Capacity Market Search

Showing components with technology: Combined Cycle Gas Turbine (CCGT)

Displaying items 201 - 250 of 559 matching components (Page 5 of 12)

Component Results (559)

Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom

The CMU component is a combined cycle gas turbine

Carrington Power Limited CMU: CARR-2 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Severn Power Station West Nash Road Nash Newport NP18 2BZ

Existing CCGT Unit

SEVERN POWER LIMITED CMU: SV2410 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A CMU DB: 386.54 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX

Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF

VPI POWER LIMITED CMU: VP24BM Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A CMU DB: 56.10 MW 2025-26 (T-1) One Year Ahead Capacity Auction
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk

New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.

EP UK POWER DEVELOPMENT LTD CMU: KLYNB2 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom

The CMU component is a combined cycle gas turbine

Carrington Power Limited CMU: CARR-1 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Clough Lane North Killingholme North Lincolnshire DN40 3JP

A combined cycle gas turbine generating plant

C.GEN KILLINGHOLME LIMITED CMU: CGEN21 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS

New build Combined Cycle Gas Turbine unit 2 at Eggborough power station.

EGGBOROUGH POWER LIMITED CMU: EGGB25 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP

Single Shaft CCGT (Module 2)

SEABANK POWER LIMITED CMU: SEA1_2 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Huntsman Drive, Seal Sands, TS2 1TT

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

E.ON UK Plc CMU: SAND-1 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
111 Brancroft Way Enfield Middlesex EN3 7PL

Enfield CCGT Power Station - (one unit station)

Uniper Global Commodities SE CMU: EECL-1 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP

Multi Shaft CCGT (Module 1)

SEABANK POWER LIMITED CMU: SEA1_2 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Cottam Development Centre Power Station Cottam Retford DN22 0TF

Cottam Development Centre (CDC) CCGT single unit station

Uniper Global Commodities SE CMU: CDCL-1 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk

New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.

EP UK POWER DEVELOPMENT LTD CMU: KLYNB2 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk

New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.

EP UK POWER DEVELOPMENT LTD CMU: KLYNB1 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Site of the former Teesside Power Station Greystone Road Grangetown Middlesbrough TS6 8JF

Tees CCPP is a 542.6MW CCGT unit to be installed on designated land within the (former ICI) Wilton Site this will be connected to Greystones 275kV 'A' Substation and Greystones …

Sembcorp Utilities (UK) Limited CMU: S24TP1 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
132 Manchester Road, Carrington, Manchester, M31 4AY

New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester

WAINSTONES ENERGY LIMITED CMU: TRAFU1 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Location N/A

No description available.

SSE THERMAL GENERATION (SCOTLAND) LIMITED CMU: PEHE-2 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Drakelow Power Station, Burton on Trent, DE15 9TZ

The unit is a four on two air cooled CCGT utilizing Siemens Industrial Trent DLE aero-derivitive gas turbines. The plant will be located at Drakelow, South Derbyshire.

Powersite DL Ltd CMU: PWRST5 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Pembroke Power Station Pembroke Dyfed SA71 5SS

Pembroke 11 - CCGT MSID: 7237

RWE GENERATION UK PLC CMU: PM1120 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

EP SHB LIMITED CMU: EPSHBA Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ.

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

EP SHB LIMITED CMU: EPSHBA Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
West Marsh Road, Spalding, Lincolnshire, PE11 3BB

A CCGT station consisting of two General Electric 9FA+e gas turbines with two VOGT-NEM heat recovery steam generators and one Hitachi steam turbine and is based near Spalding in Lincolnshire. …

SPALDING ENERGY COMPANY, LTD. CMU: IGSP20 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Pembroke Power Station Pembroke Dyfed SA71 5SS

Pembroke 21 - CCGT MSID: 7237

RWE GENERATION UK PLC CMU: PM2120 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near …

ROCKSAVAGE POWER COMPANY, LTD. CMU: IGRK20 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Little Barford Power Station Little Barford St Neots PE19 6YT

Little Barford 1 CCGT MSID: 4052

RWE GENERATION UK PLC CMU: LBAR20 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW.

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

EP LANGAGE LIMITED CMU: EPLAGA Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS

New build Combined Cycle Gas Turbine unit 2 at Eggborough power station.

EGGBOROUGH POWER LIMITED CMU: EGGB24 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Basin Road South, Portslade, East Sussex, BN41 1WF

Combined Cycle Gas Turbine plant

VPI POWER LIMITED CMU: DX20SH Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS

New build Combined Cycle Gas Turbine unit 1 at Eggborough power station.

EGGBOROUGH POWER LIMITED CMU: EGGB24 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP

Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174

RWE GENERATION UK PLC CMU: HYTH20 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF

Combined Cycle Gas Turbine

VPI POWER LIMITED CMU: DX20RH Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
The Manor Way, Stanford-le-Hope, Essex, SS17 9GN

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being …

CORYTON ENERGY COMPANY, LTD. CMU: IGCE20 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX

Combined Cycle Gas Turbine plant

VPI POWER LIMITED CMU: DX20DC Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Pembroke Power Station Pembroke Dyfed SA71 5SS

Pembroke 31 - CCGT MSID: 7237

RWE GENERATION UK PLC CMU: PM3120 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP

Connah's Quay PS Unit 1 CCGT

UNIPER GLOBAL COMMODITIES SE CMU: CNQP35 Combined Cycle Gas Turbine (CCGT) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction