CMU consisting of multiple gas reciprocating engines and alternators
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
Gas generating unit(s)
(2)
Inactive -
2023-24 (T-1),
2022-23 (T-1)
-
• Northwich Power is a a distribution connected power plant located at Northwich Power, Griffiths Road, Lostock Gralam, CW9 7XU, comprising …
(2)
-
• Northwich Power is a a distribution connected power plant located at Northwich Power, Griffiths Road, Lostock Gralam, CW9 7XU, comprising …
(2)
-
• Northwich Power is a a distribution connected power plant located at Northwich Power, Griffiths Road, Lostock Gralam, CW9 7XU, comprising …
Inactive -
2023-24 (T-1),
2022-23 (T-1)
-
• Site based CHP ( reclassified from reciprocating engine for EMR purposes given definitions in Capacity Market Auction Guidelines )
(4)
-
• Site based CHP - note the primary fuel are Waste Gases
Inactive -
2023-24 (T-4),
2023-24 (T-1),
2022-23 (T-3)
(and 3 more)
Northwich Power is a a distribution connected power plant located at Northwich Power, Griffiths Road, Lostock Gralam, CW9 7XU, comprising reciprocating engines .This component is one of the engines.
Inactive -
2023-24 (T-1)
3 x 1.5 MW gas generator units to be installed at Land At Herrod Avenue, Off Haigh Avenue, South Reddish, Stockport, SK5 7NW.
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-1)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
-
• New Build CMU comprising of battery storage and associated plant
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CMU consisting of multiple gas reciprocating engines and alternators
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
CMU consisting of multiple reciprocating engines and alternators
(5)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 4 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• CMU will be formed of multiple individual reciprocating gas engines.
(3)
-
• CMU will be formed of multiple individual gas reciprocating gas engines.
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 3 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
-
• 4 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Bowbridge Lane
-
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
-
• ... and 1 more unique descriptions
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 2 more)
-
• CMU consisting of multiple gas reciprocating engines and alternators
(3)
-
• CMU consisting of multiple reciprocating engines and alternators
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• CMU consisting of a gas reciprocating engine and alternator
(3)
-
• CMU consisting of multiple reciprocating engines and alternators
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
(4)
-
• A power plant, with associated civil works, switchgear and electrical connection.
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-1)
(and 3 more)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 2 more)
-
• STOR diesel engines that will operate environmentally with mixed fuel
(2)
-
• New build site with gas reciprocating engines to replace diesel plant
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
A new build, gas fuelled generation station.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 2 more)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 2 more)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 2 more)
-
• CMU consisting of multiple gas reciprocating engines and alternators
(3)
-
• CMU consisting of a gas reciprocating engine and an alternator
(2)
Inactive -
2024-25 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
Gas generating unit(s)
(2)
Inactive -
2023-24 (T-1),
2022-23 (T-1)
Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• STOR diesel engines that will operate environmentally with mixed fuel
(2)
-
• Mixed fuel reciprocating engines
Inactive -
2026-27 (T-4),
2023-24 (T-1)
CMU consisting of multiple gas reciprocating engines and alternators
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CMU consisting of multiple reciprocating engines and alternators
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
CMU will be formed of multiple individual gas reciprocating engine units
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
A gas fuelled generating station.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 1 more)
CMU consisting of multiple gas reciprocating engines and alternators
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• CMU consisting of a gas reciprocating engine and alternator
(3)
-
• CMU consisting of multiple gas reciprocating engines and alternators
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• CMU consisting of a gas reciprocating engine and alternator
(4)
-
• CMU consisting of a gas reciprocating engine and an alternator
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 4 more)
1 * 1.7MW diesel reciprocating engine
(5)
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
Gas reciprocating engines
(5)
1.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
2.4 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 6 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(5)
3.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
-
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
(2)
-
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
(2)
-
• Generating CMU comprising of a CHP asset producing energy from waste
3.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Gas reciprocating engines
(4)
3.5 MW
Inactive -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
CMU consisting of multiple reciprocating engines and alternators
(5)
3.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 4 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
3.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Gas reciprocating engines
(4)
3.9 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2023-24 (T-1)
(and 1 more)