Search Map View Statistics Support Us Help Login Register

Reciprocating engines

102 unique locations 609 components 0 companies Page 1 of 3
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Fort Parkway Heartlands Birmingham B24 9QT (16 components)

Existing OCGT (5)

WHITETOWER ENERGY LIMITED Reciprocating engines Open Cycle Gas Turbine (OCGT)
267.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Land on the east side of Cowpen Bewley Road, Billingham,  TS23 4ED (15 components)

Gas peaking reciprocating engine (5)

SALTHOLME NORTH POWER LIMITED Reciprocating engines
141.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land to the South of Clay Hill off Hamlet Hill CM19 5JR (6 components)

Gas reciprocating engines (6)

NAZEING WEST POWER LIMITED Reciprocating engines
141.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (8 components)

Existing OCGT. (5)

WHITETOWER ENERGY LIMITED Reciprocating engines Open Cycle Gas Turbine (OCGT)
128.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)

Existing OCGT (5)

E.ON UK Plc Reciprocating engines Open Cycle Gas Turbine (OCGT)
127.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Worset Lane, Hartlepool, TS27 3BQ (6 components)

A new build, gas fuelled generation station (2)

FORSA ENERGY (SPANGO) HOLDINGS LIMITED Reciprocating engines
93.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (5 components)
  • • Gas reciprocating engines as the generating unit. (2)
  • • Battery Storage Station
  • • Open cycle gas turbine as the generating unit.
ALKANE ENERGY UK LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 1.5h) Open Cycle Gas Turbine (OCGT)
68.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4)
Land lying to the north west of Staithes Road, Hull, HU12 8DX (8 components)
  • • 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas … (6)
  • • 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and … (2)
HULL RESERVE POWER LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
58.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Griffiths Road, Lostock Gralam, Northwich, CW9 7XU (8 components)
  • • 20MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local … (3)
  • • 20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local … (2)
NORTHWICH POWER LIMITED Reciprocating engines
56.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Mannaberg Way, Scunthorpe, East Yorkshire, DN15 8XF (8 components)

20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

MARDEN POWER LIMITED Reciprocating engines
55.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Chamberhall Street, Bury, Lancashire, BL9 0LU (5 components)

20MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

BURY POWER LIMITED Reciprocating engines
55.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Deeside Power Station Zone 4 Weybridge Road Deeside Industrial Park Flintshire CH5 2UL (2 components)
  • • Gas Reciprocating Engines
  • • Grid Scale Battery Energy Storage.
DEESIDE POWER (UK) LIMITED Reciprocating engines Storage (Duration 9h)
53.9 MW
Active - 2028-29 (T-4)
Batleys Cash and Carry Talbot Road Fareham PO15 5RY (9 components)
  • • The CMU component is net of the auxiliary power required (4)
  • • A completed power plant, with associated civil works, switchgear and electrical connection.
PEAK GEN TOP CO LIMITED Reciprocating engines
52.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (4 components)

A Battery Energy Storage System. (4)

HB411MIN LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 8h)
47.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Ash Road, Elton, Chester, CH2 4RX (3 components)

A new build, gas fuelled generation station.

MERSEY GENERATION LIMITED Reciprocating engines
46.3 MW
Active - 2028-29 (T-4)
Old Littleton Road, Chertsey, Surrey, TW17 9NU (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

CONRAD (CASTLE BROMWICH) LIMITED Reciprocating engines
45.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (24 components)
  • • Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected … (3)
  • • Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected … (2)
KILN POWER LIMITED Reciprocating engines
44.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (11 components)
  • • 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network. (3)
  • • 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
ST ASAPH POWER LIMITED Reciprocating engines
44.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land at Queens Road, Immingham, DN40 1QR (7 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

IMMINGHAM POWER LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
44.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 4 more)
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (8 components)
  • • 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local … (3)
  • • 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
WARRINGTON POWER LIMITED Reciprocating engines
44.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Mersey Wharf Business Park, Dock Road South, Bromborough Pool, Wirral, Merseyside, CH62 4SU (10 components)
  • • 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local … (3)
  • • 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
KIWI POWER LTD Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
44.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (9 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

