Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 0.5h)

18 unique locations 33 components 0 companies Page 1 of 1
Map View
West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (22 components)
  • • West Burton B Power Station CMU 1 WB1-23= 100% T_WBURB-1
  • • West Burton B Power Station CMU 1 WB1-24= 100% T_WBURB-1
  • • West Burton B Power Station CMU 2 WB2-23= 100% T_WBURB-2
  • • ... and 2 more unique descriptions
WEST BURTON B LIMITED Storage (Duration 0.5h) Combined Cycle Gas Turbine (CCGT)
3608.4 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (5)

VATTENFALL WIND POWER LTD Storage Storage (Duration 1h) Storage (Duration 0.5h)
1.3 MW
Inactive - 2023-24 (T-1), 2022-23 (T-1), 2021-22 (T-4) (and 3 more)
Carnegie Road, Liverpool, L13 7HY. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

ORSTED ESS MERSEY LIMITED Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (5)

GLASSENBURY BATTERY STORAGE LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2019-20 (T-1) (and 2 more)
Albion Road, Dartford, Kent, DA1 5PZ (6 components)

battery storage (3)

HC ESS2 LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Land at Lookabootye Broxburn West Lothian EH52 5PD (4 components)
  • • New build battery (2)
  • • Operational battery (2)
UK ENERGY STORAGE SERVICES LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2020-21 (T-1), 2019-20 (T-1) (and 1 more)
Lower Road, Brentwood, CM13 1BZ (2 components)
  • • Advanced battery energy storage system
  • • New Build Generation CMU, advanced battery energy storage system
GSES 1 LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2019-20 (T-1)
SWEB Estate, Romney Avenue, Lockleaze, Bristol, BS7 9ST (3 components)

battery storage (3)

HC ESS2 LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (3 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The … (3)

E.ON UK CHP LIMITED Storage Storage (Duration 0.5h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility (3)

CBS ENERGY STORAGE ASSETS UK LIMITED Storage Storage (Duration 0.5h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (5 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (4)

CLEATOR BATTERY STORAGE LIMITED Storage Storage (Duration 0.5h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1) (and 1 more)
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (9 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (5)

NEVENDON ENERGY STORAGE LTD Storage Storage (Duration 2h) Storage (Duration 0.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 5 more)
Roundponds Farm Shurnold Melksham Wiltshire SN12 8DF (3 components)
  • • A 10MW New Build Battery Storage Site (2)
  • • A 10MW Existing Generating Battery Storage Site
HC ESS3 LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Amersham Road Denham Buckinghamshire SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection. (5)

Field Gerrards Cross Ltd Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
Showing locations 1 - 18 of 18