Existing OCGT.
(5)
128.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 5 more)
-
• The CMU component is net of the auxiliary power required
(4)
-
• A completed power plant, with associated civil works, switchgear and electrical connection.
52.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• New build site with gas reciprocating engines to replace diesel plant
(2)
-
• Mixed fuel reciprocating engines
-
• New state-of-the-art green bio-fuel reciprocating engines replacing existing diesel reciprocating engines.
-
• ... and 1 more unique descriptions
44.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
(3)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
23.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 3 more)
Reciprocating genset in acoustic enclosure
(5)
22.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …
(4)
18.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Redditch 20MW Gas Peaker Project
(3)
18.8 MW
Inactive -
2026-27 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• This CMU is 6*2MW reciprocating engines.
(2)
-
• This CMU is 10*2MW reciprocating engines using HVO.
-
• This CMU is 10*2MW reciprocating engines.
18.7 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
(and 1 more)
Reciprocating genset
(5)
18.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
17.1 MW
Inactive -
2026-27 (T-4),
2023-24 (T-1)
-
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
(4)
-
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
17.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
16.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
15.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
15.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
14.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• CMU consisting of multiple reciprocating engines and alternators
(4)
-
• CMU consisting of multiple reciprocating engines and alternators.
14.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
13.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
A 7.220MW reciprocating gas engine power plant comprising of 5 x 1.5MW engines to be installed on designated land at West Wilts Trading Estate.
(4)
13.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 1 more)
-
• Newbuild gas generator
(2)
-
• Operational gas generator
-
• Reciprocating engine (natural gas fuelled)
-
• ... and 1 more unique descriptions
12.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
11.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Reciprocating genset in acoustic enclosure
(5)
11.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
-
• Reciprocating gas engines running on natural gas
(4)
-
• Additional reciprocating gas engines running on natural gas returned to service
10.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 5 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
9.6 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
9.5 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 2 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
9.5 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
-
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
9.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 5 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
8.2 MW
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 5 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
7.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
3 x 2.5 MW gas generator units to be installed at Land At Wolverhampton Powerhouse, Commercial Road, WV1 3QS.
(2)
7.1 MW
Inactive -
2026-27 (T-4),
2023-24 (T-1)
-
• Energy facility comprising of battery energy storage sets and ancillary equipment.
(3)
-
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
(2)
7.1 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
6.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
6.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 3 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
6.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
6.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
6.7 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
6.2 MW
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 6 more)
Gas reciprocating engines
(5)
6.0 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
CMU consisting of multiple reciprocating engines and alternators
(3)
5.8 MW
Inactive -
2025-26 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CMU consisting of multiple reciprocating engines and alternators
(3)
5.8 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
5.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
-
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
5.7 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
Existing Gas Engine
(5)
4.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
Gas reciprocating engines
(4)
3.9 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2023-24 (T-1)
(and 1 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
3.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
CMU consisting of multiple reciprocating engines and alternators
(5)
3.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 4 more)
Gas reciprocating engines
(4)
3.5 MW
Inactive -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
(2)
-
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
(2)
-
• Generating CMU comprising of a CHP asset producing energy from waste
3.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)