KIWI POWER LTD DSR Reciprocating engines
44.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 6 more)
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (12 components)
  • • 16 MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas … (3)
  • • 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network. (2)
WOLVERHAMPTON POWER LTD Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
44.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Loddon Power,Unit A, The Loddon Centre, Wade Road, Basingstoke, RG24 8QW (4 components)

16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the Local distribution network and local gas network. (4)

LODDON POWER LIMITED Reciprocating engines
44.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (15 components)
  • • 16MW Power plant comprising 8x2MW gas reciprocating engines.The Power plant is connected to the local distribution and gas network. (4)
  • • 16MW Power plant comprising reciprocating engines.The Power plant is connected to the local distribution and gas network. (3)
  • • 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution … (2)
  • • ... and 2 more unique descriptions
OGMORE POWER LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
44.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 11 more)
Five Mile Drive, Upton Wold, Moreton-In-Marsh, WR12 7LD (9 components)
  • • New build site with gas reciprocating engines to replace diesel plant (2)
  • • Mixed fuel reciprocating engines
  • • New state-of-the-art green bio-fuel reciprocating engines replacing existing diesel reciprocating engines.
  • • ... and 1 more unique descriptions
GFI73 LTD Reciprocating engines
44.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (10 components)

16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

KIWI POWER LTD DSR Reciprocating engines
44.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
North Road, Vauxhall, Ellesmere Port, CH65 1BA (2 components)

A new build, gas fuelled generation station (2)

FORSA ENERGY (DRUMCROSS) HOLDINGS LIMITED Reciprocating engines
42.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (19 components)

The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used. (5)

P3P BREHON LIMITED Reciprocating engines CHP and autogeneration Combined Heat and Power (CHP)
41.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Titanium Road, Waunarlwydd, Swansea, SA5 4NH (2 components)
  • • New build site with gas reciprocating engines to replace diesel plant
  • • New gas reciprocating engines to be installed and/or existing plant to be refurbished/replaced to operate on green bio-fuel.
GFI TIMET LTD Reciprocating engines
37.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Jack Martin Way, Fintry, Dundee, DD4 9FF (2 components)

A new build, gas fuelled generation station. (2)

FISHCROSS GENERATION LIMITED Reciprocating engines
37.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)
  • • A Battery Energy Storage System. (3)
  • • A New Build Gas fuelled power plant.
HD000ACT LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
35.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
  • • A New Build Gas fuelled power plant at Kirkby substation. (2)
  • • A New Build Transmission Connected Battery Energy Storage System. (2)
HD001KIR LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
32.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2023-24 (T-4) (and 1 more)
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (18 components)
  • • The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (5)
UK Capacity Reserve Ltd Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
28.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (18 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)

UK Capacity Reserve Ltd Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
28.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)

UK POWER RESERVE LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
28.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)

UK POWER RESERVE LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
28.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (17 components)
  • • The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (5)
  • • The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
UK POWER RESERVE LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
28.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (16 components)

The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)

UK POWER RESERVE LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
27.9 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QG (5 components)

10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network. (5)

DAFEN RESERVE POWER LIMITED Reciprocating engines
27.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 2 more)
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (16 components)
  • • The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system. (5)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (5)
UK POWER RESERVE LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
27.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Booth Lane, Sandbach, Cheshire CW11 3PY (1 components)

A gas fueled distribution connected generating station

BLUEFIELD ENERGY LIMITED Reciprocating engines
23.4 MW
Active - 2028-29 (T-4)
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (26 components)
  • • Operational gas reciprocating engine. (3)
  • • Operational Reciprocating Engine (2)
GREENSPAN NIFTY FIFTY LIMITED Reciprocating engines OCGT and Reciprocating Engines
22.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Cavendish Rd Stevenage SG1 2ET UK (15 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW. (5)

CONRAD (STEVENAGE B) LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
22.6 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land at Union Street, Masbrough, Rotherham, S61 1AA (6 components)

Reciprocating genset in acoustic enclosure (5)

FRP MERCIA HOLDCO LIMITED Reciprocating engines
22.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (14 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear (5)

CONRAD (LILLYHALL) LIMITED Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas)
21.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land off Amy Johnson Way, Blackpool, FY4 2RS (13 components)

Containerized high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear (5)

CONRAD (LYTHAM) LIMITED Reciprocating engines
19.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Showing locations 1 - 50 of 102