Displaying items 51 - 100 of 799 matching components (Page 2 of 16)
4MW battery co-located with a solar farm
Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing …
Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …
A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt
6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt
30MW/30MWh one hour battery storage asset located near BURWB1 asset
A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.
Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …
CMU comprising of battery storage and associated plant
The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.
10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire
Existing 25 MW storage site using Lithium Ion Batteries
A New Build Battery Storage site
99.4MW / 99.4MWh BESS
30MW/30MWh one hour battery
A Battery Energy Storage System
7 MW of Battery Storage located at Grantham.
40MW/40MWh BESS
electricity storage site comprising brand new batteries, inverters and associated connection plant
50MW/50MWh BESS
49.9MW/49.9MWh BESS located on land east of North Road, Inverkeithing
Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of …
1 x 30MW Lithium-ion battery with duration of 1 hour
CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the …
29.9MW/29.9MWh one hour battery
30MW/30MWh one hour battery
Battery Storage Station
Battery Storage
1.200 MW battery storage
1.200MW BESS
50MW/50MWh one hour battery
The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 …
6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt
40MW OF BATTERY ENERGY STORAGE SYSTEMS
6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt
The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The …
The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.
Battery Storage
New build one-hour duration storage to replace diesel plant
New build one-hour duration storage to replace diesel plant
New build one-hour duration storage to replace diesel plant
New build one-hour duration storage to replace diesel plant
17.615 MW installed capacity Battery Storage facility
49MW/49MWh BESS
Battery Storage
Battery Storage Station
Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …
Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the …
Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …
Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …