Capacity Market Search

Showing components with technology: Storage (Duration 2h)

Displaying items 601 - 650 of 1060 matching components (Page 13 of 22)

Component Results (1060)

Ipswich Road, Cardiff, CF23 9AQ

New build two-hour duration battery storage

GFV-1 LIMITED CMU: GFV104 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.34 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT

New build two-hour duration battery storage

GFV-4 LIMITED CMU: GFV401 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.13 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT

New build two-hour duration battery storage

GFV-4 LIMITED CMU: GFV403 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.03 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land, North of A683 & Heysham substation, Lancaster, Morecambe Bypass, Morecambe, Lancashire.

2H duration Lithium Ion Battery Storage New Build CMU.

MIDDLETON ENERGY STORAGE LIMITED CMU: KA1MID Storage (Duration 2h) CMU De-Rated N/A CMU DB: 47.26 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Leafield Battery Site, Monks Lane, Corsham SN13 9PH

electricity storage site comprising brand new batteries, inverters and associated connection plant

LEAFIELD ENERGY LIMITED CMU: LEA222 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 4.73 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Hams Lane, Lea Marston CP, North Warwickshire, Warwickshire, England, B76 0BL

98MW / 196MWh BESS

BLUESTONE ENERGY LTD CMU: LEAM01 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.16 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Linwood WWTW, Linwood, Paisley, PA3 3DP

60MW/120MWh BESS

BLUESTONE ENERGY LTD CMU: LINW01 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 14.18 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Denmead Farm Edneys Lane Denmead Waterlooville Hampshire PO7 6JN

A 49.400 MW / 98.800 MWh battery energy storage system

ENSO GREEN HOLDINGS LIMITED CMU: LOVE01 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 11.67 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land on the Northwest side of Barnett Wood Lane, Leatherhead, KT21 2BU

98MW / 196MWh BESS

BLUESTONE ENERGY LTD CMU: MERT01 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.16 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Hurst Way, Northorpe, Mirfield, Lower Hopton, WF14 8LX

A new build 40MW/80MWh battery storage facility connected to the Northern Power Distribution network at 33kV, located in Mirfield, West Yorkshire.

MIRFIELD ENERGY STORAGE LTD CMU: MES001 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 9.22 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Tees Dock Road Redcar and Cleveland Tees Valley England TS6 7AB

A new build 100MW/200MWh battery storage facility connected to the Transmission network, located in Teesworks, Redcar

SOUTH TEES ENERGY STORAGE LTD CMU: SES001 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.04 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Mill Hill Substation, Partingdale Road, Barnet, NW7 1NT

A Battery Energy Storage System.

HB333MIL LTD CMU: MIL026 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 13.47 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Somerford Farm, SN16 9RN

A Battery Energy Storage System

PD813ETY LTD CMU: MINE03 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 11.22 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Great Elm Farm, Pond Lane, Charlton, Wiltshire, SN16 9DS

A Battery Energy Storage System

HD381GRE LTD CMU: MINE04 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 11.22 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Fairholme, SN16 9PW

A Battery Energy Storage System.

HB222BRI LTD CMU: MINE05 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 11.22 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS

A Battery Energy Storage System.

PD688IRO LTD CMU: MINE6A Storage (Duration 2h) CMU De-Rated N/A CMU DB: 11.22 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS

A Battery Energy Storage System.

PD688IRO LTD CMU: MINE6B Storage (Duration 2h) CMU De-Rated N/A CMU DB: 11.22 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Netherton Farm, Keith AB55 5PE

200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's

ZENOBE BLACKHILLOCK LIMITED CMU: NBBLK2 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.63 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Netherton Farm, Keith AB55 5PE

200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's

ZENOBE BLACKHILLOCK LIMITED CMU: NBBLK2 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.63 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Eccles Birgham Farm TD12 4LU

400MW battery storage located near to the SPT Eccles substation, split into four BMU's

ZENOBE ECCLES LIMITED CMU: NBECL1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.63 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Eccles Birgham Farm TD12 4LU

400MW battery storage located near to the SPT Eccles substation, split into four BMU's

ZENOBE ECCLES LIMITED CMU: NBECL1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.63 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Eccles Birgham Farm TD12 4LU

400MW battery storage located near to the SPT Eccles substation, split into four BMU's

