Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT

An 87.500 MW New Build Battery Storage Site Component

KILMARNOCK FLEXPOWER LTD CMU: KMS28A Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 13.80 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land east of Nailcote Farm, Burton Green, Berkswell, Coventry, CV7 7DE

49.9MW lithium ion battery energy storage located at Berkswell near Coventry

COVENTRY ENERGY STORAGE LIMITED CMU: Nail28 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 7.87 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Richborough Energy Park, Ramsgate Road, Sandwich, England CT13 9NL

New Build Battery Energy Storage System

SHEAF ENERGY LIMITED CMU: SEL1T4 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 27.37 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER

A 120.000 MW / 180.000 MWh battery energy storage system

ENSO GREEN HOLDINGS A LIMITED CMU: WSB001 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 18.92 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Atcost Road, Barking Riverside, London, England, IG11 0EQ

Battery energy storage system

O&G SOLAR (SPV 52) LIMITED CMU: Bark00 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 12.87 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Kilwinning, North Ayrshire, Scotland, KA13 7RU, United Kingdom

Battery energy storage system

BENTHEAD SOLAR LIMITED CMU: Bent00 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 4.71 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH

A 100.000 MW / 150.000 MWh battery energy storage system

WALPOLE GREEN LIMITED CMU: WALPOL Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 15.77 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land to the south of Ashton Hall Farm, Tontine Road, Up Holland, Lancashire, WN8 0NF

Battery energy storage project

CORIOLIS ENERGY STORAGE LIMITED CMU: Orrell Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 11.04 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Blackford, Aberdeenshire, AB51 8YN

A 50MW New Build Battery Storage Site

ROTHIENORMAN FLEXPOWER LTD CMU: ROTH28 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 7.89 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land north of Coxmoor Wood, off Crondall Road, Crookham Village, Fleet, GU51 5SU

A 47.500 MW / 71.250 MWh battery energy storage system

FLEET GREEN LIMITED CMU: FLEE02 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 7.49 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT

An 87.500 MW New Build Battery Storage Site Component.

KILMARNOCK FLEXPOWER LTD CMU: KMS28B Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 13.80 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT

An 87.500 MW New Build Battery Storage Site Component

KILMARNOCK FLEXPOWER LTD CMU: KMS28C Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 13.80 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Camsiscan Farm, Craigie, South Ayrshire, Scotland, KA1 5JT

An 87.500 MW Battery Storage Site Component.

KILMARNOCK FLEXPOWER LTD CMU: KMS28D Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 13.80 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
1 Barnett Wood Lane, Surrey, KT21 2BU

98 MW BESS

EKU ENERGY PROJECTS (UK) LIMITED CMU: LEATH1 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 15.46 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land West of Honiley Road (A4177), Honiley, Kenilworth, CV35 7LY

A 57.000 MW / 85.500 MWh battery energy storage system

ENSO GREEN HOLDINGS P LIMITED CMU: BEHR02 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 8.99 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Minchens Lane Bramley RG7 2NL

A 57.000 MW / 85.500 MWh battery energy storage system

BRAMLEY SOLAR LIMITED CMU: BRS001 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 8.99 MW 2028-29 (T-4) Four Year Ahead Capacity Auction
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD

Battery Project on Greenfield Site

SIZING JOHN LIMITED CMU: VAR007 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 9.85 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY

247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.

CARLTON ENERGY NO: 3 LIMITED CMU: TRBES3 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 28.51 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY

247.5 MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.

CARLTON ENERGY NO: 1 LIMITED CMU: TRBES1 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 28.51 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF.

25MW Lithium-ion Energy Storage System

WALPOLE GREEN LIMITED CMU: WALPOL Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 2.88 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF.

99.9MW Lithium-ion Energy Storage System

WALPOLE GREEN LIMITED CMU: WALPOL Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 11.51 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF.

99.9MW Lithium-ion Energy Storage System

WALPOLE GREEN LIMITED CMU: WALPOL Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 11.51 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
French's Road, Model Farm, Walpole, Walpole Marsh, King's Lynn and West, PE14 7JF.

25MW Lithium-ion Energy Storage System

WALPOLE GREEN LIMITED CMU: WALPOL Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 2.88 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
LAND SOUTH OF GUNTHORPE ROAD, WALPOLE MARSH, WISBECH, NEAR PE14 7JH

A 100.000 MW / 150.000 MWh battery energy storage system

WALPOLE GREEN LIMITED CMU: WALPOL Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 11.52 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY

247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.

CARLTON ENERGY NO: 2 LIMITED CMU: TRBES2 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 28.51 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
via entrance at 132 Manchester Road, Carrington, Manchester, M31 4AY

247.5MW capacity system with 520MWh of batteries with all ancillary equipment to be installed on the Trafford Site.

