A new build, gas fuelled generation station.
Active -
2024-25 (T-4)
-
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
-
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
Gas fired reciprocating engine(s)
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
-
• A Battery Energy Storage System
-
• A Battery Energy Storage System.
-
• A New Build Gas fuelled power plant
Active -
2025-26 (T-4),
2024-25 (T-4)
-
• A Battery Energy Storage System.
(2)
-
• A New Build Gas fuelled power plant.
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
-
• A Battery Energy Storage System.
(2)
-
• A New Build Gas fuelled power plant.
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
New reciprocating gensets in acoustic enclosure
Active -
2024-25 (T-4)
CMU consisting of multiple gas reciprocating engines and alternators
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
A gas fuelled generating station.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
-
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
-
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
-
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
-
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
-
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active -
2024-25 (T-4)
20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
-
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
-
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
Gas fired reciprocating engine(s)
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
16MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active -
2024-25 (T-4)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
-
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
-
• New build power station comprised of multiple reciprocating engines
Inactive -
2024-25 (T-4),
2021-22 (T-4)
Gas engine peaker plant providing capacity market, power trading and other balancing services.
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
A new build, gas fuelled generation station.
(2)
Active -
2025-26 (T-4),
2024-25 (T-4)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
-
• Natural gas fired reciprocating engines installed upon designated land within the existing Knapton Generating Station facility. The CMU output will …
-
• Natural gas fired reciprocating engines installed upon designated land within the existing Knapton Generating Station facility. The CMU output will …
Active -
2024-25 (T-4)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
-
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
-
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive -
2024-25 (T-4),
2022-23 (T-4)
3 x 1.5 MW gas generator units to be installed at Land At Herrod Avenue, Off Haigh Avenue, South Reddish, Stockport, SK5 7NW.
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-1)
Reciprocating genset in acoustic enclosure
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
Reciprocating genset in acoustic enclosure
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines
(2)
Active -
2025-26 (T-4),
2024-25 (T-4)
Gas Fueled Generating Sets
(2)
Active -
2025-26 (T-4),
2024-25 (T-4)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active -
2024-25 (T-4)
-
• 49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
-
• 49.9 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
Inactive -
2024-25 (T-4),
2023-24 (T-4)
Gas reciprocating engines.
(2)
Active -
2025-26 (T-4),
2024-25 (T-4)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines
Active -
2024-25 (T-4)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
-
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
-
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active -
2024-25 (T-4)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active -
2024-25 (T-4)
A new build, gas fuelled generation station.
Active -
2024-25 (T-4)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active -
2024-25 (T-4)
CMU consisting of multiple gas reciprocating engines and alternators
Active -
2024-25 (T-4)
49.5 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.
Active -
2024-25 (T-4)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines
Active -
2024-25 (T-4)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active -
2024-25 (T-4)
A new build, gas fuelled generation station.
Active -
2024-25 (T-4)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines
Active -
2024-25 (T-4)
CMU consisting of a gas reciprocating engine and alternator
Active -
2024-25 (T-4)