Capacity Market Search

Showing components with technology: Storage (Duration 1h)

Displaying items 651 - 700 of 799 matching components (Page 14 of 16)

Component Results (799)

NORWICH ROAD INDUSTRIAL ESTATE, HALESWORTH, SUFFOLK, IP19 8QJ

The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of 40 MVA and export capacity of 40 MW.

RNK Holding Ltd CMU: RNKHAL Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
19 Howard Road, Park Farm Industrial Estate, Redditch, Worcestershire, B98 7SE

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have an import capacity of 4000kVa and an export capacity …

RNK Holding Ltd CMU: RNKIPS Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
LAND AT TOLLGATE FARM, WELHAM GREEN, AL4 0NY

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 MVA and export capacity of 49.5 MW.

RNK Holding Ltd CMU: RNKTOL Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Potmans Lane, Battle, TN33 9BL

A Battery Energy Storage System

BRK 002 Limited CMU: SUS001 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Potmans Lane, Battle, TN33 9BL

A Battery Energy Storage System

BRK 002 Limited CMU: SUS002 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Potmans Lane, Battle, TN33 9BL

A Battery Energy Storage System

BRK 002 Limited CMU: SUS003 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Spitfire Way, Wholeflats, Grangemouth FK3 9UB Note: This is the same location as SWGAS3. However, this site will be split, with independent connections, companies and planning permissions. We have uploaded a map to show exact location.

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV.

SpectrumReserve6 Ltd. CMU: SWBS19 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD

A new Build Generating Storage CMU

GH ESS7 LIMITED CMU: TH2C19 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD

A new Build Generating Storage CMU

GH ESS7 LIMITED CMU: TH2S19 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Green Ln, Thurcroft, Wickersley, Rotherham, UK, S66 9JD

A new Build Generating Storage CMU

HC ESS7 LIMITED CMU: TH5S19 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH

A 50MW New Build Battery Storage site

EQUINOR WELKIN MILL LIMITED CMU: WELK19 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
The Common, Malmesbury, Wiltshire, SN16 9RJ

A Battery Energy Storage System.

BRK 001 Limited CMU: WIL002 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
The Common, Malmesbury, Wiltshire, SN16 9RJ

A Battery Energy Storage System.

BRK 001 Limited CMU: WIL003 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
The Common, Malmesbury, Wiltshire, SN16 9RJ

A Battery Energy Storage System.

BRK 001 Limited CMU: WIL004 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Ardochrig Substation, off Ardochrig Road, Whitelee Windfarm, South Lanarkshire, G75 0QN

1 x 50MW Lithium-ion batteryw with duration of 1 hour

SCOTTISHPOWER RENEWABLES (UK) LIMITED CMU: WLBAT1 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Albion Road, Dartford, Kent, UK, DA1 5PZ

A 2.5MW New Build Battery Storage System

HC ESS2 LIMITED CMU: ALPHA3 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Albion Road, Dartford, Kent, UK, DA1 5PZ

A New Build Generation Battery Site

HC ESS2 LIMITED CMU: ALPHA3 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Hulley Road Macclesfield Cheshire SK10 2LP

20.000 MW of battery storage located at Macclesfield

Hulley Road Energy Storage Limited CMU: ANBHU1 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Lascar Works, Tanpits Road, Bury BL9 5BY

20.000 MW of battery storage located at Lascar Works

LASCAR BATTERY STORAGE LIMITED CMU: ANBLA1 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT

1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.

PORTH WEN SOLAR LIMITED CMU: ANGL01 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Gipsy Lane, A664, Rochdale, OL11 3AE

10 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in …

ARL 001 Limited CMU: AR0011 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Gipsy Lane, A664, Rochdale, OL11 3AE

8 x 1mw Battery Storage units to be installed on designated land at Gipsy Lane - Connection offer is for 18mw which is split between CMUs - further detail in …

ARL 001 Limited CMU: AR0012 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Crossways, Greenhithe, DA9 9BB

7 x 1.2 mw Battery Storage units to be installed on designated land at Crossways

ARL 002 Limited CMU: AR0021 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map.

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

GRIDRESERVE LTD CMU: BBBS11 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-3) Three Year Ahead Capacity Auction
Church Bottom, Salisbury, SP4 6NN

10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in …

ARL 008 Limited CMU: AR0082 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Church Bottom, Salisbury, SP4 6NN

19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in …

ARL 008 Limited CMU: AR0083 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Petts Wood, Eynsford Close, Orpington, BR5 1DP

7 x 1mw Battery Storage units to be installed on designated land at Petts Wood

ARL 016 LIMITED CMU: AR0161 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Back Lane, Chesterfield, S44 5XQ

10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in …

ARL 027 Limited CMU: AR0271 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Back Lane, Chesterfield, S44 5XQ

5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in …

ARL 027 Limited CMU: AR0272 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Back Lane, Chesterfield, S44 5XQ

5 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for 20mw which is split between CMUs - further detail in …

ARL 027 Limited CMU: AR0273 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

FISHCROSS BATTERY STORAGE LIMITED CMU: BANKH5 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
The Common, Malmesbury, Wiltshire, SN16 9RJ

20 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in …

BRK 001 Limited CMU: BR0011 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
The Common, Malmesbury, Wiltshire, SN16 9RJ

10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in …

BRK 001 Limited CMU: BR0012 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
The Common, Malmesbury, Wiltshire, SN16 9RJ

19 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for 49.9mw which is split between CMUs - further detail in …

BRK 001 Limited CMU: BR0013 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Land to the North of Bransholme Rd, Hull HU7 4YP, UK

The CMU component at the Bransholme Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

NORTH EAST GRID STORAGE TWO LTD CMU: BRANSH Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Land at Weirs Drove, Cambridge, CB25 0BP

The CMU component at the Burwell Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 49.900MW each.

East Anglia Grid Storage One Limited CMU: BURWEL Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Site 300 metres South West of Shilton Cottage, Old Greenock Road, Bishopton, PA7 5NS

Erection of up to 16 shipping containers measuring around 16.2m x 3m x 3m electricity storage facility housing lithium-ion battery storage units, ancillary equipment and substation building. Substation building includes; …

Muirhall Energy Limited CMU: EKFL11 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Land at Traston Road, Newport NP19 4PW

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

FPC INDUSTRY & ENTERPRISE 2 LIMITED CMU: EL0001 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY

10MW battery energy storage facility at Upton Lane, Rownhams

GBSL NURSLING LIMITED CMU: GB2N18 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …

GHEB2 A1 Limited CMU: GRA019 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

GHEB2 C6 LIMITED CMU: GRA596 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …

GHEB2 B1 LIMITED CMU: GRBRE2 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

GHEB2 C3 Limited CMU: GRCAT1 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Russell Farm, Hursley, Winchester SO21 2UZ

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …

GHEB2 C2 Limited CMU: GRRUS1 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD

Lithium Ion battery storage system capable of importing, storing and exporting electricity.

HILLHOUSE BATTERY STORAGE LIMITED CMU: HILLH2 Storage (Duration 1h) CMU De-Rated N/A 2022-23 (T-4) Four Year Ahead Capacity Auction