-
• Battery energy storage unit
(2)
-
• New reciprocating genset in acoustic enclosure
(2)
0.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2020-21 (T-4)
(and 1 more)
-
• 2 x 1.2mw gas generator units to be installed on designated land at Stather Raod
(2)
-
• A gas fuelled generating station comprised of multiple reciprocating engines
(2)
-
• 2.4MW gas fired peaking power plant
2.2 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2023-24 (T-4)
(and 2 more)
Gas reciprocating engines.
(4)
2.4 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
Gas reciprocating engines
3.1 MW
Active -
2028-29 (T-4)
Gas reciprocating engines
(4)
3.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
(and 1 more)
Gas reciprocating engines
(4)
3.9 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2023-24 (T-1)
(and 1 more)
Gas reciprocating engines.
(4)
4.1 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
Existing Gas Engine
(5)
4.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Gas reciprocating engines
(4)
5.2 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
(10)
-
• CMU consisting of multiple reciprocating engines and alternators
5.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 10 more)
-
• A new build, battery energy storage system
(2)
-
• A new build, gas fueled generation station.
5.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.
(5)
5.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2023-24 (T-4)
(and 3 more)
Knypersley Power will be a 7.012MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network
(2)
6.6 MW
Active -
2028-29 (T-4),
2024-25 (T-4)
Gas reciprocating engines
(3)
7.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
A New Build gas generating station..
(2)
8.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
(3)
-
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be …
(2)
9.2 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
(10)
-
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a …
9.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 9 more)
Gas reciprocating engines.
(4)
10.3 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
Gas reciprocating engines
(4)
10.4 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• A Distribution Connected Battery Energy Storage System.
-
• A Distribution Connected gas fueled generating station.
10.4 MW
Active -
2028-29 (T-4)
Reciprocating genset
(3)
11.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
Reciprocating genset in acoustic enclosure
(5)
11.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
Operational reciprocating gas engines
(5)
11.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Gas reciprocating engines
(5)
11.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 4 more)
4.4MW gas fired peaking power plant
(3)
12.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
12.9 MW
Active -
2028-29 (T-4)
Gas reciprocating engines
(3)
13.6 MW
Active -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-4)
-
• Gas reciprocating engines.
(4)
-
• Gas reciprocating engines
13.7 MW
Inactive -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
7.5MW gas fired peaking power plant
(2)
14.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• CMU consisting of multiple reciprocating engines and alternators
(4)
-
• CMU consisting of multiple reciprocating engines and alternators.
14.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 2 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
14.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
Gas fired peaking power plant
(2)
14.6 MW
Active -
2028-29 (T-4),
2025-26 (T-1)
Reciprocating genset
(4)
14.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
15.0 MW
Active -
2028-29 (T-4)
A Distribution Connected gas fueled generating station.
15.0 MW
Active -
2028-29 (T-4)
A Distribution Connected gas fueled generating station.
15.0 MW
Active -
2028-29 (T-4)
A Distribution Connected gas fueled generating station.
15.0 MW
Active -
2028-29 (T-4)
A Distribution Connected gas fueled generating station.
15.0 MW
Active -
2028-29 (T-4)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
15.0 MW
Active -
2028-29 (T-4)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
15.0 MW
Active -
2028-29 (T-4)
A Distribution Connected gas fueled generating station.
15.0 MW
Active -
2028-29 (T-4)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
15.0 MW
Active -
2028-29 (T-4)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
15.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
The CMU component comprises of three 2MW Reciprocating Gas Engines
(5)
16.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
A completed power plant, with associated civil works, switchgear and electrical connection.
(8)
16.9 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 6 more)
-
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
(4)
-
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
17.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
(5)
18.4 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
Reciprocating genset
(5)
18.6 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)
A new build gas fuelled generation plant with ancilliary equipment.
18.7 MW
Active -
2028-29 (T-4)
Gas reciprocating engines.
(5)
18.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 3 more)