Capacity Market Search

Showing components with technology: Storage (Duration 1.5h)

Displaying items 101 - 147 of 147 matching components (Page 3 of 3)

Component Results (147)

Bumpers Farm, Ilmer Lane, Ilmer, Buckinghamshire, HP27 9RE

New 49.5MW Battery Energy Storage system

HARMONY BF2 LIMITED CMU: HBF222 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land adjacent to Wakefield B Substation Doncaster Road Wakefield WF1 5DB

New 99.9 MW Battery Energy Storage system

HARMONY CAS LIMITED CMU: HWF122 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP,

This is a 20MW battery storage facility connected at 33kV.

HAWKERS HILL ENERGY PARK LIMITED CMU: HHEPT4 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW

A new build 19MW battery energy storage system

HARMONY JF LIMITED CMU: HJF221 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Rusholme Grange, Drax, YO8 8PW

New build 35MW Battery Energy Storage System

HARMONY RH LTD CMU: HRHL22 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Potman's Lane, Battle, TN33 9BL

A Battery Energy Storage System

BRK 002 Limited CMU: POT1h5 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Oaks Business Park, Oaks Lane, Barnsley, S71 1HT

A 45MWh New Build Battery Storage site

STAIRFOOT GENERATION LTD CMU: FOOT21 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
The Manorway, Stanford-leHope, SS17 9LL

A Battery Energy Storage System

CORPOWER LIMITED CMU: CBT21B Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Redditch Generation Station, Windsor Road, Redditch, B97 6HE

Battery Storage Station

ALKANE ENERGY UK LIMITED CMU: A2REDT Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land at West Road, Trafford Park, M41 7SW

Battery Storage Station

ALKANE ENERGY UK LIMITED CMU: A2TAYL Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land at West Road, Trafford Park, M41 7SW

Battery Storage Station

ALKANE ENERGY UK LIMITED CMU: TAYL24 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 3.25 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Blandford Road, Poole, BH16 6AB

A 25 MW Battery Storage Site

EQUINOR BLANDFORD ROAD LIMITED CMU: BFRD25 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 5.08 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS

49.5MW Battery Energy Storage facility

HARMONY (PW) 2 LIMITED CMU: PWS222 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

CAPBAL (BRACO) LIMITED CMU: BRAC24 Storage (Duration 1.5h) CMU De-Rated N/A CMU DB: 2.03 MW 2025-26 (T-1) One Year Ahead Capacity Auction
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB

A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.

GRIDSOURCE (WOBURN RD) LIMITED CMU: WBN001 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ

49.5 MW Battery Energy Storage facility

HARMONY CF LIMITED CMU: CHAP22 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Clay Tye Road, Upminister, RM14 3PL

49.5MW Battery Energy Storage facility connected to 132kv network

HARMONY CTF 2 LIMITED CMU: CTF222 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Little Raith Farm, Auchtertool, Fife, KY5 0AX

49.5MW Battery Energy Storage facility

HEIT LR LIMITED CMU: LITT22 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW

A new build 30MW battery energy storage system

HARMONY JF LIMITED CMU: JFIE21 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB

A 49.5MW battery energy storage system

HARMONY (PW) LIMITED CMU: PILL21 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU

A new build 11MW battery storage system

HARMONY BD LIMITED CMU: BROA21 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE

A new build 49.5MW battery energy storage system

HEIT BF LIMITED CMU: BUMP21 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL

A new build 49.5MW battery energy storage system

HARMONY CTF LIMITED CMU: CLAY21 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU

A new build 20MW battery energy storage system

HARMONY FM LIMITED CMU: FARN21 Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Portman Power Limited CMU: FEEDER Storage (Duration 1.5h) CMU De-Rated N/A 2025-26 (T-4) Four Year Ahead Capacity Auction
Bore Tree Baulk, Grimston, Dunnington, York,YO19 5HE

New build battery storage

UK BATTERY STORAGE LTD CMU: York24 Storage (Duration 1.5h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Orchardbank Battery Storage, Orchard Loan, Oilfield Machinery Ltd, Orchardbank Industrial Estate, Forfar, DD8 1TD

This is a New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

CAPBAL (FORFAR) LIMITED CMU: FORF24 Storage (Duration 1.5h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Blandford Road, Poole, BH16 6AB

A 25MW Battery Storage Site

EQUINOR BLANDFORD ROAD LIMITED CMU: BFRD24 Storage (Duration 1.5h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Feddal Battery Storage, Land located at Feddal Estate, Braco, Dunblane, Perthshire FK15 9RA

New Build 9.999MW capacity, 20MWh (2hr) LiFePO4 battery energy storage system (BESS).

CAPBAL (BRACO) LIMITED CMU: BRAC24 Storage (Duration 1.5h) CMU De-Rated N/A 2024-25 (T-1) One Year Ahead Capacity Auction
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN002 Storage (Duration 1.5h) CMU De-Rated N/A 2024-25 (T-4) Four Year Ahead Capacity Auction
Bore Tree Baulk, Grimston, Dunnington, York,YO19 5HE

New build battery storage

UK BATTERY STORAGE LTD CMU: York23 Storage (Duration 1.5h) CMU De-Rated N/A 2023-24 (T-1) One Year Ahead Capacity Auction
Unit 2, Sentinel House, Enigma Business Park, WR14 1GL

Battery Energy Storage System

ARENKO CLEANTECH LIMITED CMU: AS0145 Storage (Duration 1.5h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
The Phoenix Centre, Beaumont Road, Banbury, OX16 1RH

Battery Energy Storage System

ARENKO CLEANTECH LIMITED CMU: AS0214 Storage (Duration 1.5h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB

A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity.

GRIDSOURCE (WOBURN RD) LIMITED CMU: WBN001 Storage (Duration 1.5h) CMU De-Rated N/A 2022-23 (T-1) One Year Ahead Capacity Auction
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN002 Storage (Duration 1.5h) CMU De-Rated N/A 2022-23 (T-1) One Year Ahead Capacity Auction
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Portman Power Limited CMU: FEEDER Storage (Duration 1.5h) CMU De-Rated N/A 2022-23 (T-1) One Year Ahead Capacity Auction
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN002 Storage (Duration 1.5h) CMU De-Rated N/A 2021-22 (T-1) One Year Ahead Capacity Auction
Unit 5, The Bloxwich Lane Estate, Walsall, WS2 8TF

Battery Energy Storage System

ARENKO CLEANTECH LIMITED CMU: AS0006 Storage (Duration 1.5h) CMU De-Rated N/A 2019-20 (T-1) One Year Ahead Capacity Auction