• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
-
• ... and 2 more unique descriptions
3416.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• A New Build battery energy storage system.
(3)
-
• An existing battery energy storage system.
-
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
20.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build 48MW battery energy storage system
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
-
• A new build 34MW battery energy storage system
(2)
-
• A new build 34MW battery energy storage system commissioned in July 2021
(2)
-
• A new build 32MW battery energy storage system
12.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 4 more)
Battery Storage Plant
(5)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Existing 25 MW storage site using Lithium Ion Batteries
(3)
-
• 25 MW storage site using Lithium Ion Batteries
(2)
7.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
-
• 17.315 MW installed capacity Battery Storage facility
(2)
-
• 17.615 MW installed capacity Battery Storage facility
(2)
-
• 19.791 MW installed capacity Battery Storage facility
5.1 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
(4)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
4.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
(3)
-
• 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
-
• 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
2.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• A 7.5MW Tesla Battery Energy Storage System
(4)
-
• Tesla Battery Energy Storage System
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• 7 MW of Battery Storage located at Grantham.
(3)
-
• Battery Storage located at Grantham.
(2)
1.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 5MW, 1 hour/5MWh lithium-ion battery
(4)
-
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
0.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 5 more)
The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 1 more)
The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
A 8MW New Build Battery Storage Site
Inactive -
2022-23 (T-4)
The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will …
-
• The CMU component at the Bransholme Facility will be a capacity market and load balancing facility comprised of gas turbines …
Inactive -
2022-23 (T-4),
2021-22 (T-4)
20.000 MW of battery storage located at Lascar Works
Inactive -
2022-23 (T-4)
10MW battery energy storage facility at Upton Lane, Rownhams
(5)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 2 more)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …
Inactive -
2022-23 (T-4)
The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. …
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
A new power plant, with associated civil works, switchgear and electrical connection.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
-
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
(2)
-
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
2MW BESS
(5)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-1)
(and 2 more)
Battery Energy Storage System
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
Battery Storage
Inactive -
2022-23 (T-4)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
Frequency response 60 minute Battery Storage
Inactive -
2022-23 (T-4)
-
• A 20MW New Build Battery Storage Site
-
• A 40MW New Build Battery Storage Site
Inactive -
2022-23 (T-4)
The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
Inactive -
2022-23 (T-4)
This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network …
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details.
(2)
Inactive -
2022-23 (T-4),
2019-20 (T-1)
20.000 MW of battery storage located at Macclesfield
Inactive -
2022-23 (T-4)
3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately
Inactive -
2022-23 (T-4)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
Inactive -
2022-23 (T-4)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
Inactive -
2022-23 (T-4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• A Battery Energy Storage System.
(2)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• ... and 1 more unique descriptions
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
-
• A Battery Energy Storage System.
(3)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
-
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 3 more)
The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)