The CMU component is a combined cycle gas turbine
(5)
2492.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected …
(3)
-
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected …
(2)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
(4)
-
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
(3)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution …
(2)
-
• ... and 2 more unique descriptions
44.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 11 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
(5)
41.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
27.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
27.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
(5)
19.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Redditch 20MW Gas Peaker Project
(3)
18.8 MW
Inactive -
2026-27 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
(5)
18.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
(4)
-
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
17.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
16.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
14.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• Gas reciprocating engines.
(4)
-
• Gas reciprocating engines
13.7 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
9.5 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 2 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
9.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
-
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
9.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 5 more)
-
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
(10)
-
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a …
9.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
-
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
(3)
-
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be …
(2)
9.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
8.2 MW
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 5 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
(5)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
(5)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
6.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
6.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
(10)
-
• CMU consisting of multiple reciprocating engines and alternators
5.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 10 more)
-
• A new build diesel or gas grid support plant
(3)
-
• An Existing diesel grid support plant
-
• An Exiting diesel grid support plant
4.7 MW
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2021-22 (T-4)
(and 2 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
3.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Gas reciprocating engines
(5)
1.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• Battery energy storage unit
(2)
-
• New reciprocating genset in acoustic enclosure
(2)
0.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2020-21 (T-4)
(and 1 more)
-
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to …
(3)
-
• Gas fired generating unit
(2)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2020-21 (T-1)
(and 2 more)
New reciprocating genset in acoustic enclosure
(2)
Inactive -
2020-21 (T-4),
2019-20 (T-1)
-
• A 20MW new build gas generating station..
-
• A new build gas generating station.
Inactive -
2020-21 (T-4),
2019-20 (T-1)
2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
(2)
Inactive -
2020-21 (T-4),
2020-21 (T-1),
2019-20 (T-1)
A Prospective New Build Gas reciprocating energy reserve facility
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
New reciprocating genset in acoustic enclosure
(2)
Inactive -
2020-21 (T-4),
2019-20 (T-1)
New reciprocating genset in acoustic enclosure
(2)
Inactive -
2020-21 (T-4),
2019-20 (T-1)
New build gas generator
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
-
• New reciprocating genset in acoustic enclosure
(2)
-
• 3x 2MW Containerised Generating Sets
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)
Gas fired reciprocating engines
(2)
Inactive -
2020-21 (T-4),
2019-20 (T-1)
New build gas generator
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2017-18 (T-1)