• Gas CHP on South bank of river Humber providing electricity and industrial steam
(8)
-
• New build gas reciprocating multi-engine generating plant
(4)
-
• Battery storage unit
3439.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU component is a combined cycle gas turbine
(5)
2492.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Battery Storage plant
-
• Gas reciprocating engines
-
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
-
• ... and 1 more unique descriptions
817.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
Existing OCGT
(5)
267.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
Gas peaking reciprocating engine
(5)
141.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Gas reciprocating engines
(6)
141.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
Existing OCGT.
(5)
128.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
Existing OCGT
(5)
127.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
Gas reciprocating engines
(4)
95.2 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 1 more)
Gas peaking reciprocating engine
(5)
95.2 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
Gas reciprocating engines
94.3 MW
Active -
2027-28 (T-4)
-
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
-
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• ... and 2 more unique descriptions
93.4 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
A new build, gas fuelled generation station
(2)
93.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
Brigg Gas Peaker
(3)
90.6 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Gas reciprocating engines as the generating unit.
(2)
-
• Battery Storage Station
-
• Open cycle gas turbine as the generating unit.
68.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
-
• 10 x 2MW Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear at Stanhope industrial …
-
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
-
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Stanford le-hope
-
• ... and 2 more unique descriptions
60.0 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 3 more)
-
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas …
(6)
-
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and …
(2)
58.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• 20MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local …
(3)
-
• 20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
(2)
56.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
55.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
20MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
55.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• Gas Reciprocating Engines
-
• Grid Scale Battery Energy Storage.
53.9 MW
Active -
2028-29 (T-4)
-
• The CMU component is net of the auxiliary power required
(4)
-
• A completed power plant, with associated civil works, switchgear and electrical connection.
52.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
Gas reciprocating engines
(4)
47.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 1 more)
A New Build Distributed Connected Gas Fueled Generating Station.
47.1 MW
Active -
2027-28 (T-4)
-
• A new build, gas fuelled generation station
(2)
-
• A new build, gas fuelled generation station.
47.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
A Battery Energy Storage System.
(4)
47.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 1 more)
A new build, gas fuelled generation station.
46.3 MW
Active -
2028-29 (T-4)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
45.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2024-25 (T-1)
-
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected …
(3)
-
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected …
(2)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas …
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the Local distribution network and local gas network.
(4)
44.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
-
• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
(4)
-
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
(3)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution …
(2)
-
• ... and 2 more unique descriptions
44.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 11 more)
-
• New build site with gas reciprocating engines to replace diesel plant
(2)
-
• Mixed fuel reciprocating engines
-
• New state-of-the-art green bio-fuel reciprocating engines replacing existing diesel reciprocating engines.
-
• ... and 1 more unique descriptions
44.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A new build gas fuelled generating station.
42.8 MW
Active -
2026-27 (T-4)
-
• A new build gas fuelled generation station
-
• A new build, gas fuelled generation station
42.5 MW
Active -
2027-28 (T-4)
A new build, gas fuelled generation station
(2)
42.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
(5)
41.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A new build, gas fuelled generation station
38.1 MW
Active -
2026-27 (T-4)
-
• New build site with gas reciprocating engines to replace diesel plant
-
• New gas reciprocating engines to be installed and/or existing plant to be refurbished/replaced to operate on green bio-fuel.
37.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
A new build, gas fuelled generation station.
(2)
37.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
New build 40MW gas Peaker plant
37.2 MW
Active -
2025-26 (T-1)
-
• A Battery Energy Storage System.
(3)
-
• A New Build Gas fuelled power plant.
35.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 1 more)
-
• A New Build Gas fuelled power plant at Kirkby substation.
(2)
-
• A New Build Transmission Connected Battery Energy Storage System.
(2)
32.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2023-24 (T-4)
(and 1 more)
-
• A Battery Energy Storage System
(2)
-
• A gas fuelled generating station.
28.9 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)