (T-4)
Alva, Clackmannanshire, Scotland, FK14 7JZ (4 components)
  • • Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system (2)
  • • Burnfoot East MPAN ID: 1800061120345 The CMU is an onshore windfarm connected to the distribution system. (2)
ROWAN ONSHORE WINDFARMS LIMITED Onshore Wind
2.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1) (and 1 more)
Showing locations 1 - 9 of 9