Gas reciprocating engines as the generating unit.
Active -
2027-28 (T-4)
Gas reciprocating engines as the generating unit.
Active -
2027-28 (T-4)
Gas reciprocating engines as the generating unit.
Active -
2027-28 (T-4)
Gas reciprocating engines as the generating unit.
Active -
2027-28 (T-4)
Gas reciprocating engines as the generating unit.
Active -
2027-28 (T-4)
Gas reciprocating engines as the generating unit.
Active -
2027-28 (T-4)
Gas reciprocating engines as the generating unit.
Active -
2027-28 (T-4)
-
• Gas fired reciprocating engine(s)
(3)
-
• Gas reciprocating engines as the generating unit.
Inactive -
2027-28 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 1 more)
-
• 1 x 2MW gas gen sets at Whitwell Energy Park.
(2)
-
• Gas reciprocating engines as the generating unit.
Inactive -
2027-28 (T-4),
2020-21 (T-4),
2017-18 (T-1)
-
• A recently completed power plant, with associated civil works, switchgear and electrical connection.
(4)
-
• A power plant, with associated civil works, switchgear and electrical connection.
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-1)
(and 3 more)
Gas reciprocating engines
(5)
1.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Gas reciprocating engines
(4)
3.5 MW
Inactive -
2027-28 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Gas reciprocating engines
(4)
3.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
-
• Gas CHP engines in commercial horticultural usage with no auxilliary load
(4)
-
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
4.2 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
A 4.6MW gas fired peaking plant
4.3 MW
Active -
2027-28 (T-4)
Three new 1.55MW gas reciprocating units to be installed at Langage Solar Park
4.4 MW
Active -
2027-28 (T-4)
Existing Gas Engine
(5)
4.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
(10)
-
• CMU consisting of multiple reciprocating engines and alternators
5.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 10 more)
-
• A new build, battery energy storage system
(2)
-
• A new build, gas fueled generation station.
5.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.
(5)
5.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2023-24 (T-4)
(and 3 more)
Gas reciprocating engines
(5)
6.0 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 6 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
6.8 MW
Active -
2027-28 (T-4)
Gas reciprocating engines
(4)
7.3 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear
(5)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear
(5)
8.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Reciprocating genset
(3)
8.3 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
-
• An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW.
(3)
-
• A 7.5MW new build gas generating station..
8.5 MW
Active -
2027-28 (T-4),
2025-26 (T-1),
2024-25 (T-1)
A New Build gas generating station..
(2)
8.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
(3)
-
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be …
(2)
9.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
(10)
-
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a …
9.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
(5)
9.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
9.6 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• Reciprocating gas engines running on natural gas
(4)
-
• Additional reciprocating gas engines running on natural gas returned to service
10.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2024-25 (T-1)
(and 5 more)
Reciprocating genset
(3)
11.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
Reciprocating genset in acoustic enclosure
(5)
11.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
Operational reciprocating gas engines
(5)
11.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(5)
11.4 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
Gas reciprocating engines
(5)
11.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
Power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
12.2 MW
Active -
2027-28 (T-4)
4.4MW gas fired peaking power plant
(3)
12.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
7.5MW gas fired peaking power plant
(2)
14.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• CMU consisting of multiple reciprocating engines and alternators
(4)
-
• CMU consisting of multiple reciprocating engines and alternators.
14.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
14.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
Reciprocating genset
(4)
14.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
-
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
(4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
14.9 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
14.9 MW
Active -
2027-28 (T-4)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
15.2 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
15.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)