A new build, gas fuelled generation station.
Active -
2024-25 (T-4)
7MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• Reciprocating Gas Engine(s)
(3)
-
• 1 x Jenbacher 420 (1.4MW)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
Gas fired generating unit(s)
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-4)
(and 2 more)
A gas fuelled generating station.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
3 X 2MW gas fuelled generators installed on a compound on land to the west of Cadwell Lane
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
Gas generating unit(s)
(2)
Inactive -
2023-24 (T-1),
2022-23 (T-1)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each …
(2)
-
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
-
• 10 x 2MW gas reciprocating engines
(2)
-
• 10x 2MW Gas Reciprocating Engines
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• 20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas …
(3)
-
• 20.7MW power plant comprising reciprocating engines. The power plant is connected to the local distribution network and local gas network.
-
• 20.7MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas …
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 2 more)
A gas fuelled generating station.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
21 MW power plant comprising 11 gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
(and 1 more)
Gas reciprocating engines
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution …
(3)
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution …
-
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 6 more)
Gas generating unit(s)
(2)
Inactive -
2023-24 (T-1),
2022-23 (T-1)
CMU consisting of a gas reciprocating engine and alternator
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
Gas fired generating engines
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2019-20 (T-1)
(and 1 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 5 more)
20 MW power plant comprising of 10 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution network and local gas network.
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-1)
(and 1 more)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 3 more)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(4)
-
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 4 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-1)
(and 1 more)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-1)
(and 1 more)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
Gas generating unit(s)
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• A new build gas fuelled generating station.
(2)
-
• A 10MW new build gas fuelled generating station.
-
• A 7MW new build gas fuelled generating station.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
New Build Generating CMU comprising of gas fired reciprocating engines
Inactive -
2023-24 (T-4)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-1)
(and 1 more)
Gas generating unit(s)
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
CMU consisting of multiple reciprocating engines and alternators
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
14MW Power plant comprising 7x2MW gas reciprocating engines. The power plant is connected to the local distribution and gas network.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
-
• Gas fired reciprocating engine(s)
(2)
-
• The site comprises of gas reciprocating unit(s)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
Gas reciprocating engines
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
CMU consisting of multiple reciprocating engines and alternators
(4)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-1)
(and 1 more)
A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
10 x 2MW gas generator units to be installed on designated land within Southbrook Farm
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
A generating station consisting of multiple reciprocating engines and alternators located on a single site
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
A new build gas fuelled power generating unit comprising multiple reciprocating engines.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)