Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Solar Photovoltaic

24 unique locations 51 components 0 companies Page 1 of 1
Map View
Higglers Farm, Titchfield Lane, Wickham, Hampshire, PO17 5PQ (2 components)
  • • New Build CMU comprising of Solar PV and associated plant
  • • New Build CMU comprising of battery storage and associated plant
CONRAD ENERGY (DEVELOPMENTS) II LIMITED Solar Photovoltaic Storage (Duration 2h)
8.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Ellbridge Lane, Ellbridge, Landulph, Saltash, Cornwall, PL12 6PU (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Solar Photovoltaic
6.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land to the North of Tye Lane, Ipswich, IP8 4NP (4 components)

CMU is a photovoltaic system (4)

EDF ENERGY RENEWABLES LIMITED Solar Photovoltaic
5.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Llanwern Farm Solar Park, Whitson, Newport, NP18 2AY (2 components)

75 MW solar PV site with a 50 MVA export connection. Commissioned on 10/03/2021. (2)

GWENT FARMERS' COMMUNITY SOLAR PARTNERSHIP LIMITED Solar Photovoltaic
5.9 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land At Glassthorpe Hill & Land Off Brington Road Flore Northamptonshire, NN7 3NF (2 components)

CMU is a photovoltaic system (2)

EDF ENERGY RENEWABLES LIMITED Solar Photovoltaic
5.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Belville Farm, Coldstream, Berwickshire, TD12 4JB (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Solar Photovoltaic
5.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Little Staughton Airfield Solar Park, Top Farm, Staploe, Saint Neots, PE19 5JB (2 components)

A 50 MWp solar asset with a 40 MW grid connection. Commissioned on 26/02/2021. (2)

LITTLE STAUGHTON AIRFIELD SOLAR LIMITED Solar Photovoltaic
4.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
South Lowfield Farm, Lowfield Lane, Kirkby Fleetham, Northallerton, North Yorkshire DL7 0SY (2 components)

Solar PV generating asset with a TIC of 50 MWp and a connection capacity of 40 MVA. It was commissioned on 14/07/2021. (2)

NEXTPOWER SOUTH LOWFIELD LIMITED Solar Photovoltaic
4.6 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Cotham Grange PV Cotham Lane HAWTON Nottinghamshire NG24 3RJ (2 components)

50 MW solar photovoltaic plant commissioned on 18/01/21. (2)

NEXTPOWER GRANGE LIMITED Solar Photovoltaic
4.6 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land off torkington road, Hazel Grove, Greater Manchester, SK7 6NW (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Solar Photovoltaic
3.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Lower Strensham PV, Bourne Road, Worcester, WR8 9DT (2 components)

40 MW solar PV site with a 25 MW export connection. Commissioned 29/01/2021. (2)

NEXTPOWER LOWER STRENSHAM LIMITED Solar Photovoltaic
2.9 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Common Farm Bookers Lane Dinnington Sheffield S25 1ZX United Kingdom (1 components)

Solar photovoltaic array located in Dinnington, Sheffield, South Yorkshire. The site will consist of solar PV panels and the associated necessary infrastructure.

COMMON FARM SOLAR PARK LIMITED Solar Photovoltaic
2.6 MW
Active - 2028-29 (T-4)
Lakeshill Road, Worcestershire, WR11 8TS (2 components)
  • • The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid …
  • • The CMU is a solar photovoltaic System with a planned 31MW maximum installation, consisting of solar panels. With a grid …
SSE RENEWABLES SOLAR & BATTERY HOLDINGS LIMITED Solar Photovoltaic
2.6 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Manor Farm, Burnett, Keynsham, Bristol, Somerset, BS31 2ED (2 components)

New Build CMU comprising of Solar PV and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Solar Photovoltaic
2.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Tarmac Quarry, Whisby, Lincoln, Lincolnshire, LN6 9BT (4 components)

New Build CMU comprising of Solar PV and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Solar Photovoltaic
1.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Blandford Hill, Dorset, DT11 9AW (2 components)

New build Solar PV array of 12MW capacity (2)

CBS SOLAR ASSETS UK LIMITED Solar Photovoltaic
1.4 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Rolleston Park Farm, Lodge Hill, Tutbury, Staffordshire, DE13 9HQ (2 components)

12 MW Solar PV Array (2)

CBS SOLAR ASSETS UK LIMITED Solar Photovoltaic
1.4 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Tarmac Dunbar, Dunbar Works, Dunbar, East Lothian, EH42 1SL (1 components)

New Build CMU comprising of Solar PV and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Solar Photovoltaic
1.3 MW
Active - 2028-29 (T-4)
Ling Hall Coalpit Lane Lawford Heath Rugby Warwickshire CV23 9HH (6 components)

SolarPV generating station (5)

REGENT PARK ENERGY LIMITED Solar Photovoltaic
1.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
Bindwell Lane PV, Bindwell Lane, Queen Camal, Yeovil, BA22 7NF (2 components)

A 13 MWp solar PV site with a 9 MVA connection, currently under construction. (2)

NEXTPOWER BINDWELL LIMITED Solar Photovoltaic
1.0 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
High Garrett, Sisted, Braintree, Essex, CM77 8BX (2 components)

CMU component is a 8.444 MWp solar PV site and shares its 10.900 MW export and import MPAN connection with a second PV asset, which has a capacity of 4.997 … (2)

NEXTPOWER HIGH GARRETT LIMITED Solar Photovoltaic
0.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Bosworth Solar Farm, Hall Farm, Newbold Verdon, Leicestershire LE9 9NL (2 components)

The component is a 5.4 MWp solar PV site with a 10.527 MVA export connection. This export connection is shared with an adjacent 5 MWp solar PV site which claims … (2)

NEXTPOWER BOSWORTH LIMITED Solar Photovoltaic
0.6 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Showing locations 1 - 24 of 24