Search Map View Statistics Support Us Help Login Register

Reciprocating engines

1000 unique locations 3160 components 0 companies Page 1 of 20
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
  • • Battery Storage plant
  • • Gas reciprocating engines
  • • Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
  • • ... and 1 more unique descriptions
THURROCK POWER LIMITED Reciprocating engines Storage (Duration 2h) Open Cycle Gas Turbine (OCGT)
817.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1)
Fort Parkway Heartlands Birmingham B24 9QT (16 components)

Existing OCGT (5)

WHITETOWER ENERGY LIMITED Reciprocating engines Open Cycle Gas Turbine (OCGT)
267.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (15 components)

Gas peaking reciprocating engine (5)

SALTHOLME NORTH POWER LIMITED Reciprocating engines
141.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land to the South of Clay Hill off Hamlet Hill CM19 5JR (6 components)

Gas reciprocating engines (6)

NAZEING WEST POWER LIMITED Reciprocating engines
141.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (8 components)

Existing OCGT. (5)

WHITETOWER ENERGY LIMITED Reciprocating engines Open Cycle Gas Turbine (OCGT)
128.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)

Existing OCGT (5)

E.ON UK Plc Reciprocating engines Open Cycle Gas Turbine (OCGT)
127.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Land adjacent to the M4, Howe Lane, Maidenhead, SL6 3JL (8 components)

Gas reciprocating engines (4)

MAIDENHEAD EAST POWER LIMITED Reciprocating engines
95.2 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 1 more)
Land north of the railway Line, Bellamour Lane, Wolsey Bridge  WS15 3JS (12 components)

Gas peaking reciprocating engine (5)

Rugeley East Power Limited Reciprocating engines
95.2 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
  • • 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
  • • 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • ... and 2 more unique descriptions
WAINSTONES ENERGY LIMITED Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT)
93.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Worset Lane, Hartlepool, TS27 3BQ (6 components)

A new build, gas fuelled generation station (2)

FORSA ENERGY (SPANGO) HOLDINGS LIMITED Reciprocating engines
93.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Scawby Brook, Scawby, Brigg, DN20 9LT. (3 components)

Brigg Gas Peaker (3)

CENTRICA DISTRIBUTED GENERATION LIMITED Reciprocating engines
90.6 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
  • • Gas reciprocating engines as the generating unit. (2)
  • • Battery Storage Station
  • • Open cycle gas turbine as the generating unit.
ALKANE ENERGY UK LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 1.5h) Open Cycle Gas Turbine (OCGT)
68.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4)
Land at Stanhope Industrial Estate, Wharf Road, Standford-Le-Hope SS17 0EH (16 components)
  • • 10 x 2MW Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear at Stanhope industrial …
  • • 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
  • • 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
  • • ... and 2 more unique descriptions
EL (SLH) LIMITED Reciprocating engines
60.0 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 3 more)
Land lying to the north west of Staithes Road, Hull, HU12 8DX (8 components)
  • • 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas … (6)
  • • 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and … (2)
HULL RESERVE POWER LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
58.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Griffiths Road, Lostock Gralam, Northwich, CW9 7XU (8 components)
  • • 20MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local … (3)
  • • 20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local … (2)
NORTHWICH POWER LIMITED Reciprocating engines
56.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Mannaberg Way, Scunthorpe, East Yorkshire, DN15 8XF (8 components)

20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

MARDEN POWER LIMITED Reciprocating engines
55.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Chamberhall Street, Bury, Lancashire, BL9 0LU (5 components)

20MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

BURY POWER LIMITED Reciprocating engines
55.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Deeside Power Station Zone 4 Weybridge Road Deeside Industrial Park Flintshire CH5 2UL (2 components)
  • • Gas Reciprocating Engines
  • • Grid Scale Battery Energy Storage.
DEESIDE POWER (UK) LIMITED Reciprocating engines Storage (Duration 9h)
53.9 MW
Active - 2028-29 (T-4)
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (9 components)
  • • The CMU component is net of the auxiliary power required (4)
  • • A completed power plant, with associated civil works, switchgear and electrical connection.
PEAK GEN TOP CO LIMITED Reciprocating engines
52.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Land to the South of Clay Hill off Hamlet Hill, CM19 5JR (4 components)

Gas reciprocating engines (4)

NAZEING EAST POWER LIMITED Reciprocating engines
47.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 1 more)
Thistlebrook Farm, Tring Road, Wingrave, HP22 4LN (1 components)

A New Build Distributed Connected Gas Fueled Generating Station.

