The CMU component is a combined cycle gas turbine
Existing CCGT Unit
Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
The CMU component is a combined cycle gas turbine
Didcot B6 - CCGT MSID: 4055
Didcot B5 - CCGT MSID: 4055
A combined cycle gas turbine generating plant
New build Combined Cycle Gas Turbine unit 2 at Eggborough power station.
Single Shaft CCGT (Module 2)
Didcot B5 - CCGT MSID: 4055
2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …
Enfield CCGT Power Station - (one unit station)
Existing CCGT Unit
Existing CCGT Unit
Multi Shaft CCGT (Module 1)
Cottam Development Centre (CDC) CCGT single unit station
New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
West Burton B Power Station CMU 3 WB3-20= 100% T_WBURB-3
New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Staythorpe 3 - CCGT MSID: 7210
Staythorpe 2 - CCGT MSID: 7210
Staythorpe 4 - CCGT MSID: 7210
Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones …
Staythorpe 1 - CCGT MSID: 7210
New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
No description available.
The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.
West Burton B Power Station CMU 1 WB1-20= 100% T_WBURB-1
Pembroke 11 - CCGT MSID: 7237
EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …
Pembroke 21 - CCGT MSID: 7237
A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near …
Little Barford 1 CCGT MSID: 4052
EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
New build Combined Cycle Gas Turbine unit 2 at Eggborough power station.
Great Yarmouth 1 - CCGT MSID: 7111
Combined Cycle Gas Turbine plant
New build Combined Cycle Gas Turbine unit 1 at Eggborough power station.
Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
Combined Cycle Gas Turbine
Existing CCGT
A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being …
Existing CCGT
Combined Cycle Gas Turbine plant
Pembroke 31 - CCGT MSID: 7237
Connah's Quay PS Unit 1 CCGT