Storage (Duration 0.5h)

31 unique locations 53 components 0 companies Page 1 of 1
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components)
  • • West Burton B Power Station CMU 1 WB1-23= 100% T_WBURB-1
  • • West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
  • • West Burton B Power Station CMU 2 WB2-23= 100% T_WBURB-2
  • • ... and 2 more unique descriptions
WEST BURTON B LIMITED Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT)
3608.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Carnegie Road, Liverpool, L13 7HY (1 components)

The CMU comprises lithium ion batteries housed in ISO containers used to house the converters

ORSTED ESS MERSEY LIMITED Storage (Duration 0.5h)
1.4 MW
Active - 2025-26 (T-1)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (5)

VATTENFALL WIND POWER LTD Storage Storage (Duration 1h) Storage (Duration 0.5h)
1.3 MW
Inactive - 2023-24 (T-1), 2022-23 (T-1), 2021-22 (T-4) (and 3 more)
35 Arkwright Road, Astmoor, Runcorn, WA7 1NU. (2 components)

The batteries are housed within racks and installed, together with converters, inside an existing building. The batteries will be installed in the racks off-site and then delivered to site ready … (2)

Shaw-Energi Ltd Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Land Adjacent to Braintree Substation Braintree 400kV substation Braintree Road Cressing CM77 8DJ (1 components)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Pivot Power LLP Storage (Duration 0.5h)
Inactive - 2022-23 (T-4)
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components)

NEW BUILD BATTERY STORAGE STATION (2)

ROSSIDE ENERGY LIMITED Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Land Adjacent to Norwich Substation Mangreen Lane Stoke Holy Cross Norwich NR14 8PG (1 components)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Pivot Power LLP Storage (Duration 0.5h)
Inactive - 2022-23 (T-4)
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Waterswallows Energy Limited Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Land Adjacent to Nursling Substation Station Road Nursling Southampton SO16 0AH (1 components)

New build Transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear with protection

Pivot Power LLP Storage (Duration 0.5h)
Inactive - 2022-23 (T-4)
Stanstead Abbots Ware Hertfordshire SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

PEAK GEN POWER 10 LIMITED Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4)
Land to the West of Harker Grid Sub Station Low Harker Harker Carlisle CA6 4DQ (1 components)

New build transmission connected battery storage site

Pivot Power LLP Storage (Duration 0.5h)
Inactive - 2022-23 (T-4)
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (5)

GLASSENBURY BATTERY STORAGE LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2019-20 (T-1) (and 2 more)
Albion Road, Dartford, Kent, DA1 5PZ (6 components)

battery storage (3)

HC ESS2 LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Land at Lookabootye Broxburn West Lothian EH52 5PD (4 components)
  • • New build battery (2)
  • • Operational battery (2)
UK ENERGY STORAGE SERVICES LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2020-21 (T-1), 2019-20 (T-1) (and 1 more)
Lower Road, Brentwood, CM13 1BZ (2 components)
  • • Advanced battery energy storage system
  • • New Build Generation CMU, advanced battery energy storage system
GSES 1 LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2019-20 (T-1)
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components)

battery storage (3)

HC ESS2 LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (3 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The … (3)

E.ON UK CHP LIMITED Storage Storage (Duration 0.5h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility (3)

CBS ENERGY STORAGE ASSETS UK LIMITED Storage Storage (Duration 0.5h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (5 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (4)

CLEATOR BATTERY STORAGE LIMITED Storage Storage (Duration 0.5h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1) (and 1 more)
Carnegie Road, Liverpool, L13 7HY. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

ORSTED ESS MERSEY LIMITED Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
Amersham Road Denham Buckinghamshire SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection. (5)

Field Gerrards Cross Ltd Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (9 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (5)

NEVENDON ENERGY STORAGE LTD Storage Storage (Duration 2h) Storage (Duration 0.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 5 more)
FORDTOWN ENERGY STORAGE, KINTORE, INVERURIE, AB51 0XJ (3 components)

49.99MW Lithium-ion Energy Storage System (3)

SUSI EELPOWER FORDTOWN LIMITED Storage (Duration 1h) Storage (Duration 0.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Shaw-Energi Ltd Storage Storage (Duration 1h) Storage (Duration 0.5h)
Inactive - 2024-25 (T-4), 2022-23 (T-4), 2021-22 (T-4)
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (3 components)
  • • A 10MW New Build Battery Storage Site (2)
  • • A 10MW Existing Generating Battery Storage Site
HC ESS3 LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Gateway Crescent, Oldham, Lancashire, OL9 8AU. (2 components)

The CMU comprises of Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (2)

Shaw-Energi Ltd Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Showing locations 1 - 31 of 31