ARL 021 LIMITED Reciprocating engines
47.1 MW
Active - 2027-28 (T-4)
Severn Road, Almondsbury, Bristol, BS10 7GD (3 components)
  • • A new build, gas fuelled generation station (2)
  • • A new build, gas fuelled generation station.
AVONMOUTH PROJECT CO LIMITED Reciprocating engines
47.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (4 components)

A Battery Energy Storage System. (4)

HB411MIN LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 8h)
47.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Ash Road, Elton, Chester, CH2 4RX (3 components)

A new build, gas fuelled generation station.

MERSEY GENERATION LIMITED Reciprocating engines
46.3 MW
Active - 2028-29 (T-4)
Old Littleton Road, Chertsey, Surrey, TW17 9NU (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

CONRAD (CASTLE BROMWICH) LIMITED Reciprocating engines
45.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (24 components)
  • • Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected … (3)
  • • Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected … (2)
KILN POWER LIMITED Reciprocating engines
44.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (11 components)
  • • 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network. (3)
  • • 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
ST ASAPH POWER LIMITED Reciprocating engines
44.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (10 components)
  • • 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local … (3)
  • • 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
KIWI POWER LTD Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
44.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land at Queens Road, Immingham, DN40 1QR (7 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

IMMINGHAM POWER LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
44.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 4 more)
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (8 components)
  • • 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local … (3)
  • • 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
WARRINGTON POWER LIMITED Reciprocating engines
44.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (9 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

KIWI POWER LTD DSR Reciprocating engines
44.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (12 components)
  • • 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas … (3)
  • • 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
WOLVERHAMPTON POWER LTD Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
44.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Loddon Power,Unit A, The Loddon Centre, Wade Road, Basingstoke, RG24 8QW (4 components)

16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the Local distribution network and local gas network. (4)

LODDON POWER LIMITED Reciprocating engines
44.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (15 components)
  • • 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network. (4)
  • • 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network. (3)
  • • 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution … (2)
  • • ... and 2 more unique descriptions
OGMORE POWER LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
44.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 11 more)
Five Mile Drive, Upton Wold, Moreton-In-Marsh, WR12 7LD (9 components)
  • • New build site with gas reciprocating engines to replace diesel plant (2)
  • • Mixed fuel reciprocating engines
  • • New state-of-the-art green bio-fuel reciprocating engines replacing existing diesel reciprocating engines.
  • • ... and 1 more unique descriptions
GFI73 LTD Reciprocating engines
44.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (10 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

KIWI POWER LTD DSR Reciprocating engines
44.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Booth Lane Sandbach Cheshire CW11 3PY (1 components)

A new build gas fuelled generating station.

SEDG (MINERS) LTD Reciprocating engines
42.8 MW
Active - 2026-27 (T-4)
Stone Circle, Shap, Cumbria, CA10 3PZ (2 components)
  • • A new build gas fuelled generation station
  • • A new build, gas fuelled generation station
AVONMOUTH GENERATION LIMITED Reciprocating engines
42.5 MW
Active - 2027-28 (T-4)
North Road, Vauxhall, Ellesmere Port, CH65 1BA (2 components)

A new build, gas fuelled generation station (2)

FORSA ENERGY (DRUMCROSS) HOLDINGS LIMITED Reciprocating engines
42.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (19 components)

The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used. (5)

P3P BREHON LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
41.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Felindre Rd, Pencoed, Bridgend, CF35 5HU (2 components)

A new build, gas fuelled generation station

CENTRICA DISTRIBUTED GENERATION LIMITED Reciprocating engines
38.1 MW
Active - 2026-27 (T-4)
Titanium Road, Waunarlwydd, Swansea, SA5 4NH (2 components)
  • • New build site with gas reciprocating engines to replace diesel plant
  • • New gas reciprocating engines to be installed and/or existing plant to be refurbished/replaced to operate on green bio-fuel.
GFI TIMET LTD Reciprocating engines
37.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Jack Martin Way, Fintry, Dundee, DD4 9FF (2 components)

A new build, gas fuelled generation station. (2)

FISHCROSS GENERATION LIMITED Reciprocating engines
37.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Felindre Road, Pencoed, Brigend, CF35 5HU (1 components)

New build 40MW gas Peaker plant

CENTRICA DISTRIBUTED GENERATION LIMITED Reciprocating engines
37.2 MW
Active - 2025-26 (T-1)
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)
  • • A Battery Energy Storage System. (3)
  • • A New Build Gas fuelled power plant.
HD000ACT LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
35.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
  • • A New Build Gas fuelled power plant at Kirkby substation. (2)
  • • A New Build Transmission Connected Battery Energy Storage System. (2)
HD001KIR LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
32.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2023-24 (T-4) (and 1 more)
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
  • • A Battery Energy Storage System (2)
  • • A gas fuelled generating station.
HD639LEG LIMITED Reciprocating engines Storage (Duration 2h)
28.9 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4)
Showing locations 1 - 50 of 1000