• A recently completed power plant, with associated civil works, switchgear and electrical connection.
(4)
-
• A power plant, with associated civil works, switchgear and electrical connection.
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-1)
(and 3 more)
-
• STOR diesel engines that will operate environmentally with mixed fuel
(2)
-
• Mixed fuel reciprocating engines
Inactive -
2026-27 (T-4),
2023-24 (T-1)
-
• STOR diesel engines that will operate environmentally with mixed fuel
(2)
-
• New build site with gas reciprocating engines to replace diesel plant
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
-
• Gas reciprocating engines
(2)
-
• Gas reciprocating engines.
(2)
1.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 1 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
1.4 MW
Active -
2026-27 (T-4)
1 * 1.7MW diesel reciprocating engine
(5)
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 1 * 1.7MW diesel reciprocating engine
(4)
-
• 1 * 1.7MW diesel reciporcating engine
1.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
(and 3 more)
Gas reciprocating engines
(5)
1.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Gas reciprocating engines.
(4)
2.4 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(5)
3.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
-
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
(2)
-
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
(2)
-
• Generating CMU comprising of a CHP asset producing energy from waste
3.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
3.9 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 2 more)
Gas reciprocating engines
(4)
3.9 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2023-24 (T-1)
(and 1 more)
Gas reciprocating engines.
(4)
4.1 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• A new build, gas fueled generation station
-
• A new build, gas fuelled generation station.
4.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
Existing Gas Engine
(5)
4.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Gas reciprocating engines
(4)
5.2 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
5.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
CMU consisting of multiple reciprocating engines and alternators
(3)
5.8 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
Gas reciprocating engines
(5)
6.0 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
-
• New reciprocating gensets in acoustic enclosure
(2)
-
• Reciprocating genset
6.4 MW
Inactive -
2026-27 (T-4),
2023-24 (T-4),
2022-23 (T-3)
Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.
6.6 MW
Active -
2026-27 (T-4)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant.
6.9 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
Gas reciprocating engines
(3)
7.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
-
• Energy facility comprising of battery energy storage sets and ancillary equipment.
(3)
-
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
(2)
7.1 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
3 x 2.5 MW gas generator units to be installed at Land At Wolverhampton Powerhouse, Commercial Road, WV1 3QS.
(2)
7.1 MW
Inactive -
2026-27 (T-4),
2023-24 (T-1)
-
• AN 8MW new build gas generating station..
-
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity …
-
• CMU FES003 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity …
-
• ... and 1 more unique descriptions
7.1 MW
Active -
2026-27 (T-4),
2024-25 (T-4)
-
• Containerised Reciprocating Gas Engines
(2)
-
• 2.5MW gas fired peaking power plant
-
• 5MW gas fired peaking power plant
7.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
A 7.5MW gas generating station..
7.1 MW
Active -
2026-27 (T-4)
Gas reciprocating engines
(4)
7.3 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
(5)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
(5)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Reciprocating genset
(3)
8.3 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
-
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
(3)
-
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be …
(2)
9.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
(10)
-
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a …
9.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
-
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
9.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 5 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(3)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
9.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
9.6 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• Reciprocating gas engines running on natural gas
(4)
-
• Additional reciprocating gas engines running on natural gas returned to service
10.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 5 more)
Gas reciprocating engines.
(4)
10.3 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
Gas reciprocating engines
(4)
10.4 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
Reciprocating genset in acoustic enclosure
(5)
11.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
Operational reciprocating gas engines
(5)
11.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
11.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Gas reciprocating engines
(5)
11.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)