• Gas CHP on South bank of river Humber providing electricity and industrial steam
(8)
-
• New build gas reciprocating multi-engine generating plant
(4)
-
• Battery storage unit
3439.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Brigg Gas Peaker
(3)
90.6 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• The CMU component is net of the auxiliary power required
(4)
-
• A completed power plant, with associated civil works, switchgear and electrical connection.
52.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
45.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2024-25 (T-1)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
(3)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
23.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 3 more)
-
• a Combined Heat and Power Plant
(3)
-
• A Distribution Connected 4.5MW gas fueled generating station
(2)
19.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial …
(4)
18.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Redditch 20MW Gas Peaker Project
(3)
18.8 MW
Inactive -
2026-27 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Gas reciprocating engines.
(5)
18.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
Reciprocating genset
(5)
18.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
16.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
15.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
14.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
13.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
A 6.9MW gas fuelled generating station.
(3)
13.0 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Newbuild gas generator
(2)
-
• Operational gas generator
-
• Reciprocating engine (natural gas fuelled)
-
• ... and 1 more unique descriptions
12.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• Reciprocating gas engines running on natural gas
(4)
-
• Additional reciprocating gas engines running on natural gas returned to service
10.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 5 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
9.5 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
-
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
9.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 5 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW.
(3)
-
• A 7.5MW new build gas generating station..
8.5 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• Energy facility comprising of battery energy storage sets and ancillary equipment.
(3)
-
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
(2)
7.1 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
6.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
6.7 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
STOR diesel engines that will operate environmentally with mixed fuel
(2)
6.2 MW
Active -
2025-26 (T-1),
2024-25 (T-1)
Gas reciprocating engines
(5)
6.0 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
Existing Gas Engine
(5)
4.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• A new build diesel or gas grid support plant
(3)
-
• An Existing diesel grid support plant
-
• An Exiting diesel grid support plant
4.7 MW
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2021-22 (T-4)
(and 2 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
3.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Gas reciprocating engines
(4)
3.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
Gas reciprocating engines
(4)
3.5 MW
Inactive -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
(2)
-
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
(2)
-
• Generating CMU comprising of a CHP asset producing energy from waste
3.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
Gas reciprocating engines
(5)
1.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• Gas reciprocating engines
(2)
-
• Gas reciprocating engines.
(2)
1.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 1 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active -
2024-25 (T-1)
CMU will be formed of multiple individual gas reciprocating engine units
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• CMU consisting of multiple gas reciprocating engines and alternators
(3)
-
• CMU consisting of multiple reciprocating engines and alternators
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• CMU consisting of a gas reciprocating engine and alternator
(3)
-
• CMU consisting of multiple reciprocating engines and alternators
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
A new build, gas fuelled generation station.
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Gas generating unit(s)
(2)
-
• Gas reciprocating engines
(2)
-
• Gas fired generating unit
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 3 more)
-
• A New Build Gas fuelled power plant at Capenhurst substation
(3)
-
• A New Build Battery Energy Storage System
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
-
• 4 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Bowbridge Lane
-
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
-
• ... and 1 more unique descriptions
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
-
• CMU consisting of multiple gas reciprocating engines and alternators
(3)
-
• CMU consisting of a gas reciprocating engine and an alternator
(2)
Inactive -
2024-25 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
-
• A gas fuelled generating station
(2)
-
• A Battery Energy Storage System
Active -
2025-26 (T-4),
2024-25 (T-1)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• 3.4MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
(2)
-
• 3MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 1 more)