• Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.
-
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
-
• Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.
4000.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Keadby 1 CCGT
(2)
-
• Keadby GT3
3519.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
(2)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
2549.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Little Barford 1 CCGT MSID: 4052
(2)
-
• Little Barford 1 OCGT . fuel type is distillate MSID: 4052
2060.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
(2)
-
• The CMU is a Open Cycle Gas Turbine (OCGT)
1943.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Killingholme Module 1 converted to open cycle operation
(2)
-
• Killingholme Module 2 converted to open cycle operation
1775.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Gas reciprocating engines
-
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
-
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a gas …
817.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
Existing OCGT plant.
(3)
690.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
-
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
(2)
-
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
472.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
(2)
-
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
396.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Indian Queens Power Station
(3)
396.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
(2)
-
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
395.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• A new Open Cycle Gas Turbine (OCGT) peaking power plant
(2)
-
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
284.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
-
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: …
-
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate …
-
• Didcot 3 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate …
283.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
-
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
-
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
268.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing OCGT
(3)
267.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
1 x OCGT
(3)
177.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
1 x OCGT
(3)
177.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing OCGT.
(3)
153.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing OCGT.
(3)
131.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing OCGT.
(3)
128.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Existing OCGT
(3)
127.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Continuously operating, maximum output GE gas turbine driving a 47.020MVA Alstom generator at 0.85 power factor.
(2)
-
• Continuously operating, maximum output GE gas turbine driving a 47.020MWA Alstom generator at 0.85 power factor.
119.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Small gas fired OCGT.
(3)
112.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
One (1) Open Cycle Gas Turbine MSID: 7382
(3)
81.2 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 2 more)
-
• Gas reciprocating engines as the generating unit.
(2)
-
• Open cycle gas turbine as the generating unit.
68.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is …
(3)
30.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 1 more)
A series of gas generators on an existing site.
(3)
19.0 MW
Inactive -
2026-27 (T-4),
2024-25 (T-1),
2023-24 (T-1)
A series of gas generators on an existing site.
18.7 MW
Active -
2025-26 (T-1)
-
• 3 x 2MW OCGT gas reciprocating engines
-
• 4 x 2MW OCGT gas reciprocating engines
-
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs …
9.4 MW
Inactive -
2027-28 (T-4),
2021-22 (T-4),
2020-21 (T-4)
Gas fuelled CHP generation plant
(3)
8.2 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Existing Gas Engine
(3)
4.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
Gas Fired Generating Station
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
1 x OCGT
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
-
• New build open cycle gas turbine
-
• New build open cycle gas turbine generating plant
Active -
2025-26 (T-4),
2024-25 (T-4)
Gas fuelled generation plant
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
-
• Aux. load separately metered
-
• GT5
-
• GT8
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
-
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) …
-
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) …
-
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) …
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
gas powered generator to be installed on designated land within a manufacturing compound at the Hoon Hay Farm.
Active -
2024-25 (T-4)
This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
(3)
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
New Gas fulled generation station
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
4 gas reciprocating engines used for power generation, with associated infrastructure.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
3 x 2MW gas reciprocating engines used for power generation, with associated infrastructure
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
-
• A new 299MW Open Cycle Gas Turbine peaking plant
(2)
-
• A new Open Cycle Gas Turbine peaking plant
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• Aberthaw 7 OCGT fuel type distillate
-
• Aberthaw 8 Coal fired
-
• Aberthaw 8 OCGT fuel is distillate
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
(2)
-
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
-
• Existing CCGT Baglan Unit 1
(2)
-
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• Generating Unit 1
-
• Generating Unit 2
-
• Generating Unit 3
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
10 gas reciprocating engines used for power generation, with associated infrastructure.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)