Capacity Market Search

Showing components with technology: Storage (Duration 1h)

Displaying items 51 - 100 of 799 matching components (Page 2 of 16)

Dairy Lane Westhamnett Chichester PO20 2BG

4MW battery co-located with a solar farm

E.ON UK PLC CMU: DSR012 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.31 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP

Battery storage located at Larport Farm, Larport Lane, Dormington, Hereford, HR1 4EP with a nameplate capacity of 19.500 MW. Connection capacity is calculated as the Average Output of the Existing …

GSES 1 LIMITED CMU: AGLAR2 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.98 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Land North of Clayhill Farm, Westoning MK45 5JD

Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

SSE ENERGY SUPPLY LIMITED CMU: WESTON Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.05 MW 2027-28 (T-4) Four Year Ahead Capacity Auction
Gatwick Electric Forecourt Buckingham Gate Gatwick RH6 0NT

A 6.000MW Battery Energy Storage System to be installed at Gatwick Electric Forecourt

GATWICK ELECTRIC FORECOURT LTD CMU: GSEF03 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.71 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Norwich East Electric Forecourt Broadland Gate Norwich NR13 5HB

6.000MW Battery Energy Storage System to be installed at Norwich East Electric Forecourt

NORWICH EAST ELECTRIC FORECOURT LTD CMU: GSEF02 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.71 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land North West Of Electricity Sub-Station Weirs Drove Burwell CB25 0BP

30MW/30MWh one hour battery storage asset located near BURWB1 asset

CARE POWER (BURWELL 1) LIMITED CMU: BURWB1 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 3.54 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Silver Spinney Farm, Wicken Road, Wicken, MK19 6BS

A 5MW - 7.5MWh containerised Energy Storage System to be installed on designated land adjacent to an existing 11kV distribution substation at Silver Spinney Farm, Wicken.

THRIVE RENEWABLES (WICKEN) LIMITED CMU: WKN002 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.57 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land North of Clayhill Farm, Westoning MK45 5JD

Battery storage located at Land North of Clayhill Farm, Westoning MK45 5JD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

SSE ENERGY SUPPLY LIMITED CMU: WESTON Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.10 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Greenfield Road, Clayhill Farm, Westoning, Bedford, MK45 5JD

CMU comprising of battery storage and associated plant

SSE ENERGY SUPPLY LIMITED CMU: WESTON Storage (Duration 1h) CMU De-Rated N/A CMU DB: 4.72 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Adjacent To St Philip's Marsh Depot, Land Off, Feeder Road, Bristol, BS2 0TH

The CMU will be an energy storage system comprised of batteries and will have import and export capacity of 20.000MW each.

Portman Power Limited CMU: FEEDER Storage (Duration 1h) CMU De-Rated N/A CMU DB: 2.36 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Stockbridge Storage Farm, Land Adjacent to B3049, Stockbridge Road, Winchester.SO22 5FP

10.0MW Battery Storage facility located at Stockbridge Road, Winchester, Hampshire

SUSI EELPOWER WINCHESTER LIMITED CMU: WINP18 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 1.18 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom

Existing 25 MW storage site using Lithium Ion Batteries

TYNEMOUTH BATTERY STORAGE LIMITED CMU: ENEL01 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 2.83 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land off, Old School, Lane Hereford, HR4 9BP

A New Build Battery Storage site

NORIKER PERSEVERANCE LTD CMU: PERSB3 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 1.65 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Danks Wy, Golds Hill, West Bromwich, Tipton, DY4 7BT

99.4MW / 99.4MWh BESS

OCKER HILL BESS LIMITED CMU: OCKH02 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 11.74 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW

A Battery Energy Storage System

ADV 004 LIMITED CMU: NG261H Storage (Duration 1h) CMU De-Rated N/A CMU DB: 17.72 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER

7 MW of Battery Storage located at Grantham.

ESB SOLAR (NORTHERN IRELAND) LIMITED CMU: MLFM-1 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.83 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Lebanon Farm, Lower Dunton Road, Dunton, Brentwood, RM14 3TD

40MW/40MWh BESS

BLUESTONE ENERGY LTD CMU: LEBA01 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 4.72 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Leafield Battery Site, Monks Lane, Corsham SN13 9PH

electricity storage site comprising brand new batteries, inverters and associated connection plant

LEAFIELD ENERGY LIMITED CMU: LEA221 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 2.36 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Laighpark WWTW, Abercorn St, Paisley, PA3 4DF

50MW/50MWh BESS

BLUESTONE ENERGY LTD CMU: LAIG01 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 5.91 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
STOR Field 9, North Road, Inverkeithing, Fife, KY11 1HT

49.9MW/49.9MWh BESS located on land east of North Road, Inverkeithing

EKU ENERGY PROJECTS (UK) LIMITED CMU: INVE02 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 5.89 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH (alternative post code DD2 5JW)

Standalone battery energy storage project located at West Gourdie Battery Generating Station, Former Texol Factory Unit, Myerkirk Road, West Gourdie Industrial Estate, Dundee, DD2 4UH. The site will comprise of …

FS WEST GOURDIE LIMITED CMU: FSWG26 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 3.54 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Dersalloch Windfarm, Ayr, KA6 7JJ

