Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Yorkshire Way, Armthorpe, Doncaster DN3 3GW (1 component)

Behind-the-meter battery storage system at IKEA's Doncaster distribution centre

Inactive • 2021-22 (T-4)
Yard (see map) near to 137 Netherton Street, Wishaw, ML2 0EY (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Yalberton Road, Paignton, TQ4 7QL (1 component)

New Build CMU comprising of battery storage and associated plant

Active • 2025-26 (T-4)
Wright Street, Paisley, Renfrew, PA4 8AN (1 component)

Battery Energy Storage, 49.990 MW installed for a 2hr system.

Active • 2028-29 (T-4)
10.47 MW
Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH. (1 component)

The CMU component consist of Li-ion (or equivalent) Battery Storage and Inverter units to be installed on designated land at Worset Lane, Whelley Hill Farm, Hart, Hartlepool, TS27 3BH.

Active • 2027-28 (T-4)
5.54 MW
Worset Lane Hartlepool TS27 3BL (1 component)

The CMU is a PV+Storage DC coupled plant with one single interconnection point with an interconnection capacity of 37.5 MWac. Storage unit (the one participating to the pre-qualification procedure) has …

Active • 2025-26 (T-4)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (5 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
• Two hour duration battery storage (2)
• Two duration battery storage
Active • 2028-29 (T-4), 2027-28 (T-4) ...
28.56 MW
Withy Place, Bramley Road, Silchester, Reading, RG7 2LN (1 component)

A 50MW Distribution Connected Battery Energy Storage System

Active • 2028-29 (T-4)
10.47 MW
Wise Warren Farm, Warren Lane, Tadcaster, LS24 9NU (1 component)

A new-build energy storage site

Active • 2027-28 (T-4)
4.31 MW
Wisbech St Mary Sports & Community Centre Limited, Playing Field, Beechings Close, Wisbech St Mary, Wisbech, PE13 4SS (1 component)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

Active • 2028-29 (T-4)
0.05 MW
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
• Existing CMU comprising of battery storage and associated plant (2)
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.31 MW
Widow Hill, Balderstone Lane, Burnley, BB10 2TA (1 component)

70MW BESS installation made up of 38 units of 4MW batteries - resulting in a storage capacity of >2 hours.

Active • 2027-28 (T-4)
10.77 MW
Whitelee Windfarm Extension, East Ayrshire, KA16 9LE (1 component)

1 x 50MW Lithium-ion battery with duration of 1 hour

Active • 2026-27 (T-4)
5.91 MW
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (3)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Whelley Hill Farm Battery Storage Scheme, Worset Lane, Hart, Hartlepool, TS27 3BH. (1 component)

A 4.8MW Battery Energy Storage System.

Inactive • 2021-22 (T-4)
Whaddon Farm, Hilperton, Wiltshire, BA14 6NR. (4 components)
• New build generating CMU component - solar photovoltaic park known as Whaddon Farm Solar Park. (2)
• New build generating CMU component - Whaddon Farm BESS
Active • 2027-28 (T-4), 2024-25 (T-1)
1.99 MW
West Thorpe, Willoughby-on-the-wold, LE12 6TD (3 components)

New build one-hour duration storage to replace diesel plant (3)

Active • 2025-26 (T-4), 2024-25 (T-1) ...
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.03 MW