-
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
(4)
-
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
(3)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution …
(2)
-
• ... and 2 more unique descriptions
44.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 11 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
27.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
16.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
14.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• Gas reciprocating engines.
(4)
-
• Gas reciprocating engines
13.7 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
9.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
New build gas generator
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
New build gas generator
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
New build gas generator
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
-
• New reciprocating genset in acoustic enclosure
(2)
-
• 3x 2MW Containerised Generating Sets
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
New build gas generator
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
Gas fired reciprocating engines
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
-
• Gas and/or diesel reciprocating engines.
(2)
-
• New build power station comprised of multiple reciprocating engines.
-
• Power station comprised of multiple reciprocating engines.
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
(and 1 more)
A new build gas fuelled generating station.
(4)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
(and 1 more)
-
• Gas fired generating unit
(2)
-
• 1 x MWM TCG 2016V
Inactive -
2019-20 (T-1),
2018-19 (T-1),
2017-18 (T-1)
-
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
-
• Energy facility comprising of reciprocating engine sets
Inactive -
2019-20 (T-1),
2017-18 (T-1)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(4)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 4 more)
-
• 6 x reciprocating engines
(4)
-
• Aux. load separately metered
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 7 more)
-
• Gas fired reciprocating engines.
(3)
-
• Reciprocating engines
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 4 more)
4 x reciprocating engines
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
-
• Reciprocating Engines
(3)
-
• Gas fired reciprocating engines.
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 2 more)
-
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
(4)
-
• A power plant, with associated civil works, switchgear and electrical connection.
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 x 2MW gas gen sets at Whitwell Energy Park.
(2)
-
• Gas reciprocating engines as the generating unit.
Inactive -
2027-28 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• gas fired reciprocating engines
(3)
-
• Gas fired reciprocating engines.
Inactive -
2024-25 (T-1),
2020-21 (T-4),
2019-20 (T-1)
(and 1 more)
-
• gas fired reciprocating engines
(2)
-
• Gas fired reciprocating engines.
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
New build gas generator
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution …
(3)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution …
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
-
• Gas fired reciprocating engines
(2)
-
• Gas fired reciprocating engines.
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
-
• A new build gas fuelled generating station.
(2)
-
• A 10MW new build gas fuelled generating station.
-
• A 7MW new build gas fuelled generating station.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Gas fired reciprocating engines.
(2)
-
• New build CMU employing gas fired reciprocating engines. The Financial Commitment Milestone has been achieved for a previous auction. The …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Gas fired reciprocating engines
(3)
-
• Gas fired generating unit
-
• Gas reciprocating engines
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• Gas fired reciprocating engines
(3)
-
• Gas fired generating units
-
• Gas reciprocating engines
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• Peak power plant
(4)
-
• Reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
-
• Gas reciprocating engines
(4)
-
• 1 x jenbacher JGS616 GS
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• Bio-liquid fuelled distribution connected generation station
(2)
-
• Gas fuelled distribution connected generation station
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Gas reciprocating engines
(4)
-
• 1 x MWM TBG2016 engine 1.35MW
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
-
• New build gas generator
(2)
-
• A series of gas powered reciprocating engines, gas kiosk, DNO switchroom and associated infrastructure
Inactive -
2022-23 (T-3),
2020-21 (T-4),
2017-18 (T-1)