1 x 30MW Lithium-ion battery with duration of 1 hour

SCOTTISHPOWER RENEWABLES (UK) LIMITED CMU: DERSA2 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 3.54 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection)

CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the …

DRIFFIELD SOLAR AND STORAGE LIMITED CMU: DFD001 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 3.46 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
A89, Deans, West Lothian, Scotland, EH54 8TB, United Kingdom

29.9MW/29.9MWh one hour battery

CARE POWER (DRUMCROSS) LIMITED CMU: DRUMB1 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 3.53 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Craigton Interchange, Linburn, Bishopton, Renfrewshire, Scotland, PA7 5NT, United Kingdom

30MW/30MWh one hour battery

CARE POWER (ERSKINE) LIMITED CMU: ERSKB1 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 3.54 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at West Road, Trafford Park, M41 7SW

Battery Storage Station

ALKANE ENERGY UK LIMITED CMU: A3TAYL Storage (Duration 1h) CMU De-Rated N/A CMU DB: 1.89 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Newchurch Road, Bacup, Lancashire, OL13 0BL

Battery Storage

BOOM BACUP STORAGE LIMITED CMU: BACUP1 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.95 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Knottingley Hydropower Station Brotherton Weir Knottingley West Yorkshire WF11 8HR

1.200 MW battery storage

LIMEJUMP LTD CMU: BAT203 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.14 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Thrybergh Weir Kilnhurt Mexborough South Yorkshire S64 5TJ

1.200MW BESS

LIMEJUMP LTD CMU: BAT203 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.14 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB.

The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of 49.5MW. Battery capacity will be reduced to 38.5MWh after 15 …

CUXTON ENERGY STORAGE LIMITED CMU: CUX001 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 4.55 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Gateshead Electric Forecourt Park Road Felling by-pass Gateshead NE10 0EA

6.000MW Battery Energy Storage System to be installed at Gateshead Electric Forecourt

GATESHEAD ELECTRIC FORECOURT LTD CMU: GSEF05 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.71 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Stroud Green Lane Add Cap - Battery, Fareham PO14 2HS

40MW OF BATTERY ENERGY STORAGE SYSTEMS

FAREHAM ENERGY RESERVE LIMITED CMU: FAR123 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 4.72 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Stevenage Electric Forecourt Knebworth Stevenage SG1 2AX

6.000MW Battery Energy Storage System to be installed at Stevenage Electric Forecourt

STEVENAGE ELECTRIC FORECOURT LTD CMU: GSEF04 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.71 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land North East of Eastfield Farm, Hutton Cranswick, East Riding of Yorkshire YO25 9RB (address in planning application) Scurf Dyke Farm, Cranswick, YO25 9RD (address of grid connection point)

The CMU is a 52MW/52MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV plant, and shares a grid connection, but is separately metered. The …

FP LUX SCURF DYKE SOLAR LIMITED CMU: SCU002 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 5.78 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Tollgate Farm, Welham Green, Hertfordshire, AL4 0NY

The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity of 49.5MVA.

TOLLGATE ENERGY STORAGE LIMITED CMU: TOL001 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 4.55 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Great Field Lane, Somerden Road, Hull, HU9 5QJ

New build one-hour duration storage to replace diesel plant

PULSE CLEAN ENERGY UK LIMITED CMU: BATT07 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 1.77 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Duncombe Road, Girlington, Bradford, BD8 9AL

New build one-hour duration storage to replace diesel plant

PULSE CLEAN ENERGY UK LIMITED CMU: BATT08 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 1.18 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Plot, Pengarnodu Est, Methyr Tydfil, CF48 2YE

New build one-hour duration storage to replace diesel plant

PULSE CLEAN ENERGY UK LIMITED CMU: BATT04 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 1.42 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Faraday Road, Plymouth, PL4 0SR

New build one-hour duration storage to replace diesel plant

PULSE CLEAN ENERGY UK LIMITED CMU: BATT06 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 1.89 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land To The South Of Rock Farm, Rocks Green, Ludlow, SY8 2DS

17.615 MW installed capacity Battery Storage facility

SUSI EELPOWER ROCK FARM LIMITED CMU: ROCK25 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 2.08 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Dougliehill WWTW, Port Glasgow, Inverclyde, PA15 2PB

49MW/49MWh BESS

BLUESTONE ENERGY LTD CMU: DOUG01 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 5.79 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Brodsworth Energy Park, Long Lands Lane, Brodsworth, Doncaster, DN6 7FF

Battery Storage Station

ALKANE ENERGY UK LIMITED CMU: A1BROD Storage (Duration 1h) CMU De-Rated N/A CMU DB: 2.36 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

GSES 1 LIMITED CMU: ANC1A1 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.10 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD

Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the …

GSES 1 LIMITED CMU: ANC1A1 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.10 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Hungerford Farm, Winchfield, Hook, RG27 8SW

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU …

GSES 1 LIMITED CMU: ANC1A1 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.10 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD

Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing …

GSES 1 LIMITED CMU: ANC1A1 Storage (Duration 1h) CMU De-Rated N/A CMU DB: 0.10 MW 2026-27 (T-4) Four Year Ahead Capacity Auction