Gas peaking reciprocating engine
(5)
141.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Existing OCGT.
(5)
128.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas …
(6)
-
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and …
(2)
58.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• The CMU component is net of the auxiliary power required
(4)
-
• A completed power plant, with associated civil works, switchgear and electrical connection.
52.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
Reciprocating genset in acoustic enclosure
(5)
22.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
-
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
(4)
-
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
17.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
16.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
15.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
14.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A 7.220MW reciprocating gas engine power plant comprising of 5 x 1.5MW engines to be installed on designated land at West Wilts Trading Estate.
(4)
13.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 1 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
12.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 2 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
11.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Reciprocating genset in acoustic enclosure
(5)
11.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
9.5 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 2 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
9.5 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
8.2 MW
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 5 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
7.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
6.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
6.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 3 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
6.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
6.7 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
6.2 MW
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 6 more)
Gas reciprocating engines
(5)
6.0 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
CMU consisting of multiple reciprocating engines and alternators
(3)
5.8 MW
Inactive -
2025-26 (T-4),
2023-24 (T-1),
2022-23 (T-1)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
-
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
5.7 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.
(5)
5.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2023-24 (T-4)
(and 3 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
CMU consisting of multiple reciprocating engines and alternators
(5)
3.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 4 more)
Gas reciprocating engines
(4)
3.5 MW
Inactive -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(5)
3.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
2.4 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 6 more)
Gas reciprocating engines
(5)
1.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
1 * 1.7MW diesel reciprocating engine
(5)
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
CMU consisting of multiple reciprocating engines and alternators
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 4 more)
-
• CMU consisting of multiple gas reciprocating engines and alternators
(3)
-
• CMU consisting of multiple reciprocating engines and alternators
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• CMU consisting of a gas reciprocating engine and alternator
(3)
-
• CMU consisting of multiple reciprocating engines and alternators
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• CMU consisting of multiple gas reciprocating engines and alternators
(3)
-
• CMU consisting of a gas reciprocating engine and an alternator
(2)
Inactive -
2024-25 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
CMU consisting of multiple gas reciprocating engines and alternators
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
CMU consisting of multiple gas reciprocating engines and alternators
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
-
• New Build CMU comprising of battery storage and associated plant
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• CMU consisting of a gas reciprocating engine and alternator
(3)
-
• CMU consisting of multiple gas reciprocating engines and alternators
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)