-
• 1 x MWM TCG 1.35MW
(2)
-
• Gas fired generating units
Inactive -
2020-21 (T-4),
2018-19 (T-1),
2017-18 (T-1)
-
• Battery Storage Facility
-
• Diesel and/or gas reciprocating engines.
-
• Gas reciprocating engines.
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• New build power station comprised of multiple reciprocating engines.
(2)
-
• Gas and/or diesel reciprocating engines.
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
-
• 1 x MWM TBG 620V 16K
(2)
-
• Gas reciprocating engine
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• A new build gas fuelled generating station.
(2)
-
• A 7MW new build gas fuelled generating station.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
A new build gas fuelled generating station.
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
(and 1 more)
-
• 1 x jenbacher j616
-
• Gas reciprocating engine
-
• Gas reciprocating engines
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
New build gas generator
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
-
• CMU Component is 500kVA reciprocating diesel engine.
-
• This CMU is a 20MW distrubution connected facility that has been operational since November 2016. It is metered on the …
Inactive -
2018-19 (T-1),
2017-18 (T-1)
New build gas generator
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
(3)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• New build power station comprised of multiple reciprocating engines.
(2)
-
• Gas and/or diesel reciprocating engines.
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
-
• New reciprocating genset in acoustic enclosure
(2)
-
• 3x 2MW Containerised Generating Sets
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
(3)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
New build gas generator
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
(3)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• 1 x MWM TGC 2020
-
• Gas fire generating unit
-
• Gas reciprocating engines
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
-
• Keadby GT3
(2)
-
• Keadby 1 CCGT
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• West Burton A Power Station CMU 1 WA1-17 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
-
• West Burton A Power Station CMU 2 WA2-17 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
-
• West Burton A Power Station CMU 3 WA3-17 = 100% (T_WBUPS-3) + 25% (E_WBUPS-STX)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
-
• 2.115MW Diesel reciprocating engine
-
• 2.115MW diesel reciprocating engine
-
• 2.116MW diesel reciprocating engine
Inactive -
2018-19 (T-1),
2017-18 (T-1)
A generating station consisting multiple reciprocating engines and alternators located on a single site. Voltage to be transformed where appropriate for export.
(2)
Inactive -
2018-19 (T-1),
2017-18 (T-1)
-
• A new build diesel and/or gas dual fuel generating station consisting of 47 generator units of 440KW each
(2)
-
• An operational 20 MW diesel fuelled generating station with existing T-1 and T-4 CM Contracts.
Inactive -
2020-21 (T-4),
2018-19 (T-1),
2017-18 (T-1)
-
• Diesel and/or gas dual fuel generating station.
-
• New Build. Gas and/or dual fuel generating station.
Inactive -
2018-19 (T-1),
2017-18 (T-1)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution …
(2)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines
Inactive -
2018-19 (T-1),
2017-18 (T-1),
2016-17 (TR)
-
• Gas fired reciprocating engines
(2)
-
• Gas fired reciprocating engines.
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, to export.
(2)
Inactive -
2018-19 (T-1),
2017-18 (T-1)
-
• 4x 2MW Containerised Generating Sets
-
• Gas fired generating engines
Inactive -
2018-19 (T-1),
2017-18 (T-1)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the SSE distribution …
(2)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the SSE distribution …
Inactive -
2018-19 (T-1),
2017-18 (T-1),
2016-17 (TR)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution …
(2)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The Power plant is connected to the WPD distribution …
Inactive -
2018-19 (T-1),
2017-18 (T-1),
2016-17 (TR)
A new power plant, with associated civil works, switchgear and electrical connection.
(2)
Inactive -
2018-19 (T-1),
2017-18 (T-1)
-
• Gas and/or diesel reciprocating engines.
-
• New build power station comprised of multiple reciprocating engines.
Inactive -
2018-19 (T-1),
2017-18 (T-1)
-
• Gas fired generating unit
(2)
-
• 1 x MWM TCG 2016V
Inactive -
2019-20 (T-1),
2018-19 (T-1),
2017-18 (T-1)
-
• Gas fired reciprocating engines.
(2)
-
• New build CMU employing gas fired reciprocating engines. The Financial Commitment Milestone has been achieved for a previous auction. The …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas fired reciprocating engines
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, for export.
(2)
Inactive -
2018-19 (T-1),
2017-18 (T-1)
-
• Gas fuelled distribution connected generation station
(2)
-
• Bio-liquid fuelled distribution connected generation station
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• 2.115MW Diesel and / or gas dual fuel reciprocating engine
-
• 2.115MW diesel and/or gas dual fuel reciprocating engine
-
• 2.115mw diesel and/or gas dual fuel reciprocating engine
Inactive -
2018-19 (T-1),
2017-18 (T-1)
-
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
-
• Energy facility comprising of reciprocating engine sets
Inactive -
2019-20 (T-1),
2017-18 (T-1)
-
• 1 x MWM TCG 2020
(2)
-
• Gas reciprocating engines
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• New build gas generator
(2)
-
• A series of gas powered reciprocating engines, gas kiosk, DNO switchroom and associated infrastructure
Inactive -
2022-23 (T-3),
2020-21 (T-4),
2017-18 (T-1)
New build gas generator
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
-
• Diesel and/or gas reciprocating engines.
(2)
-
• gas reciprocating engines.
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Gas reciprocating engines
(2)
-
• 2 x 1.55 MW Contianerised Generating Sets.
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
-
• Three gas turbines operating in open cycle mode. Not a Storage Facility.
(2)
-
• Two gas turbines operating in open cycle mode. Not a Storage Facility
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 2 more)
-
• New build power station comprised of multiple reciprocating engines.
(2)
-
• Gas and/or diesel reciprocating engines.
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
(3)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
(3)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• Battery Storage facility
-
• Diesel and/or gas reciprocating engines.
-
• gas reciprocating engines.
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• New build power station comprised of multiple reciprocating engines.
(2)
-
• Gas and/or diesel reciprocating engines.
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2018-19 (T-1)
(and 1 more)
-
• Diesel and/or gas reciprocating engines.
(2)
-
• gas reciprocating engines.
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2017-18 (T-1)