A 99.9MW battery storage system comprising approx 13 battery skid units at Hales Lane
Active -
2025-26 (T-4)
40 MW/40MWh BESS located on an existing farm in Buckinghamshire, England
Active -
2025-26 (T-4)
New Build CMU comprising of battery storage and associated plant
Active -
2025-26 (T-4)
Battery Energy Storage System
Active -
2025-26 (T-4)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …
Active -
2024-25 (T-4)
4 controllable Battery BMUs located at the Capenhurst site with 2 auxiliary station load BMUs
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
A 18MW distribution connected energy storage plant comprising of batteries
Active -
2025-26 (T-4)
A 25MW/25MWh Storage: minimum 1.0 hour duration battery facility which will share a future connection agreement with a future solar farm but electrically separate with its own independent Import and …
Active -
2025-26 (T-4)
New Build CMU comprising of battery storage and associated plant
Active -
2025-26 (T-4)
The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 2 more)
-
• 10MW Storage
(2)
-
• 20MW of Battery Energy Storage Systems
(2)
-
• 15MW of Battery Energy Storage Systems
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• A 40MW New Build Battery Storage site
(3)
-
• A 45MWh New Build Battery Storage site
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
-
• A Battery Energy Storage System
(3)
-
• A Battery Energy Storage System, which has already PQ'd as POTM25
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 1 more)
40 MW/40MWh BESS
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
A Battery Energy Storage System.
(2)
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
1.500MW Battery Energy Storage System
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-1)
(and 1 more)
-
• A gas fuelled generating station
(2)
-
• A Battery Energy Storage System
Active -
2025-26 (T-4),
2024-25 (T-1)
-
• New build one-hour duration storage to replace diesel plant
(2)
-
• One-hour duration battery storage project.
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
(3)
Inactive -
2024-25 (T-4),
2022-23 (T-4),
2021-22 (T-4)
A Battery Energy Storage System
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
battery storage asset 49.900MW/49.900MWh
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
49.99MW Lithium-ion Energy Storage System
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
New build battery storage 50.000MW/50.000MWh one hour duration asset
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
49.900MW one-hour duration battery energy storage facility.
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
-
• New build one-hour duration storage to replace diesel plant
(2)
-
• One-hour duration Battery Storage Plant.
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
Battery storage 40.000MW/40.000MWh one duration battery new build
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
-
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery …
(2)
-
• Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery …
(2)
Inactive -
2025-26 (T-4),
2022-23 (T-4),
2022-23 (T-1)
(and 1 more)
-
• 10MW of onshore wind generation
-
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
-
• 49.900MW storage installation
Active -
2024-25 (T-4)
A 90 MW battery storage system comprising approx 11 battery skid units units at Royle Farm Business Park
Active -
2025-26 (T-4)
100MW storage unit
Active -
2024-25 (T-4)
9.999MW/9.999MWh BESS located to the rear of Dean Park Orchard Loan in Orchardbank Industrial Estate
Active -
2025-26 (T-4)
39.9MW/39.9MWh greenfield BESS located on land north east of Blackhill Amenity Site, just off Luss Road in Helensburgh
Active -
2025-26 (T-4)
49.900 Storage unit
Active -
2024-25 (T-4)
New battery storage project
Active -
2025-26 (T-4)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
A 49.400 MW / 49.400 MWh battery energy storage system located in land off Lower Farm, Itchington, South Glos. BS35 3TH.
Active -
2025-26 (T-4)
49.9MW Battery Storage facility located at Capenhurst GSP
Active -
2024-25 (T-4)
Grid-scale energy storage system based on Lithium Ion, capable of exporting 20MW for a 1 hour duration installed on designated land within a compound at Newport
Active -
2025-26 (T-4)
Grid-scale energy storage system based on Lithium Ion, capable of exporting 25MW for a 1 hour duration installed on designated land within a compound at Burton upon trent
Active -
2025-26 (T-4)
New Build CMU comprising of battery storage and associated plant
Active -
2025-26 (T-4)
-
• A Battery Energy Storage System.
(2)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• 19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
-
• ... and 1 more unique descriptions
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
Battery Storage Plant
(4)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
-
• 0.500MW Battery Energy Storage System
(2)
-
• 0.5MW of demand reduction
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 1 more)
4 x 2.5MW and 1 x 0.8MW BESS units installed on the site
Active -
2024-25 (T-4)
A 99.8MW battery storage system comprising approx 13 battery skid units at Galaxy Business Park
Active -
2025-26 (T-4)
99.4MW/99.4MWh brownfield BESS located off Shaw Street on a plot of land called Forkers Yard in West Bromwich, England
Active -
2025-26 (T-4)
-
• A Battery Energy Storage System.
(3)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
-
• 5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 3 more)
-
• Battery Energy storage linked to solar farm
(3)
-
• Solar farm
(2)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)