ZENOBE ECCLES LIMITED CMU: NBECL1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.63 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Eccles Birgham Farm TD12 4LU

400MW battery storage located near to the SPT Eccles substation, split into four BMU's

ZENOBE ECCLES LIMITED CMU: NBECL1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.63 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's

ZENOBE KILMARNOCK SOUTH LIMITED CMU: NBKIS1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.63 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
adjacent to Kilmarnock South Substation KA1 3TN

200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's

ZENOBE KILMARNOCK SOUTH LIMITED CMU: NBKIS1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.63 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
adjacent to National Grid Stalybridge substation SK15 3DA

150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's

Zenobe Stalybridge Limited CMU: NBSTL1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.63 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
adjacent to National Grid Stalybridge substation SK15 3DA

150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's

Zenobe Stalybridge Limited CMU: NBSTL1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 11.82 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Newburn Bridge Road, Peth Lane Farm, Stella, NE21 4NT

2 hour containerised battery storage

CAPELLA BESS LTD CMU: NCAS_1 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 23.58 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Norrington Gate Farm, Norrington Gate, Broughton Gifford, Melksham, SN12 8LW

A Battery Energy Storage System

ADV 004 LIMITED CMU: NG262H Storage (Duration 2h) CMU De-Rated N/A CMU DB: 35.45 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Stobhill Hospital, Fife Way, Balgrayhill, Glasgow, Glasgow City, Scotland, G21 3UW

60MW / 120MWh BESS

BLUESTONE ENERGY LTD CMU: STOB01 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 14.18 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBB22 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 8.03 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

DAMSONGREEN ENERGYFARM LIMITED CMU: PPBF22 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 8.98 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBT22 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 8.98 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP

Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.

Buxton Power Limited CMU: BUXTON Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.20 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Waterswallows Energy Limited CMU: WATERS Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.80 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
South West side of the A444, Castle Gresley, DE11 9ES

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

ENERSYST LIMITED CMU: Castle Storage (Duration 2h) CMU De-Rated N/A CMU DB: 3.13 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land at Sterte Avenue West, Poole, BH15 2AL

A 7.5MW Tesla Battery Energy Storage System

HARMONY HB LIMITED CMU: HHBL20 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 1.77 MW 2026-27 (T-4) Four Year Ahead Capacity Auction
Land 90 Metres South West Of Noahs Ark Old Gallows Road Perth PH1 1QE

2 hours Lithium-In battery storage facility in Scotland connected to the distribution network with a connection capacity of 49.4MW

GLENDEVON ENERGY STORAGE LIMITED CMU: GLEN_2 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 13.41 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Bumpers 1 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE

A battery energy storage system

HEIT BF LIMITED CMU: HBF125 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 12.73 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Bumpers 2 BESS, Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE

A battery energy storage system

HEIT BF LIMITED CMU: HBF225 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 12.73 MW 2025-26 (T-1) One Year Ahead Capacity Auction
LAND TO THE SOUTH OF HAWTHORN PIT SUBSTATION, JADE BUSINESS PARK, MURTON, SR7 9DR

A Lithium Ion Energy Storage System

HEIT HP LIMITED CMU: HHPL25 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 12.83 MW 2025-26 (T-1) One Year Ahead Capacity Auction
KIMPTON WOOD SOLAR FARM, SHODDESDEN GRANGE, GREAT SHODDESDEN, ANDOVER SP11 9LP

This CMU component represents the BESS system of a co-located (solar and storage) site

LOW CARBON UK SOLAR OPERATIONS LIMITED CMU: LCB101 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 2.50 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Park Farm Solar and Battery, Shaftesbury Road, Gillingham, SP8 5JG

This CMU component represents the BESS system of a co-located (solar and storage) site

LOW CARBON UK SOLAR OPERATIONS LIMITED CMU: LCB104 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 5.03 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Birch Road, Colchester CO2 0EJ

This CMU component represents the BESS system of a co-located (solar and storage) site

LOW CARBON UK SOLAR OPERATIONS LIMITED CMU: LCB105 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 7.58 MW 2025-26 (T-1) One Year Ahead Capacity Auction
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY

A Battery Energy Storage System

HD639LEG LIMITED CMU: LEGA25 Storage (Duration 2h) CMU De-Rated N/A CMU DB: 15.48 MW 2025-26 (T-1) One Year Ahead Capacity Auction