• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
(4)
-
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
(3)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution …
(2)
-
• ... and 2 more unique descriptions
44.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 11 more)
-
• Reciprocating gas engines running on natural gas
(4)
-
• Additional reciprocating gas engines running on natural gas returned to service
10.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 5 more)
-
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
(10)
-
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a …
9.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
6.2 MW
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 6 more)
-
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
(10)
-
• CMU consisting of multiple reciprocating engines and alternators
5.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 10 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
2.4 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 6 more)
Gas reciprocating engines
(5)
1.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• Battery energy storage unit
(2)
-
• New reciprocating genset in acoustic enclosure
(2)
0.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2020-21 (T-4)
(and 1 more)
20 MW power plant comprising of 10 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution network and local gas network.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
Gas fuelled Generating Sets
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas reciprocating engines
(5)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8.99MW.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Gas fired reciprocating engines
(3)
-
• Gas reciprocating engines
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
-
• A new build 3MW gas fuelled generating station.
(2)
-
• A new build 8MW gas fuelled generating station.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
-
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where …
(4)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
(4)
-
• Site based CHP - note the primary fuel are Waste Gases
Inactive -
2023-24 (T-4),
2023-24 (T-1),
2022-23 (T-3)
(and 3 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
-
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
3 x Jenbacher 420 (1.4MW)
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and …
(4)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• Gas fired reciprocating engines
(3)
-
• Gas fired generating unit
-
• Gas reciprocating engines
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• Gas generating unit(s)
(2)
-
• Gas fired generating unit
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Gas fired reciprocating engines
(3)
-
• Gas fired generating units
-
• Gas reciprocating engines
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• Peak power plant
(4)
-
• Reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
-
• Gas fired reciprocating engines
(2)
-
• Gas-fired reciprocating engines
(2)
-
• Gas fired generating unit(s)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
New build power station comprised of multiple reciprocating engines.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• New build power station comprised of multiple reciprocating engines.
(4)
-
• Existing power station comprised of multiple reciprocating engines
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• Gas reciprocating engines
(4)
-
• 1 x MWM TBG2016 engine 1.35MW
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
-
• Gas generating unit(s)
(2)
-
• 1x 2.00MW Containerised Generating sets.
-
• Gas fired generating sets.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
New build power station comprised of multiple reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
New build power station comprised of multiple reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
-
• New reciprocating genset in acoustic enclosure
(2)
-
• New reciprocating engine in acoustic enclosure. *Post code and grid reference may not match because site address is not yet …
Inactive -
2022-23 (T-4),
2020-21 (T-4),
2019-20 (T-1)
New build power station comprised of multiple reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
Gas generating unit(s)
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
New build power station comprised of multiple reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
14 x 1.1MW gas reciprocating engines at Canal St, Brierley Hill, Dudley on a designated in an industrial / Commercial district.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)