• 49.900MW/49.900MWh battery storage asset, 1 hour duration
(4)
-
• The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will …
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 2 more)
The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …
Inactive -
2023-24 (T-1)
Front of the Meter battery storage asset located in Devon.
Inactive -
2023-24 (T-1)
New build one-hour duration storage to replace diesel plant
Inactive -
2023-24 (T-1)
4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• 1 x 50MW Lithium-ion battery with duration of 1 hour
-
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
Inactive -
2025-26 (T-4),
2023-24 (T-1)
New build one-hour duration storage to replace diesel plant
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• 10MW Storage
(2)
-
• 20MW of Battery Energy Storage Systems
(2)
-
• 15MW of Battery Energy Storage Systems
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
49.900MW one-hour duration battery energy storage facility.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
40 MW/40MWh BESS
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• New build one-hour duration storage to replace diesel plant
(2)
-
• One-hour duration battery storage project.
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
A Battery Energy Storage System
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
49.99MW Lithium-ion Energy Storage System
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
49.900MW one-hour duration battery energy storage facility.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• New build one-hour duration storage to replace diesel plant
(2)
-
• One-hour duration Battery Storage Plant.
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
Battery Storage Plant
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
Battery storage 40.000MW/40.000MWh one duration battery new build
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
New build battery storage 50.000MW/50.000MWh one hour duration asset
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
battery storage asset 49.900MW/49.900MWh
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• A Battery Energy Storage System
(3)
-
• A Battery Energy Storage System, which has already PQ'd as POTM25
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 1 more)
-
• A Battery Energy Storage System.
(3)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
-
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 3 more)
-
• Battery Energy storage linked to solar farm
(3)
-
• Solar farm
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
-
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for …
-
• ... and 2 more unique descriptions
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• A 40MW New Build Battery Storage site
(3)
-
• A 45MWh New Build Battery Storage site
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
1.200MW BESS
(3)
0.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-1)
1.200 MW battery storage
(3)
0.1 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2023-24 (T-1)
6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt
(2)
0.7 MW
Inactive -
2026-27 (T-4),
2023-24 (T-1)
6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt
(2)
0.7 MW
Inactive -
2026-27 (T-4),
2023-24 (T-1)
-
• 5MW, 1 hour/5MWh lithium-ion battery
(4)
-
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
0.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 5 more)
New Build CMU comprising of battery storage and associated plant
(3)
1.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.
(5)
1.3 MW
Inactive -
2023-24 (T-1),
2022-23 (T-1),
2021-22 (T-4)
(and 3 more)
New Build CMU comprising of battery storage and associated plant
(3)
1.4 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2023-24 (T-1)
-
• A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
(3)
-
• A 5MW - 5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution …
(2)
1.5 MW
Inactive -
2026-27 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
10MW of Battery Energy Storage Systems to be built.
(4)
1.9 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage
(4)
2.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 1 more)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
2.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
-
• A 7.5MW Tesla Battery Energy Storage System
(4)
-
• Tesla Battery Energy Storage System
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
(5)
2.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 2 more)
A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt
(5)
2.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 2 more)
-
• battery storage unit
(3)
-
• New build battery storage unit
-
• New build transmission connected battery storage unit comprising battery cells, DC switchgear, power conversion, AC voltage transformation and connection switchgear …
3.2 MW
Inactive -
2028-29 (T-4),
2025-26 (T-1),
2024-25 (T-1)
(and 6 more)
Battery Energy Storage system operating alongside solar farm
(5)
3.7 MW
Inactive -
2025-26 (T-1),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
(4)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
4.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
(4)
4.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 1 more)
BESS System made of 35x1.25 MVA Inverters connected to Batteries in a designated warehouse.
(3)
4.6 MW
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
50MW Lithium-ion Energy Storage System
(4)
4.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 1 more)
-
• Battery Storage Station
(3)
-
• 3 x 2MW gas gen sets
-
• 8 x 2MW gas gen sets at West Road
5.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
-
• 49.990 MW battery energy storage system
-
• Battery Energy Storage System
-
• battery energy storage system
6.1 MW
Inactive -
2025-26 (T-1),
2024-25 (T-1),
2023-24 (T-1)
The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
(5)
6.1 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 4 more)
-
• Battery storage plant
(4)
-
• Existing generating battery storage unit.
6.1 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)