A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.
(3)
1.3 MW
Inactive -
2023-24 (T-1),
2022-23 (T-1),
2021-22 (T-4)
(and 2 more)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive -
2019-20 (T-1)
44MW Storage consisting of 11 x 4MW units
Inactive -
2021-22 (T-4)
Battery storage
(3)
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
6MW BESS
(2)
Inactive -
2019-20 (T-1),
2018-19 (T-1)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
-
• 8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for …
-
• A Battery Energy Storage System
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …
Inactive -
2023-24 (T-1)
10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• A 34MW New Build Battery Storage Site.
-
• A 49MW New Build Battery Storage Site.
-
• A 49MW existing Battery Storage Site.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
A Battery Energy Storage System
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 2 more)
-
• 10 MW Storage facility located at Balby, Doncaster.
(2)
-
• 10 MW Storage facility
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 …
(2)
-
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4)
Battery Energy Storage System
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
A Battery Energy Storage System
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
49.9mw Lithium Ion batteries and power conversion system on a compound at Bolney Substation
Inactive -
2023-24 (T-4)
Front of the Meter battery storage asset located in Devon.
Inactive -
2023-24 (T-1)
-
• A 20MW New Build Battery Storage site
(2)
-
• A 29.5MW New Build Battery Storage site
Inactive -
2023-24 (T-4),
2022-23 (T-3)
New build one-hour duration storage to replace diesel plant
Inactive -
2023-24 (T-1)
20MW of Lithium Ion batteries and power conversion system installed on a compound on land north Oxford Road
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
49.9 MW of Lithium Ion battery storage and power conversion system on a compound at Indian Queens Substation.
Inactive -
2023-24 (T-4)
Storage facility
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2021-22 (T-4)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
A Battery Energy Storage System
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
5MW of Lithium Ion battery storage and power conversion systems.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• 1 x 50MW Lithium-ion batteryw with duration of 1 hour
(2)
-
• 1 x 50MW Lithium-ion battery with duration of 1 hour
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 1 more)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
-
• 20 x 1mw Battery Storage units to be installed on designated land at Greenfield Road - Connection offer is for …
-
• A Battery Energy Storage System.
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
-
• A 2.5MW New Build Battery Storage System
(2)
-
• A New Build 2.5MW Generation Battery Site
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
49.9MW Lithium Ion Batteries and power conversion system installed in a compound at Chickerell Substation.
Inactive -
2023-24 (T-4)
A 25MW New Build Battery Storage site
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
-
• A Battery Energy Storage System.
(2)
-
• 7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
The CMU component at the Iron Acton Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.9MW each.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-3)
A 8MW New Build Battery Storage Site
Inactive -
2022-23 (T-4)
-
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of …
(2)
-
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export …
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
The CMU at Staines will be an energy storage facility with a maximum import and export capacity of 49.9MW.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2020-21 (T-1)
-
• 49.9MW Battery Energy Storage System located in Malmesbury, Wiltshire
(2)
-
• 49.900MW Battery Energy Storage System
Inactive -
2023-24 (T-4),
2022-23 (T-3),
2022-23 (T-1)
(and 2 more)
20.000 MW of battery storage located at Lascar Works
Inactive -
2022-23 (T-4)
10MW battery energy storage facility at Upton Lane, Rownhams
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 2 more)
The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …
Inactive -
2022-23 (T-4)
-
• A 50MW New Build Battery Storage site
(2)
-
• Existing 50MW Battery Storage site
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. …
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• A Battery Energy Storage System
(2)
-
• 7 x 1mw Battery Storage units to be installed on designated land at Petts Wood
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)