Search Map View Statistics Support Us Help Login Register

Storage (Duration 1h)

77 unique locations 254 components 0 companies Page 1 of 2
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build 48MW battery energy storage system
HARMONY CTF LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 4 more)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
  • • A new build 34MW battery energy storage system (2)
  • • A new build 34MW battery energy storage system commissioned in July 2021 (2)
  • • A new build 32MW battery energy storage system
HARMONY CS LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
12.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 4 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS (13 components)
  • • 17.315 MW installed capacity Battery Storage facility (2)
  • • 17.615 MW installed capacity Battery Storage facility (2)
  • • 19.791 MW installed capacity Battery Storage facility
SUSI EELPOWER ROCK FARM LIMITED DSR Storage (Duration 1h)
5.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
RNA-Energy Ltd Storage Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 6 more)
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP (12 components)
  • • 10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire (3)
  • • 8.179 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
  • • 8.436 MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
SUSI EELPOWER WINCHESTER LIMITED DSR Storage (Duration 1h)
2.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
  • • A 7.5MW Tesla Battery Energy Storage System (4)
  • • Tesla Battery Energy Storage System
HARMONY HB LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (13 components)
  • • 7 MW of Battery Storage located at Grantham. (3)
  • • Battery Storage located at Grantham. (2)
Limejump Virtual 1 Limited Storage Storage (Duration 1h)
1.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)
  • • 5MW, 1 hour/5MWh lithium-ion battery (4)
  • • Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
BRAINTREE ELECTRIC FORECOURT LTD Storage Storage (Duration 1h)
0.9 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 5 more)
Low Dyke, Calthwaite, Penrith, CA11 9PS (4 components)

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters (3)

BALANCE POWER PROJECTS LIMITED Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-4), 2022-23 (T-3) (and 1 more)
Land on the south east side of Lark's Lane, Latteridge, Iron Acton, BS37 9TX (2 components)

The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each. (2)

SOUTH WEST GRID STORAGE TWO LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Perseverance Road, Hereford, UK, HR4 9SE (1 components)

A 8MW New Build Battery Storage Site

Noriker Perseverance Ltd Storage (Duration 1h)
Inactive - 2022-23 (T-4)
Unit A ? Apex 30, 233-269 London Road, Stainess, TW18 4JU (2 components)

The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW. (2)

Reliagen Electric Ltd Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Land to the North of Bransholme Rd, Hull HU7 4YP, UK (2 components)
  • • The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will …
  • • The CMU component at the Bransholme Facility will be a capacity market and load balancing facility comprised of gas turbines …
NORTH EAST GRID STORAGE TWO LTD Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Lascar Works, Tanpits Road, Bury BL9 5BY (1 components)

20.000 MW of battery storage located at Lascar Works

LASCAR BATTERY STORAGE LIMITED Storage (Duration 1h)
Inactive - 2022-23 (T-4)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)

10MW battery energy storage facility at Upton Lane, Rownhams (5)

GBSL NURSLING LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
Land adjacent to electricity sub station Stonehill Charlton Wiltshire SN16 9RP (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

MINETY BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Land at Traston Road, Newport NP19 4PW (1 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

FPC INDUSTRY & ENTERPRISE 2 LIMITED Storage (Duration 1h)
Inactive - 2022-23 (T-4)
Land off Tower House Lane, Saltend, Hull, UK, HU12 8EE (2 components)

The CMU component at the Saltend Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each. (2)

Peak Power Connections Limited Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)

E.ON UK CHP LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

HILLHOUSE BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

FISHCROSS BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

PEAK GEN POWER 26 LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4)
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (3 components)
  • • A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer … (2)
  • • A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
ENERGY STORE 6 LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (5)

KIWI POWER LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-1) (and 2 more)
Altcar Training Camp Grange Road Ince Blundell, L38 7JE (2 components)

Battery Energy Storage System (2)

KIWI POWER LTD Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2019-20 (T-1)
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)

SOUTH EAST GRID STORAGE TWO LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

WEST MELTON BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Land West of Hopewell Street, Stairfoot, Barnsley, S70 3ET (1 components)

Frequency response 60 minute Battery Storage

ADD RENEWABLES NO.3 LIMITED Storage (Duration 1h)
Inactive - 2022-23 (T-4)
Netherlands Way, Kiln Lane Industrial Estate, Starlingborough, UK, DN41 8DF (2 components)
  • • A 20MW New Build Battery Storage Site
  • • A 40MW New Build Battery Storage Site
HC ESS8 Limited Storage (Duration 1h)
Inactive - 2022-23 (T-4)
Land in the vicinity of Feeder Road, to the east of Phillip Street, Bristol BS2 0TB, UK (1 components)

The CMU component at the Feeder Road Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Portman Power Limited Storage (Duration 1h)
Inactive - 2022-23 (T-4)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (4)

Ecotricity Generation Limited Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1) (and 1 more)
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)

RNK Holding Ltd Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
Land South of Main Road, Bilton, Hull, HU11 4DZ (2 components)

New build Battery Energy Storage with export up to 21MW. Refer to the Covering Letter for further details. (2)

ENERGY STORE 4 LTD Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2019-20 (T-1)
Hulley Road Macclesfield Cheshire SK10 2LP (1 components)

20.000 MW of battery storage located at Macclesfield

Hulley Road Energy Storage Limited Storage (Duration 1h)
Inactive - 2022-23 (T-4)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (1 components)

3 MW battery to be installed on the same site as an existing CMU however with a new grid connection and metered separately

BESS Claredown Limited Storage (Duration 1h)
Inactive - 2022-23 (T-4)
Land adjacent to electricity sub station Stonehill Charlton, Malmsbury, Wiltshire SN16 9DX (1 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

Lower Minety Energy Limited Storage (Duration 1h)
Inactive - 2022-23 (T-4)
Church Bottom, Salisbury, SP4 6NN (3 components)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
  • • 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
  • • 20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
ARL 008 Limited Storage (Duration 1h)
Inactive - 2022-23 (T-4)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
SIGBAT C LIMITED Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
  • • A Battery Energy Storage System. (2)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
  • • 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
  • • ... and 1 more unique descriptions
BRK 001 Limited Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Back Lane, Chesterfield, S44 5XQ (8 components)
  • • A Battery Energy Storage System. (3)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
  • • 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
ARL 027 LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2023-24 (T-1) (and 3 more)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 B1 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C3 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C2 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Showing locations 1 - 50 of 77