Howick Cross Lane, Howick Cross, Penwortham, Hutton, South Ribble, PR1 0NT

Standalone battery energy storage system

PENWORTHAM (BES) LTD CMU: QENER2 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 9.93 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land South Of Marsh Farm Marsh Lane Fobbing Essex SS17 9JW

A 49.400 MW / 98.800 MWh battery energy storage system

ENSO GREEN HOLDINGS LIMITED CMU: RAYL01 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 11.67 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land to the South of Hawkesbury Hall Farm, Parrotts Grove, Coventry, CV2 1NQ

98 MW / 196MWh BESS

BLUESTONE ENERGY LTD CMU: HAWK01 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.16 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPLD22 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 8.98 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
School Lane, Bamford, Norden, Rochdale, Greater Manchester, England, OL11 5UT,

Standalone battery energy storage system

ROCHDALE (BES) LTD "DO NOT USE" CMU: QENER3 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 9.93 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ

Battery energy storage unit

FRP MERCIA HOLDCO 2 LIMITED CMU: FRP2CR Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.47 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ

Battery energy storage unit

FRP MERCIA HOLDCO 2 LIMITED CMU: FRP2CR Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.24 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Barleylands Barleylands Road Billericay Essex CM11 2UD

A 49.400 MW / 98.800 MWh battery energy storage system

ENSO GREEN HOLDINGS LIMITED CMU: RAYL02 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 11.67 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ

Battery energy storage unit

FRP MERCIA HOLDCO 2 LIMITED CMU: FRP2CR Storage (Duration 2h) CMU De-Rated N/A CMU DB: 0.47 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT

New build two-hour duration battery storage

GFV-4 LIMITED CMU: GFV402 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.13 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Plot C, Land at Severn Road Avonmouth BS10 7SE

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Willington Power Limited CMU: WILL_C Storage (Duration 2h) CMU De-Rated N/A CMU DB: 4.73 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ

Battery energy storage unit

FRP MERCIA HOLDCO 2 LIMITED CMU: FRP2CR Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.36 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ

Battery energy storage unit

FRP MERCIA HOLDCO 2 LIMITED CMU: FRP2CR Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.36 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom

A Battery Energy Storage System

HD192RAY LTD CMU: RAYL26 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.58 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land on West of St Michaels Road Widnes, WA8 8TB.

New Build CMU comprising of battery storage and associated plant.

Shell Green Ltd CMU: ETWID1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.26 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ

Battery energy storage unit

FRP MERCIA HOLDCO 2 LIMITED CMU: FRP2CR Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.36 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ

Battery energy storage unit

FRP MERCIA HOLDCO 2 LIMITED CMU: FRP2CR Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.18 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB

Battery energy storage unit

FRP MERCIA HOLDCO 2 LIMITED CMU: FRP2DR Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.36 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPIV22 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.56 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPIQ22 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.09 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land off Bilport Lane, Wednesbury, Ws10 0PD

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

FPC ELECTRIC LAND LIMITED CMU: EL0071 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 17.72 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land off Bilport Lane, Wednesbury, WS10 0PD

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

FPC ELECTRIC LAND LIMITED CMU: EL0072 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 5.91 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Slack Lane, Westhoughton, Bolton BL5 3LG

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

FPC ELECTRIC LAND LIMITED CMU: EL0066 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.36 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land off Fordhouse Lane, Stirchley, Birmingham B30 3AG

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

FPC ELECTRIC LAND LIMITED CMU: EL0067 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 3.31 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Slack Lane, Westhoughton, Bolton BL5 3LG

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

FPC ELECTRIC LAND LIMITED CMU: EL0065 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 4.73 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land off Fordhouse Lane, Stirchley, Birmingham B30 3AG

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

FPC ELECTRIC LAND LIMITED CMU: EL0068 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.42 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

PULSE CLEAN ENERGY SPV CAVENDISH LIMITED CMU: EL0062 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.36 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
35-37 Sheffield Road, Newton, Hyde, SK14 2PU

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

PULSE CLEAN ENERGY SPV BELL LIMITED CMU: EL0063 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.09 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
35-37 Sheffield Road, Newton, Hyde, SK14 2PU

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

PULSE CLEAN ENERGY SPV BELL LIMITED CMU: EL0064 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.84 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

FPC ELECTRIC LAND LIMITED CMU: EL0069 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 17.96 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land off Woburn Road, Kempston, Bedford, MK43 9AB

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

EL ASSET CO. 2 LIMITED CMU: EL0055 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.84 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land to the north of Stoke Lane, Norwich, NR14 8QD

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

FPC ELECTRIC LAND LIMITED CMU: EL0058 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 17.72 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS

Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 6)

EP Eggborough New Energy Developments Limited CMU: EBAT30 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 70.65 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land to the north of Stoke Lane, Norwich, NR14 8QD

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

FLEXION ENERGY SPV 2 LTD CMU: EL0059 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 5.91 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land east of Grahamston Road, Paisley, PA2 7DA

60MW / 120MWh BESS

BLUESTONE ENERGY LTD CMU: DYKB01 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 14.18 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

PULSE CLEAN ENERGY SPV CAVENDISH LIMITED CMU: EL0061 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 4.73 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

FPC ELECTRIC LAND LIMITED CMU: EL0070 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 10.40 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Off Letch Lane, Stockton-on-Tees, TS21 1ED

New Build CMU comprising of battery storage and associated plant.

SIRIUS ECODEV (CALIFORNIA) LIMITED CMU: ETCAL1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 9.45 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ

New Build CMU comprising of battery storage and associated plant

CONRAD (WINCHESTER) LIMITED CMU: CDWIN2 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.69 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Higglers Farm, Titchfield Lane, Wickham, PO17 5PQ

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED CMU: CDWKM1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 9.93 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Haddon Farm, Haddons Lane, Claveshay, North Petherton, Bridgwater, TA6 6PG

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED CMU: CDTHX1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.09 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Calow Green, Calow, S44 5XQ

A Battery Energy Storage System

ADV 005 LIMITED CMU: CG262H Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.61 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Edwin Richards Quarry, Rowley Regis, B65 9DN

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED CMU: CDRWR1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.09 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
New Road, Featherstone, Wolverhampton, WV10 7NS

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED CMU: CDSHL1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 9.93 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land adjacent to Taunton GSP Substation, TA4 1AG

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED CMU: CDTAU1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.09 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel.

RWE GENERATION UK PLC CMU: CHES22 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 3.55 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, SN12 8LT

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED CMU: CDNOC1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 3.59 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Tuxton Farm, Plympton, Plymouth, PL7 5AA

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED CMU: CDPLM1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.08 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land near Ellbridge Lane, Hatt, Saltash, PL12 6PU

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED CMU: CDLDH1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.09 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
The Common, Malmesbury, SN16 9RJ

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED CMU: CDMAL2 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.08 MW 2026-27 (T-4) Four Year Ahead Capacity Auction