• Gas fired generating unit(s)
-
• Gas fired generating units
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution …
(3)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution …
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
Gas reciprocating engines
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• The CMU Component is made up of brand new gas-fired engines.
(3)
-
• The CMU Component is made up of reciprocating diesel engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Total installed capacity is 6.6MW of gas reciprocating engines to be installed on designated land within a manufacturing compound at …
(4)
-
• Total installed capacity is 7,952kW OF gas reciprocating engines to be installed on designated land within a manufacturing compound at …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
-
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control …
(2)
-
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• 3 gas reciprocating engines used for power generation, with associated infrastructure.
(3)
-
• Battery storage and associated infrastructure
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
A generating station consisting of multiple reciprocating engines and alternators located on a single site.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
10 gas reciprocating engines used for power generation, with associated infrastructure.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
A generating station consisting of multiple reciprocating engines and alternators located on a single site
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
Gas reciprocating engines
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
3 x Jenbacher 420 (1.4MW)
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
-
• A 8MW New Build gas fuelled generating station.
(2)
-
• A 20MW New Build gas fuelled generating station.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• The CMU Component is made of brand new gas-fired engines.
(2)
-
• The CMU Component is made up of gas-fired engines.
(2)
-
• The CMU Component is made of brand new gas-fired engines
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and …
(4)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control …
(2)
-
• 17.5MW of containerised, gas-fired generating capacity together with transformers, switchgear and associated control gear
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Peak power plant
(4)
-
• Reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
5 x Jenbacher 420 (1.4MW)
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Gas reciprocating engines
(4)
-
• 1 x jenbacher JGS616 GS
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• 10 MW power plant comprising 5 x 2MW gas fired reciprocating engines. Power plant will be connected to the local …
(2)
-
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution …
(2)
-
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
10 gas reciprocating engines used for power generation, with associated infrastructure.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
-
• Gas reciprocating engines
(4)
-
• 1 x MWM TBG2016 engine 1.35MW
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 3 more)
-
• Peak power plant
(4)
-
• Gas reciprocating engine
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
-
• Gas generating unit(s)
(2)
-
• 1x 2.00MW Containerised Generating sets.
-
• Gas fired generating sets.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• A 20MW New Build gas fuelled generating station.
-
• A 8MW New Build gas fuelled generating station.
-
• a new build gas generating station
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
-
• Reciprocating Gas Engine(s)
(3)
-
• 1 x Jenbacher 420 (1.4MW)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
-
• Battery Storage Plant
-
• Gas peaking reciprocating engine
-
• Gas peaking reciprocating engines
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
10 gas reciprocating engines used for power generation, with associated infrastructure.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
A Prospective New Build Gas reciprocating energy reserve facility
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
Gas fired generating sets
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
New reciprocating genset in acoustic enclosure
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Gas reciprocating engines
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Gas fired reciprocating engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
A 20MW new build gas generating station..
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
Gas generation peaking plant comprising of 9 x 2MW engines
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
A 8MW New Build gas fuelled generating station.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to …
(2)
-
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
-
• A 20MW New Build gas fuelled generating station.
-
• A New Build gas fuelled generating station.
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
-
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
-
• 20 MWs of reciprocating generator units to be installed on designated land at Thornton Lane, near Markfield.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
-
• 20 MWs of multiple reciprocating generator units to be installed on designated land at Fordbridge Lane, Blackwell.
-
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
-
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)