CARLTON ENERGY NO: 4 LIMITED CMU: TRBES4 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 28.51 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD

Battery Project on Greenfield Site

SIZING JOHN LIMITED CMU: VAR006 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 6.57 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land to the East of Bumble Bee Farm Gainsborough Road (A620) Saundby DN22 9ER

A 110.000 MW / 165.000 MWh battery energy storage system

ENSO GREEN HOLDINGS LIMITED CMU: WESB02 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 12.67 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land 75 metres southeast of Camas House Fairways Business Park Inverness, IV2 6AA

Battery energy storage facility comprising access track, compound of battery & electrical equipment, meter building, stores, fencing, security cameras, and associated landscaping

ICT BATTERY STORAGE LIMITED CMU: FAI001 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 4.78 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Richborough Energy Park, Ramsgate Road, Sandwich, CT13 9NL

Battery Energy Storage

HARRINGTON FRANKLIN LIMITED CMU: HFL001 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 4.78 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land at Hydes Lane, Hinckley, LE10 3DP

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

BALANCE POWER PROJECTS LIMITED CMU: HINC27 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 5.70 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land South West of Indian Queens Sub-station, St Dennis, St Austell, Cornwall PL26 8BY

47.5MW capacity system with 95MWh of batteries with all ancillary equipment to be installed on the Indian Queens site.

SAMBAR POWER LIMITED CMU: IQBES1 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 5.47 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Craigie, South Ayrshire, Scotland, KA1 5JT

A 175MW New Build Battery Storage Site Component

KILMARNOCK FLEXPOWER LTD CMU: KIL27A Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 20.16 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Craigie, South Ayrshire, Scotland, KA1 5JT

A 175MW New Build Battery Storage Site Component

KILMARNOCK FLEXPOWER LTD CMU: KIL27B Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 20.16 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Lower Langage Farm, Kingsway, Plympton Plymouth PL7 5AW

Battery Storage system to be installed at Langage Solar Park

LANGAGE SOLAR PARK LIMITED CMU: LSBES1 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 0.58 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Scottswood Road, Newcastle Upon Tyne, NE15 8SF

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

BALANCE POWER PROJECTS LIMITED CMU: NEWB27 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 5.75 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land south of Southlands Cottages Runwell Road Runwell Wickford Essex SS11 7QH

A 47.500 MW / 71.250 MWh battery energy storage system

ENSO GREEN HOLDINGS LIMITED CMU: RASL02 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 5.47 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Blackford, Aberdeenshire, AB51 8YN

A 50MW New Build Battery Storage Site

ROTHIENORMAN FLEXPOWER LTD CMU: ROTH27 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 5.76 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land Next To Bojea Farm, St Austell, PL25 5RU

A New Build Distribution Connected Battery Energy Storage System.

BALANCE POWER PROJECTS LIMITED CMU: STAU27 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 5.70 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
South Pargillis, Clockluine Road, Hillend, Dunfermline, KY11 7HS

Battery storage station

ALKANE ENERGY UK LIMITED CMU: A1BALB Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 4.84 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Kearsley Road, Cinder Hill, Ringley, Bolton, Greater Manchester, M26 1AH

Battery storage station

ALKANE ENERGY UK LIMITED CMU: A1SHOR Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 0.81 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF

Battery Storage Station

ALKANE ENERGY UK LIMITED CMU: A2BROD Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 1.15 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Unit 1b, Britannia Industrial Estate, Union Road, Bolton, BL2 2HP

Battery Storage Station

ALKANE ENERGY UK LIMITED CMU: A3UNON Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 0.58 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land to the west of Pound Road, Axminster EX135UP

A 120.000 MW / 180.000 MWh battery energy storage system

ENSO GREEN HOLDINGS LIMITED CMU: AXMI02 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 13.82 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land 260m to the southwest of Alness Grid Sub Station, Mid Balnacraig, Alness, Highlands, Scotland IV17 0YA

Standalone Battery Storage on greenfield land near Alness substation

BALNACRAIG BATTERY STORAGE LIMITED CMU: BAL001 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 4.78 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Minchens Lane Bramley RG7 2NL

A 57.000 MW / 85.500 MWh battery energy storage system

ENSO GREEN HOLDINGS LIMITED CMU: BRFR01 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 6.57 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land to the south of Church Farm, Somersham, IP8 4PN and land to the east of The Channel, Burstall, IP8 4JL

A 57.000 MW / 85.500 MWh battery energy storage system

ENSO GREEN HOLDINGS LIMITED CMU: BRAF02 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 6.57 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Draycott Cross Road, Cheadle, ST10 1PN

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

BALANCE POWER PROJECTS LIMITED CMU: CHEA27 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 4.61 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
McQuittiston Farm, A70, Ochiltree, East Ayrshire, Scotland, KA6 6NF

The CMU comprises lithium ion batteries housed in ISO containers with additional containers used to house the converters

BALANCE POWER PROJECTS LIMITED CMU: COYL27 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 3.45 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land to the back of Kingdom Advance Network, Hawkins Ln, Burton-on-Trent DE14 1EJ

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 1.5 hours

FPC ELECTRIC LAND LIMITED CMU: EL0076 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 2.88 MW 2027-28 (T-4) Four Year Ahead Capacity Auction