• Gas CHP on South bank of river Humber providing electricity and industrial steam
(8)
-
• New build gas reciprocating multi-engine generating plant
(4)
-
• Battery storage unit
3439.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU component is a combined cycle gas turbine
(5)
2492.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
-
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• ... and 2 more unique descriptions
93.4 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
-
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas …
(6)
-
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and …
(2)
58.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local …
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
-
• 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas …
(3)
-
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
(2)
44.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network.
(4)
-
• 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network.
(3)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution …
(2)
-
• ... and 2 more unique descriptions
44.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 11 more)
16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(5)
44.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
(5)
41.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
28.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
27.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(5)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(5)
27.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• Operational gas reciprocating engine.
(3)
-
• Operational Reciprocating Engine
(2)
22.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.
(5)
22.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
(5)
21.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
(5)
18.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU component comprises of three 2MW Reciprocating Gas Engines
(5)
16.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
16.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
14.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• Gas reciprocating engines.
(4)
-
• Gas reciprocating engines
13.7 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Gas reciprocating engines
(5)
11.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
Operational reciprocating gas engines
(5)
11.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Reciprocating gas engines running on natural gas
(4)
-
• Additional reciprocating gas engines running on natural gas returned to service
10.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 5 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
9.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
-
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
9.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 5 more)
-
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
(3)
-
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be …
(2)
9.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
(5)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Gas reciprocating engines
(5)
6.0 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.
(5)
5.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2023-24 (T-4)
(and 3 more)
-
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
(10)
-
• CMU consisting of multiple reciprocating engines and alternators
5.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 10 more)
-
• A new build diesel or gas grid support plant
(3)
-
• An Existing diesel grid support plant
-
• An Exiting diesel grid support plant
4.7 MW
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2021-22 (T-4)
(and 2 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
Gas reciprocating engines
(5)
1.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
1 * 1.7MW diesel reciprocating engine
(5)
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• A 20MW New Build gas fuelled generating station.
-
• A New Build gas fuelled generating station.
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
-
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
-
• 20 MWs of reciprocating generator units to be installed on designated land at Thornton Lane, near Markfield.
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
-
• 20 MWs of multiple reciprocating generator units to be installed on designated land at Fordbridge Lane, Blackwell.
-
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
-
• 20 MWs of reciprocating engine generation connecting into existing 33kv substation
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)